EVALUASI PENERAPANGROUND CONTROLMANAGEMENT PLANPADA TAMBANG BAWAH TANAH KENCANA PT. NUSA HALMAHERA MINERALS

TAMPUBOLON, ERWIN (2015) EVALUASI PENERAPANGROUND CONTROLMANAGEMENT PLANPADA TAMBANG BAWAH TANAH KENCANA PT. NUSA HALMAHERA MINERALS. Masters thesis, UPN ''VETERAN'' YOGYAKARTA.

[img]
Preview
Text
03. ABSTRACT.pdf

Download (75kB) | Preview
[img]
Preview
Text
04. RINGKASAN.pdf

Download (88kB) | Preview

Abstract

Perusahaan tambang wajib mempunyai rencana pengelolaan kontrol batuan, apakah itu tambang terbuka atau tambang bawah tanah. Tambang bawah tanah Kencana dimiliki oleh PT. Nusa Halmahera Minerals menyadari kebutuhan dan manfaat ini dan telah menggunakannya sejak tahun 2005. Permasalahan yang terjadi adalah massa batuan yang lemah dan berdampak pada waktu siklus penambangan. Dengan permasalahan yang ada, kemajuan rencana penambangan, kebutuhan produksi termasuk nilai cut-off grade telah mengakibatkan pentingnya melakukan evaluasi aplikasi GCMP (Ground Control Management Plan). GCMP terdiri dari petunjuk dan persyaratan sistem penyangga, analisa resiko dan kestabilan penggalian, dll. Tujuan dari penelitian ini adalah mengevaluasi aplikasi GCMP dan melihat peluang untuk meningkatkan kinerja produksi lebih baik lagi dengan menghasilkan waktu siklus penambangan lebih rendah dengan aman, tanpa berkompromi pada keselamatan kerja. Hal ini akan merupakan benefit jangka panjang kestabilan tambang. Dua hal yang dievaluasi terjadi pada batuan tipe 3 dan 4, dan berfokus mengurangi ketebalan beton tembak di batuan tipe 3 dan menggabungkan dua fase penyemprotan beton tembak masing-masing ketebalan 50 mm pada tiap lapisan menjadi satu fase penyemprotan dengan ketebalan beton tembak 100 mm. Metodologi penelitian mencakup ulasan mix design, pengumpulan data siklus penambangan dan kekuatan awal beton tembak. Berdasarkan hasil yang didapat, perbaikan signifikan siklus penambangan terjadi pada kedua tipe batuan dengan menghasilkan 28 % dan 29 % lebih cepat siklus penambangannya dibandingkan dengan sebelum dilakukan evaluasi, secara konsisten mencapai kekuatan awal 1 MPa dalam 60 menit. Hasil yang baik ini perlu untuk dijaga dan dievaluasi secara berkala dan penting untuk mengawasi standar dan aplikasi sistem penyanggaan dengan penerapan GCMP secara benar untuk mencapai produksi yang aman. Akan tetapi, hasil lain dari ulasan ini adalah masih ada peluang untuk mendapatkan penambangan dengan lebih produktif dengan melakukan tindak lanjut dan mengurangi waktu menunggu yang teridentifikasi dalam siklus penambangan. It is a mandatory for a mine company to have a management plan for ground control either a surface or underground mine. Underground Mine Kencana owned by PT. Nusa Halmahera Minerals realizes this needs and benefit and has established this management plan since 2005. The problem thatoccursis weak rock mass and impacted to cycle time to mine. With the ongoing issues, the advance of mining plan,physical production requirement including cut-off grade value have resulted the imperative of reviewing the application of GCMP (Ground Control Management Plan). GCMP consists of a ground support guideline, requirement, role and responsibility, geotechnical condition, data collection, risk assessment and excavation stability, etc. The purpose of this study is to evaluate the application of GCMP and see any opportunities to improve production performance better by having shorter mining cycle time safely, without compromising safety. This will be a benefit for long term mine stability. Two points reviewed happened in rock type 3 and 4 and focusing on reducing shotcrete thickness in rock type 3 and consolidating two passes of shotcrete spraying with 50 mm thickness each layer in rock type 4 into single pass shotcrete spraying with 100 mm thickness. Research methodology covers mix design review, data collection on mining cycle time and shotcrete early strength. Based on the result obtained, significant cycle time improvement appears to happened in both rock type by having 28 % and 29 % faster in cycle time compare to condition before review happened and consistently achieving 60 minutes on early strength to gain 1 MPa. This good result need to be maintained and reviewed regularly and it is important to supervise the ground support standard and application by implementing GCMP properly to achieve safe production. However, in the result of this evaluation, there is still opportunity to have more productive work in mining by follow upand reduce waiting time identified in mining cycle time.

Item Type: Thesis (Masters)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Erny Azyanti
Date Deposited: 03 Nov 2016 03:10
Last Modified: 03 Nov 2016 03:10
URI: http://eprints.upnyk.ac.id/id/eprint/8301

Actions (login required)

View Item View Item