ESTIMASI SUMBERDAYA BATU GRANIT BERDASRAKAN DATA GEOLISTRIK RESISTIVITY DUA DIMENSI DALAM PENYELIDIKAN BATU GRANIT DI PT. BINTAN KARISMA KABUPATEN BINTAN PROVINSI RIAU KEPULAUAN

Saputra, Riko (2015) ESTIMASI SUMBERDAYA BATU GRANIT BERDASRAKAN DATA GEOLISTRIK RESISTIVITY DUA DIMENSI DALAM PENYELIDIKAN BATU GRANIT DI PT. BINTAN KARISMA KABUPATEN BINTAN PROVINSI RIAU KEPULAUAN. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of RINGKASAN dan abstrak habis kolok.pdf]
Preview
Text
RINGKASAN dan abstrak habis kolok.pdf

Download (15kB) | Preview
[thumbnail of combinedPDF.pdf] Text
combinedPDF.pdf
Restricted to Repository staff only

Download (4MB)

Abstract

PT. Bintan Karisma Pratama yang terletak di Pulau Telan, Kecamantan Mantang, Kabupaten Bintan Pada Provinsi Riau Kepulauan, dengan luas sekitar
50,98 Hamenggunakan metode geolistrik.Pada prinsipnya pengukuran geolistrik
adalah untuk mendapatkan nilai tahanan jenis dari batuan penyusun perlapisan
bawah permukaan,mendapatkan nilai tahanan jenis batu granit pada daerah
penelitian, melokalisir dan memetakan daerah yang diduga berpotensi batu
granitserta mengetahui kedalaman dan penyebaran batu granit pada daerah penelitia, dan mengetahui sumberdaya batu granit pada daerah penelitian dengan bantuan paket program softwareGeosoft.
Pengukuran geolistrik menggunakan resistivity meter model ARES (automatic resistivity), dengan kofigurasi elektroda Wenner alphadengan spasi
elektroda 10m dan panjang lintasan 470m. Dengan metode ini kita dapat mengetahui kedalaman dan gambaran penyebaran batu granit pada daerah
penelitian secara 2 dimensi dari data resistivity yang sudah diketahui. Selanjutnya
dilakukan permodelan semi 3 dimensi agar dapat diketahui penyebaran batu Granit. Permodelan ini menjadi tujuan utama dari sehingga dapat mengetahui
bentuk penyebaran dan volume sumberdaya batu granit, baik batu granit fresh dan lapuk yang ada dilokasi penelitian.
Berdasarkan hasil penyelidikan batu Granit dengan metode geolistrik resistivity 2Dpada lokasi penelitian, dari 30 lintasan diperoleh 25 lintasan yang
diduga memiliki prospek batu granit. Pada bukit satu ada 9 lintasan yaitu lintasan 1, 2, 3, 4, 22, 23, 24, 25 dan 27. Pada bukit dua ada 16 lintasan yaitu lintasan 5, 6,
7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, dan 21. Yang tidak prospek ada 5 lintasan yaitu lintasan 20, 26 dan 28 ada di bukit satu, lintasan 29 dan 30 diantara
bukit satu dan dua.Volume total sumberdaya6.660.000m³,yangterdiridaribukitsatu
(1.807.200m3) danbukit dua(4.852.800m3)Dengandemikiandapatdijadikanpedomandalammengadakanpeneliti anlebihlanjutbagiperusahaan yang bersangkutan.

Kata kunci : Batu Granit, Resistivity 2D, Program RES2DINV,
Penampang resistivity2D,Permodelan 3D.

PT. BintanKarisma pratamalocated on Telanisland, District Mantang,
Bintan regency in Riau islands Province, with an area of approximately 50.98
hectares using geoelectric method. In principle the measurement of geoelectric is
to get the value of resistivity of rocks making up the bedding under the surface,
get the value of resistivity of granite in the area of research, locate and map areas
suspected of potentially granite as well as the depth and spread of granite in the
area empirically, and identifying resources granite in the research area with the help of Geosoft software program package.
Geoelectric measurements using a resistivity meter model of ARES
(automatic resistivity), with elecktroda spacing 10m and line length 470m with
this method we can know the depth and picture spread of granite in the research
area are two-dimensional resistivity of the data is already known. Furthermore, the spring 3-dimensional modeling in order to know the spread of granite stone.
This model became the main destination of so as to determine the shape and
volume of resource deployment granite, both fresh andweathered granite that exist
inthe location of the study.
Based on the results of the investigation Granite stone with 2D resistivity
geoelectric method on the, from 30 line obtained 25 prospects granite. On the hill
there are 9 track is track 1, 2, 3, 4, 22, 23, 24, 25 and 27. On two hills there are 16
tracks, namely tracks 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19 and 21.
With no prospect of that track 5 track 20, 26 and 28 are on one hill, the track 29
and 30 between the hills one and two. The total volume of resources660.000m³,
which consists of a single hill (1.807.200m3) and hill two (4.852.800m3) Thus it
can be used as guidelines in conducting further research for the company
concerned.

Keywords: Granite Stone, Resistivity, RES2DINV Program, 2D Cross Sections,

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 11 May 2016 02:22
Last Modified: 07 Oct 2022 07:49
URI: http://eprints.upnyk.ac.id/id/eprint/604

Actions (login required)

View Item View Item