GOBEL, ALIEFTIYANI PARAMITHA (2016) KAJIAN TEKNIS OPERASIONAL PENAMBANGAN TERHADAP BIAYA PRODUKSI TANAH PENUTUP DAN BATUBARA PADA PERMUKA TAMBANG BANKO BARAT TAHUN 2014 DI PT. BUKIT ASAM (PERSERO) TBK. TANJUNG ENIM. Other thesis, UPN "Veteran" Yogyakarta.
Preview |
Text
RINGKASAN.pdf Download (10kB) | Preview |
Preview |
Text
ABSTRACK.pdf Download (6kB) | Preview |
Abstract
RINGKASAN
Pit 3 Barat Banko Barat merupakanproyekpenambanganbatubaramilik PT. Bukit
Asam (Persero) Tbk. yang dikerjakanolehkontraktor PT. BangunKaryaPratamaLestari
(PT.BKPL). Proyekiniberlokasi di desaLingga, kecamatanLawangKidul,
KabupatenMuaraEnim, Provinsi Sumatera Selatan. PadaPit 3 Barat Banko Barat
selamapenambangantahun 2014 belummampumencapai target produksi yang
direncanakanolehpihakowner.
Berdasarkan data dilapangan, pencapaian target
produksitanahpenutupdanbatubarahanyasebesar 84% darirencana . Target
produksirencanaselamatahun 2014 adalah 4.490.000 bcmdan 1.600.000 ton
batubaradengan total biayaproduksisebesarRp. 157.602.542.
Sedangkanrealisasiproduksiselamatahun 2014 PT.BKPL hanyamencapai target
3.796.943 bcmtanahpenutupdan 1.389.548 ton batubara,dengan total
biayaproduksisebesar Rp.149.889.534.648.
Biayaproduksitanahpenutupdanabatubaradipengaruhiolehpencapaianproduksi.
BiayaproduksitanahpenutupdanbatubararencanaadalahRp. 35.101/bcmdanRp.
98.502/ton, sedangkanbiayaproduksitanahpenutupdanbatubararealadalahRp.
39.476/bcmdanRp. 107.869/ton.
Hal inidikarenakanadanyapenurunanefisiensikerja yang
mengakibatkanpenurunanproduktivitasperalatanmekanis.
Efisiensikerjadipengaruhiolehadanyahambatan-hambatan yang
terjadiselamakegiatanpenambangan. Upaya yang
dilakukanuntukmeningkatkanefisiensikerjaadalahdenganmengurangihambatanhambatanselama
proses kegiatanpenambangan.
Setelahdilakukanpeningkatanefisiensikerjamakaproduktivitasmeningkatdandapatmen
capai target produksi yang direncanakan.
Setelahdilakukanperbaikanmakabiayaproduksimenjadi
Rp.154.326.192.958denganbiayaproduksitanahpenutupRp.
37.808/bcmdanbatubaraRp.106.099 /ton.
ABSTRACT
West banko Pit 3 coal mining project is owned by PT. Bukit Asam (Persero)
Tbk., was working by PT. Bangun Karya Pratama Lestari Contractors. The project
is located in Lingga village, district Lawang Kidul, Muara Enim regency, South of
Sumatera province. At west Banko pit 3 during year 2014 there are no able to plan
production target by owner.
Based on data in field, accomplishment production target overburden and coal
only amount 84% from plan. Production target plan during year 2014 is 4.490.000
bcm overburden and 1.600.000 ton coal with total cost of production amount
Rp.157.602.542. Meanwhile actually production target in year 2014 only amount
3.796.943 bcm of overburden and 1.389.548 ton of coal, with total cost of
production amount Rp. 149.889.534.648. Production cost of overburden and coal
gives effect by production achieve. The plan production cost of overburden and
coal is amount Rp.35.101/bcm and Rp. 98.502/ton coal, while actually production
cost is amount Rp. 39.476/bcm overburden and 107.869/ton coal.
Because was found lower job efficiency until happened taking down of
productivities equipment. Job efficiency most effect by barriers was happened
during mining activity. Which means should do it for increase job efficiency is
substract the increase during mining take place. After that, then job efficiency and
productivities advanced and get the plan production target. After that do
improvement, so production cost become Rp. 154.326.192.958 with production
cost of overburden Rp. 37.808/bcm and Rp. 106.099/ton of coal.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TG Bridge engineering |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Basir Umaryadi |
Date Deposited: | 11 May 2016 07:32 |
Last Modified: | 11 May 2016 07:32 |
URI: | http://eprints.upnyk.ac.id/id/eprint/683 |
Actions (login required)
![]() |
View Item |