RINGKASAN
Salah satu kegiatan pembongkaran di PT. BUMA (PT. Bukit Makmur
Mandiri Utama) Job Site Senakin adalah pengupasan lapisan tanah penutup.
Kegiatan ini didahului dengan proses pemberaian menggunakan metode
pemboran dan peledakan. Salah satu efek terhadap lingkungan dari kegiatan
peledakan yaitu adanya getaran tanah (ground vibration). Kegiatan peledakan
yang dilakukan di Pit 1E menghasilkan getaran tanah yang sangat beresiko
terhadap kondisi lingkungan sekitar jika tidak dikontrol dengan baik.
PT. BUMA menetapkan batasan PPV (Peak Particle Velocity)
berdasarkan acuan dari SNI 7571 Tahun 2010 yaitu kurang dari 2 mm/s. Setelah
dilakukan pengukuran ternyata ada beberapa kondisi dimana getaran tanah
melebihi batasannya yaitu lebih dari 2 mm/s. Adapun beberapa kondisi tersebut
nilai PPV mencapai 2,14 mm/s sampai 5,42 mm/s.
Pada kondisi saat ini, setelah dianalisis faktor-faktor terkontrol yang
mempengaruhi getaran tanah dapat melebihi batas aman di Pit 1 E yaitu jarak
antara lokasi pengukuran dan lokasi peledakan, isian bahan peledak per delay,
ketersediaannya bidang bebas pada lokasi peledakan dan geometri peledakan.
Setelah membandingkan pendekatan dengan perhitungan prediksi PPV teoritis
berdasarkan metode Giorgio Berta, metode persamaan regresi linier berganda dan
metode USBM (United States Bureau of Mines), dapat diperoleh metode yang
paling mendekati untuk memprediksi isian maksimum per delay pada jarak
tertentu agar besarnya getaran tanah tidak melebihi batas aman yaitu dengan
metode USBM.
Berdasarkan pendekatan dengan metode USBM dilakukan perhitungan
nilai konstanta perambatan dan didapat nilai K nya adalah 1144,67. Kemudian
dapat ditetapkan isian maksimum per delay pada jarak tertentu. Pada jarak 525 m
yang merupakan buffer zone ditetapkan isian maksimum per delay nya 54 kg.

ABSTRACT
One of loosening activity in PT. BUMA (PT. Bukit Makmur Mandiri
Utama) Job Site Senakin is removing the overburden. This activity preceded by
loosening process using drilling and blasting methods. One of the effect of
blasting activity toward the environment is ground vibration. The blasting activity
which is carried out in Pit 1 E produce ground vibration which is give negative
effects toward environment if it does not well controlled.
PT. BUMA has been drow up the maximum limit of PPV (Peak Particle
Velocity) by SNI 7571 at 2010 that is 2 mm/s. After the measuring process, it is
founded that there are several conditions where the ground vibration above limit
level 2 mm/s. The PPV of those conditions reached 2,14 mm/s up to 5,42 mm/s.
In this time, the researcher has analyzed and founded the independent
variables that influence ground vibration to above the maximum limit in Pit 1 E,
that are the distance between measuring and blasting locations, blasting agent
weight for per delay, the available free face on the blasting location and blasting
geometry. After comparing the approaches among the calculation of PPV
theoritical prediction based on Giorgio Berta’s method, multiple linear regression
equation method and USBM (United States Bureau of Mines) method, can be
concluded that the most aprropriate method to predict the maximum blasting agen
weight for per delay on the certain distance in order to the ground vibration does
not above the maximum limit, is USBM method.
The calculation of removing constanta use the approach of USBM method
which resulted K value 1144,67. With this result, the blasting agent weight for per
delay on the certain distance can be drown up in the buffer zone 525 m, that is
54 kg for per delay

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 16 Aug 2016 04:22
Last Modified: 16 Aug 2016 04:22
URI: http://eprints.upnyk.ac.id/id/eprint/5305

Actions (login required)

View Item View Item