RINGKASAN

Kajian teknis sistem penyaliran tambang di Pit BCMP PT. Jhonlin
Baratama mencakup analisis data curah hujan untuk menghitung debit total air
tambang sebagai dasar dalam perencanaan saluran terbuka, sumuran (sump),
perhitungan pompa dan kolam pengendapan.
Sistem Penyaliran Tambang di Pit BCMP adalah Mine Dewatering yaitu
upaya untuk mengalirkan air tambang yang telah masuk lubang bukaan tambang
menuju permukaan tanah di sekitar bukaan tambang dengan cara pemompaan.Air
tambang yang masuk lubang bukaan tambang berasal dari air hujan dan air
limpasan. Berdasarkan perhitungan data curah hujan diperoleh curah hujan
rencana sebesar 107,54 mm/hari dan intensitas curah hujan sebesar 37,28
mm/jam. Debit air hujan 0,32 m
3
/detik, debit air limpasan 4,15 m
3
/detik sehingga
total air tambang yang masuk lubang bukaan 4,37 m
3
/detik.
Air limpasan pada Pit BCMP ini dialirkan menuju sumuran melalui
saluran terbuka yang terdapat disisi lereng tambang. Saluran terbuka ini juga
digunakan untuk mengalirkan air dari lubang bukaan bekas tambang menuju
kolam pengendapan. Dimensi saluran terbuka I yaitu lebar permukaaan saluran
2,502 m, lebar dasar saluran 1,247 m, kedalaman saluran 1,082 m. Sementara
untuk dimensi saluran terbuka II yaitu lebar permukaan saluran 2,426 m, lebar
dasar saluran 1,209 m, kedalaman saluran 1,05 m.
Pada Pit BCMP telah terdapat sumuran dengan luas 4876 m
2
dan
kedalaman 3 m. Sumuran ini untuk sementara menampung debit air yang masuk
sebesar 8653,08 m
3
/jam. Air pada sumuran ini selanjutnya dipompa keluar
lubang bukaan tambang dengan menggunakan pompa Sykes Pump SP-HH 150.
Pompa ini mempunyai spesifikasi debit maksimal 540 m
3
/jam dengan julang
maksimal 98 meter.
Air tambang yang telah dipompa keluar bukaan tambang selanjutnya
dialirkan menuju kolam pengendapan. Kolam pengendapan ini mempunyai
dimensi panjang 60 m, lebar 40 m, tinggi 4 m, volume 9600 m3. Dari hasil
perhitungan, kolam ini dapat mengendapkan material sebesar 4223 m
3
/hari.
Dengan volume total 9600 m
3
, maka diperlukan pengerukan lumpur setiap 2 hari
agar endapan lumpur dapat berkurang.

ABSTRACT

Technical study of mine drainage system in pit BCMP PT Jhonlin
baratama includes analysis of precipitation data to calculate the total water
discharge mine as the basis for the open channel, sump, pumps calculation and
settling pond.
Mine Drainage System in pit BCMP is Mine Dewatering an effort to drain
water that mine has a hole in the openings of mine to the surface of land around
the mines with pump. Mining which in water holes openings mine derived from
rain water and some runoff. Based on the calculation of precipitation data
obtained rainfall plan for 107,54 mm/day and intensity of rainfall is 37,28
mm/hour. Debit of rain water 0,32 m
3
/second, debit of water runoff
4,15m
3
/second so the total mining which in water holes openings 4,37 m
3
/second.
Some runoff on this pit bcmp flowed toward sump through open drains
which are slope there are in mine .A tract of open is also applied to flow water
from the hole former mine to settling pond. dimensions of each channel I is wide
surface 2,502 m , wide base 1,247 m , the depth of the channel 1,082 m. While to
the dimensions of open drains II is the width of the surface of a channel 2,426 m ,
wide base 1,209 m , the depth of the channel 1.05 m.
On pit bcmp sump has there are with extensive 4876 m2 and the depth of 3
m. Sump this for a while accommodate water enters worth 8653,08 m
3
/hour.
Water at sump this next is pumped out of the hole openings mine by using pumps
sykes pump sp-hh 150 .These pumps have maximum specification discharge 540
m
3
/hour and maximum head of 98 meters.
The mine water clearing mines has been pumped out and sent to settling
pond. Settling pond has long dimensions 60 m , width of 40 m , 4 m high , the
volume of 9600 m3 .Of the result of reckoning , this settling pond can precipitate
material 4223 m
3
/day .To the volume of the total 9600 m
3
, then required dredging
mud every two days for mud sediment can be reduced.

Item Type: Thesis (Other)
Subjek: T Technology > TP Chemical technology
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Sarimin Sarimin
Date Deposited: 11 May 2016 06:47
Last Modified: 11 May 2016 06:47
URI: http://eprints.upnyk.ac.id/id/eprint/662

Actions (login required)

View Item View Item