RANCANGAN KEBUTUHAN PERALATAN MEKANIS DALAM KEGIATAN PENAMBANGAN BATUBARA DI BLOK PALAS I, PT. GEO MINING ENERGY

SETYAWAN, TRIMIKA (2016) RANCANGAN KEBUTUHAN PERALATAN MEKANIS DALAM KEGIATAN PENAMBANGAN BATUBARA DI BLOK PALAS I, PT. GEO MINING ENERGY. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
e. abstract.pdf

Download (69kB) | Preview
[img]
Preview
Text
e. RINGKASAN.pdf

Download (91kB) | Preview

Abstract

RINGKASAN Peralatan produksi pada operasi penambangan merupakan salah satu sarana yang vital untuk menunjang target produksi akhir yang telah ditentukan oleh manajemen perusahaan. Pentingnya mengestimasi kinerja dan kemampuan produksi alat-alat mekanis/berat karena ada kaitannya dengan target produksi yang harus dicapai oleh perusahaan. Interaksi antara target produksi dengan produksi per unit alat mekanis/berat akan menentukan jumlah alat yang harus dibeli sesuai dengan kapasitas, jenis material yang akan ditangani dan tingkat kemudahan pengoperasian serta perawatannya. Pada sisi lain, pemilihan kapasitas alat mekanis / berat harus disesuaikan dengan kondisi lapangan, lingkungan, jalan masuk tambang dan sebagainya. Disamping itu, dengan bertambahnya jam operasi alat akan mengurangi kemampuannya yang pada akhirnya akan menurunkan kinerja alat, sehingga biaya operasi dan perawatan akan meningkat. Untuk mengetahui kemampuan suatu alat sudah menurun perlu dilakukan pengontrolan secara kontinyu terhadap kapabilitasnya yang diestimasi melalui perhitungan produksi alat tersebut PT. Geo Mining Energy merupakan perusahaan swasta yang bergerak di bidang pertambangan batubara. Perusahaan ini akan merencanakan segera membuka tambang batubara di wilayah IUP eksploitasi PT. GME yang berlokasi di Desa Binai, Kecamatan Tanjung Palas Timur, Kabupaten Bulungan, Provinsi Kalimantan Timur seluas 5.071 Ha. Untuk pengembangan rencana penambangan, perlu dilakukan pemilihan peralatan mekanis agar rencana penambangan tersebut dapat di dukung dengan data akurat dalam hal kemampugalian dan keserasian alat mekanis, guna memenuhi target produksi. Sistem penambangan yang akan digunakan oleh PT. GME adalah sistem tambang terbuka. Rencana kegiatan penambangan batubara yang akan diterapkan oleh PT. Geo Mining Energy menggunakan alat-alat mekanis berupa alat gali-muat (excavator) dan alat angkut (dump truck). Untuk kegiatan pemuatan dilakukan dengan 2 unit backhoe Komatsu PC600LC-8 untuk melayani 39 unit Dump Truck Scania P310 (6x2)dengan waktu kerja sebesar 18 jam/hari. Sasaran produksi untuk penambangan batu bara sebesar 10,900 Ton/hari. sedangkan rencana produksi alat muat dan alat angkut berdasarkan perhitungan teoritis untuk 2 unit backhoe Komatsu PC600LC-8 adalah sebesar 11,002.32 Ton/hari, dan 39 unit Dump Truck Scania P310 (6x2)sebesar 13,113.12 Ton/hari. Sedangkan untuk keserasian kerja alat didapatkan sebesar MF = 0.99 ABSTRACT Production equipment for mining operations is one of the vital means to support the final production target which has been determined by the Companies management. Estimating the importance of performance and production capabilities of heavy equipment because anything to do with production targets to be achieved by the company. Interaction between the production target per unit of production of heavy equipment will determine the number of devices that must be purchased in accordance with the capacity, the type of material to be handled and the level of ease of operation and maintenance. On the other hand, the selection of heavy equipment capacity must be adjusted to the field conditions, the environment, and so the mine entrance. In addition, by increasing the hours of operation will reduce the ability tool that will eventually degrade the performance of equipment, so that operation and maintenance costs will increase. To determine the ability of a device has been declining continuously needs to be done to control its versatility estimated through the calculation of the production tool PT. Geo Mining Energy is a multi national company engaged in coal mining. The company will plan soon open coal mines in the region IUP exploitation PT. GME is located in Binai village, Eastern District of Tanjung Palas, Bulungan, the province of East Kalimantan, covering an area of 5,071 Ha. For the development of the mining plan, necessary mechanical equipment selection so that the mining plan can be supported by accurate data in terms of a mechanical device of digging ability in order to meet production targets. Mining system to be used by PT. GME is a system of open-pit mining. Coal mining activity plan that will be implemented by PT. Geo Mining Energy use mechanical devices form-fit excavator and conveyances (dump truck). For loading activities carried out by two units backhoe Komatsu PC600LC-8 to serve 39 units of Scania Dump Truck P310 (6x2) with a working time of 18 hours / day. Subjected to mine coal production amounted to 10,900 tons / day. while the production plan of unloading and conveyances tools by theoretical calculations to 2 units backhoe Komatsu PC600LC-8 is at 11,002.32 tons / day, and 39 units of Scania Dump Truck P310 (6x2) of 13,113.12 tons / day. As for the match factor obtained by MF = 0.99.

Item Type: Thesis (Other)
Subjects: T Technology > TG Bridge engineering
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Basir Umaryadi
Date Deposited: 11 May 2016 06:56
Last Modified: 11 May 2016 06:56
URI: http://eprints.upnyk.ac.id/id/eprint/668