PENINGKATAN PRODUKTIVITAS ALAT BOR PADA KUARI BATUGAMPING DI PT. INDOCEMENT TUNGGAL PRAKARSA Tbk PALIMANAN CIREBON JAWA BARAT

SUBAKTI ANWAR, FARID (2014) PENINGKATAN PRODUKTIVITAS ALAT BOR PADA KUARI BATUGAMPING DI PT. INDOCEMENT TUNGGAL PRAKARSA Tbk PALIMANAN CIREBON JAWA BARAT. Other thesis, UPN ''VETERAN'' YOGYAKARTA.

[img]
Preview
Text
ABSTRACT - FARID SUBAKTI ANWAR - 112060068.pdf

Download (15kB) | Preview

Abstract

Penambangan batugamping yang dilakukan PT. Indocement Tunggal Prakarsa Tbk terletak di Desa Palimanan Barat, Kecamatan Gempol, Kabupaten Cirebon, Provinsi Jawa Barat. Kegiatan penambangan yang telah dilakukan meliputi: pembabatan, pengupasan tanah penutup, pembongkaran, pemuatan dan pengangkutan. Proses pembongkaran batugamping menggunakan metode pengeboran dan peledakan. Salah satu faktor yang mempengaruhi kelancaran operasi peledakan antara lain tergantung pada kegiatan pengeboran. Pada kenyataan di lapangan produksi alat-alat bor di PT. ITP Tbk Palimanan Cirebon masih belum sesuai harapan, ini bisa dilihat dari produksi pengeboran batugamping nyata sebelum perbaikan dari alat-alat bor yang digunakan pada kuari penambangan batugamping PT. ITP Tbk Palimanan Cirebon adalah sebesar 2.057.323,09 Ton/tahun. Angka produksi pengeboran tersebut lebih kecil target produksi batugamping untuk klinker yaitu sebesar 3.366.469 Ton/tahun. Oleh karena itu, perlu diadakan peningkatan produktivitas alat-alat bor guna mencapai target produksi. Faktor-faktor yang mempengaruhi proses pengeboran dan berpengaruh terhadap produksi pengeboran antara lain adalah laju pengeboran, efisiensi waktu pengeboran, waktu kerja efektif, keahlian operator alat bor serta jarak spacing dan burden. Peningkatan waktu kerja efektif yang dilakukan dalam upaya meningkatkan produksi pengeboran adalah dengan cara menekan hambatan-hambatan yang masih dapat dihindari. Penambahan jarak spacing dan burden perlu dilakukan dengan tujuan supaya volume setara yang dihasilkan dapat lebih besar sehingga produksi pengeboran meningkat dan target produksi tercapai. Produksi pengeboran yang dihasilkan dengan upaya peningkatan adalah sebagai berikut: 1. Peningkatan waktu kerja efektif, yaitu mengurangi waktu hambatan yang dapat dihindari, maka dihasilkan produksi sebesar 3.045.389,137 Ton/tahun. 2. Peningkatan waktu kerja efektif dan penambahan jarak spacing dan burden, maka dihasilkan produksi sebesar 4.138.770,02 Ton/tahun yang memenuhi target produksi. kata kunci : produktivitas, pengeboran, peledakan. Limestone mining by PT. Indocement Tunggal Prakarsa Tbk Palimanan Cirebon West Java located in Palimanan Barat Village, District Gempol, Cirebon, West Java Province. Mining activities that have been done include: clearing, overburden stripping, dismantling, loading and transporting. Limestone unloading process using drilling and blasting method. One factors that affect maximum operation of blasting, among others is depending on drilling activity. In the reality drilling machines production in PT. ITP Tbk Palimanan Cirebon still does not meet expectations, it can be seen from the real drilling production of drilling machines used in mining limestone quarrying PT. ITP Tbk palimanan Cirebon before repairing. Drilling production amounted to 2,057,323.09 tons / year. Drilling production is smaller than limestone production target for clinker that equal to 3,366,469 tons / year. Therefore, there should be increasing the productivity of drilling machines to achieve production targets. Factors affecting the drilling process and affect the production rate of drilling are drilling rate, drilling time efficiency, effective working time, operator skills and distance carrier spacing and burden. Increasing the effective working time in an attempt to increase production by drilling are lowering barriers that still can be avoided. Imcreasing spacing and burden distance needs to be done for the goal of equal volume produced. It can be larger, so the drilling production increased and production targets achieved. There are the result of increasing drilling production: 1. Increasing effective working time, which reduces the time constraints that can be avoided, then the resulting production is 3,045,389.137 tons / year. 2. Increasing effective working time and increasing spacing and burden distance, then the result production is 4,138,770.02 tons / year. Meet production targets. Keywords: Productivity, Drilling, Basting

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Erny Azyanti
Date Deposited: 09 Nov 2016 08:59
Last Modified: 09 Nov 2016 08:59
URI: http://eprints.upnyk.ac.id/id/eprint/8626

Actions (login required)

View Item View Item