ADITYA, ALRIANDA MARTA PUTRA (2016) KAJIAN TEKNIS OPTIMALISASI ALAT ANGKUT TERHADAP ALAT MUAT BERDASARKAN TARGET PRODUKSI PADA PT NEWMONT NUSA TENGGARA PROVINSI NUSA TENGGARA BARAT. Other thesis, UPN "VETERAN" YOGYAKARTA.
Preview |
Text
ABSTRAK.pdf Download (160kB) | Preview |
Abstract
Kegiatan pengangkutan merupakan salah satu kegiatan yang penting
adanya dalam suatu penambangan. Kegiatan pengangkutan bertujuan untuk
membawa segala jenis material baik inpit maupun expit ke lokasi berikutnya yang
telah direncanakan. Material yang diangkut pada penambangan Batu Hijau dibagi
menjadi berbagai macam yaitu, material waste (material yang tidak
menguntungkan untuk di tambang), material stockpile (material yang cukup
berharhga yang berguna untuk menambahkan saat kebutuhan akan ROM grade
kurang dari target produksi, material stockpile dibagi lagi menjadi 3 grade yaitu
low grade, medium grade, dan high grade.), lalu yang terakhir adalah ROM
grade(Material yang berharga paling tinggi dengan kualitas paling baik). Alat
yang digunakan untuk pengangkutan di penambangan Batu Hijau adalah haul
truck tipe CAT 793C dan CAT 793D, dan untuk mengetahui jumlah alat angkut
optimal yang akan digunakan dalam penambang tersebut pada setiap bulannya
terdapat banyak cara salah satunya adalah dengan membandingkan dengan target
produksi yang dimiliki oleh perusahaan.
Di PT. NNT penentuan jumlah alat angkut yang akan digunakan adalah
dengan menyesuaikan ketersediaan alat yang ada di lapangan, yang menyebabkan
jumlah alat angkut yang digunakan tidak optimal, oleh karena itu skripsi ini
diharapkan memberikan pandangan baru dalam penentuan jumlah tersebut dengan
menggunakan perbandingan target produksi yang berhubungan dengan waktu dari
cycle time alat muat dan alat angkut. Tujuan dilakukannya perhitungan alat ini
adalah agar didapat jumlah alat angkut yang optimal yang beroprasi pada setiap
bulannya berdasarkan perhitungan cycle time actual yang ada di lapangan.
Hauling was one of the essential activity that we do in mining activity.
Hauling activity was intend to haul any kind of material from mining activity.
Material that will be hauled from Batu Hijau mining was divided into, waste
material ( material that doesn’t make profit for company), stockpile material
(material that make profit for company but the quality not as good as ROM grade
so the its main task only to add the ROM grade if the target not reached just by the
ROM grade, stockpile material was divide into 3, low grade, medium grade, and
high grade), and the last but not least was the ROM grade (the most profitable
material the mine contain with the greatest quality).The haul equipment that was
used in Batu Hijau mine was CAT haul truck type 793C and 793D, and to know
how much unit that company need for mining activity in every months there was
so much way, and one of it was by matching with target production.
In PT. NNT for haul truck unit calculation the company used was the
availability of the unit itself, which is actually not really effective to determine
how much unit that was needed on that month, because of that, hope this paper
can give a new method for consideration that company can used in the future for
truck calculation with target production calculation that require the cycle time of
the haul truck itself. This paper was targeted to optimalized the number of truck
that needed on that month with its actual cycle time.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Darsini Darsini |
Date Deposited: | 13 May 2016 06:46 |
Last Modified: | 13 May 2016 06:46 |
URI: | http://eprints.upnyk.ac.id/id/eprint/889 |
Actions (login required)
![]() |
View Item |