DEWA, YOGA INDRA (2016) ANALISIS KESTABILAN LERENG PADA PENAMBANGAN RAKYAT BATU KAOLIN DI DESA KARANGSARI, KECAMATAN SEMIN, KABUPATEN GUNUNGKIDUL, DAERAH ISTIMEWA YOGYAKARTA. Other thesis, UPN "Veteran" Yogyakarta.
Preview |
Text
1.Cover FIX.pdf Download (199kB) | Preview |
Preview |
Text
3.Ringkasan.pdf Download (161kB) | Preview |
Preview |
Text
5.Daftar Isi.pdf Download (14kB) | Preview |
Preview |
Text
pengesahan.pdf Download (932kB) | Preview |
Abstract
Lokasi penelitian berada di tambang rakyat batu kaolin Desa Karangsari,
Kecamatan Semin, Kabupaten Gunungkidul, Daerah Istimewa Yogyakarta.
Pembuatan lereng di tambang rakyat tersebut tidak didasarkan pada kajian
geoteknik, sehingga geometri lereng dibuat sama tanpa memperhatikan
karakteristik massa batuan di lokasi penelitian. Perlakuan terhadap geometri
lereng dengan mengabaikan karakteristik massa batuan pembentuknya
mempunyai tingkat keyakinan terhadap kestabilan lereng yang rendah.
Penelitian dilakukan untuk mengklasifikasikan massa batuan dengan
sistem rock mass rating (RMR) dan geological strenght index (GSI). Jenis batuan
yang akan diteliti adalah batu kaolin. Nilai RMR yang didapatkan dari
pembobotan lima parameter RMR pada lokasi penelitian adalah 48. Nilai GSI
Saptono (2012) merupakan pengurangan 8 dari nilai RMR, sehingga didapatkan nilai
GSI adalah 40. Sedangkan nilai GSI Hoek (1995) merupakan pengurangan 5 dari
nilai RMR sehingga didapatkan nilai GSI adalah 43.
Untuk mendapatkan nilai kohesi (c) dan sudut gesek dalam (ϕ) pada massa
batuan di lokasi penelitian digunakan metode Hoek & Brown (2002), metode
Saptono (2012) dan uji laboratorium. Nilai kohesi (c) dan sudut gesek dalam (ϕ)
menurut metode Hoek & Brown (2002) adalah 0,039 MPa dan 40,67
. Menurut
metode Saptono (2012) nilai kohesi (c) dan sudut gesek dalam (ϕ) adalah 0,294
MPa dan 42,5
o
. Hasil kohesi dan sudut gesek dalam dari uji laboratorium adalah
0,383 MPa dan 29,92
o
. Hasil dari nilai kohesi (c) dan sudut gesek dalam (ϕ) dari
ke tiga metode tersebut untuk mencari nilai faktor keamanan (FK) rekomendasi
untuk lereng yang diteliti.
Menganalisis faktor keamanan (FK) dari lereng yang diteliti diambil
variasi ketinggian lereng berbeda yaitu ketinggian lereng 6 m, 8 m dan 10 m.
Penentuan nilai FK yang ditentukan dari metode Saptono (2012) dan
keseimbangan batas masing-masing adalah 11,6 dan 4,62. Hasil tersebut diambil
dari data ketinggian lereng 6 m dan sudah sesuai dengan Kepmen Pertambangan
dan Energi No.555. K/26/M.PE/1995 tanggal 12 Mei 1995.
The research is located in traditional mining of kaolin at Karangsari,
District Semin, Gunungkidul City, Daerah Istimewa Yogyakarta. The mining
activity that is applied without making tiered slope. Slope manufacture in that
tradiotional mining is not based on geothecnical study, all geometry of slope is
made equal without observe the rock mass characteristic of research location. The
slope geometry treatment that neglect the rock mass characteristic has low
confidence level of slope stability.
The research was conducted to classify the rock mass with rock mass
rating (RMR) system and geological strenght index (GSI). The rock type that will
be inspected is kaolin. The RMR value that is obtained from five parameters of
RMR in the research location is 48. The GSI value according to Saptono (2012)
can be calculed by decreasing 8 of RMR value, so the GSI value is 40. While the
GSI value according to Hoek (1995) can be calculated by decreasing 5 of RMR
value, so the GSI value is 43.
To get the cohesion and friction angle (ɸ) of rock mass in the research
location that is used Hoek & Brown (2002) method, Saptono (2012) method and
laboratory test. The cohesion (c) and friction angle (ɸ) according to Hoek &
Brown (2002) method is 0,039 MPa and 40,67
o
. The cohesion (c) and friction
angle (ɸ) according to Saptono (2012) method is 0,294 MPa and 42,5
. The
cohesion (c) and friction angel (ɸ) according to laboratory test result is 0,383 MPa
and 29,92
o
. The results of cohesion (c) and friction angle (ɸ) from that three
methods are used to find safety factor recommendation for the slope that is
inspected.
For the safety factor of slope has taken variation of different slope height,
that is 6 m, 8 m, and 10 m. The determination of safety factor use Saptono (2012)
method and limit equilibrium method each is 11,6 and 4,62. That results is taken
from slope height 6 m and appropriate with Kepmen Pertambangan dan Energi
No.555. K/26/M.PE/1995.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Yuli |
Date Deposited: | 23 Sep 2016 02:52 |
Last Modified: | 23 Sep 2016 02:52 |
URI: | http://eprints.upnyk.ac.id/id/eprint/6652 |