Abstract

Perusahaan PT. Supra Bara Energi yang masih dalam tahap eksplorasi
memerlukan Penaksiran Sumberdaya untuk perencanaan penambangan batubara
di Kecamatan Sambaliung, Kabupaten Berau Propinsi Kalimantan Timur. Data
eksplorasi yang ada berupa data bor. Data yang didapatkan, dianalisa agar dapat
memberikan suatu gambaran endapan batubara dan jumlah tonnase batubara di
daerah penelitian tersebut.
Metode penelitian yang akan diterapkan dalam penelitian ini adalah
metode penaksiran sumberdaya menggunakan metode cross section rule of
gradual change .Tujuannya untuk mengetahui berapa besar cadangan batubara
terbukti.
Batubara yang diteliti yaitu memiliki struktur lebih dari satu lapisan
batubara (multi seam)dengan kemiringan 420. Pedoman perubahan bertahap (rule
of gradual change) dilakukan dengan menghubungkan penampang satu dengan
penampang lainnya, sehingga setiap perhitungan volume dibatasi oleh dua
penampang dan diperoleh cadangan seluruhnya sebesar 2.392.390 ton.
Besarnya tanah penutup (over burden) dengan pedoman perubahan
bertahap (rule of gradual change) sebesar 30.696.750 BCM.

PT Supra Bara Energi wich still in exploration stage need resource
estimation for mine planning in Sambaliung district, Berau state, province of East
Kalimantan. Collected exploration is from drilling data. Collected data is analized
to make image of coal sedimentation and ammount of coal tonage in the
observation location.
Observation method wich used in this research is resource estimation
based on cross section with rule of gradual change. The purpose is to understand
how much the reserve is proven.
The structure ofcoal wich observed is having more than one seam with dip
angle is 42˚. Rule of gradual change is by conected the one section to other
section, so every volume count is limited by two section and the result of total
reserve is 2.392.390 tons.
The ammount of over burden wih rule of gradual change is
30.696.750BCM

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Erny Azyanti
Date Deposited: 16 Aug 2016 04:17
Last Modified: 16 Aug 2016 04:17
URI: http://eprints.upnyk.ac.id/id/eprint/5304

Actions (login required)

View Item View Item