PENENTUAN TITIK BOR DARI DATA GEOLISTRIK – RESISTIVITY 2D DAN GEOMAGNET DALAM PENYELIDIKAN BIJIH BESI DI PT. ASIA BUANA METALINDO, KABUPATEN LAMPUNG TENGAH, BANDAR LAMPUNG

Martabrata, R. Omar (2016) PENENTUAN TITIK BOR DARI DATA GEOLISTRIK – RESISTIVITY 2D DAN GEOMAGNET DALAM PENYELIDIKAN BIJIH BESI DI PT. ASIA BUANA METALINDO, KABUPATEN LAMPUNG TENGAH, BANDAR LAMPUNG. Other thesis, UPN "VETERAN" YOGYAKARTA.

[thumbnail of ABSTRAK.pdf]
Preview
Text
ABSTRAK.pdf

Download (173kB) | Preview

Abstract

ABSTRACT
Prediction of the spread of iron ore in the region of PT. Buana Asia
Metalindo using geoelectric and geomagnetic methods. Geoelectric measurements
using a resistivity meter model of ARES (Automatic Resistivity) and geomagnetic
measurements using a magnetometer GEM SYSTEM.
In principle, geoelectric measurements is to obtain resistivity values of the
constituent rock bedding under the surface , while the geomagnetic measurement
is to determine the value of the magnetic anomaly arising from subsurface rock
constituent . However, if only using the two methods so the hematite iron ore
can’t be detected , therefore , the addition of the geoelectric measurements the
method Induced Polarization ( IP ) , this method is a method to detect the presence
of metal levels based on the decay time when the electric current is switched off
suddenly. With these three methods it is known the existence of magnetite iron
ore and hematite iron ore. The geoelectrical investigation use a Wenner – Alpha
configuration. It was restricted to the variation determination of resistance
subsurface according to vertical and horizontal. The geomagnetic method is used
because iron ore having a magnet can provide a image about spread of iron ore at
subsurface based on the anomaly of a magnetic field.
Based on data acquisition, processing and data interpretation of
geomagnetic and geoelectrical, there are several cross section of measurement
having iron ore potential. cross section which is considered as prospects for detail
investigated by core drilling in line:
a) Titik bor 1 di lintasan 1 pada koordinat X= 175174, Y= 9442780
b) Titik bor 2 di lintasan 1 pada koordinat X= 175133, Y= 9444888
c) Titik bor 3 di lintasan 2 pada koordinat X= 175510, Y= 9442431
d) Titik bor 4 di lintasan 2 pada koordinat X= 175519, Y= 9442332
e) Titik bor 5 di lintasan 3 pada koordinat X= 175468, Y= 9442386
f) Titik bor 6 di lintasan 3 pada koordinat X= 175546, Y= 9446798
g) Titik bor 7 di lintasan 4 pada koordinat X= 175161, Y= 9442306
h) Titik bor 8 di lintasan 7 pada koordinat X= 175131, Y= 9442288
i) Titik bor 9 di lintasan 8 pada koordinat X= 174716, Y= 9442146

vii

Item Type: Thesis (Other)
Subjek: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Sarimin Sarimin
Date Deposited: 11 May 2016 02:21
Last Modified: 11 May 2016 02:21
URI: http://eprints.upnyk.ac.id/id/eprint/603

Actions (login required)

View Item View Item