SAPUTRA, PRADITIA DECKY (2012) KAJIAN TEKNIS SISTEM PENIRISAN TAMBANG BATUBARA DI PT. BINA SARANA SUKSES KABUPATEN TAPIN PROVINSI KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyakarta.
|
Text
RINGKASAN.pdf Download (8kB) | Preview |
|
|
Text
ABSTRACT.pdf Download (8kB) | Preview |
Abstract
RINGKASAN PT. Bina Sarana Sukses merupakan perusahaan yang bergerak dalam industri pertambangan sebagai kontraktor pertambangan. Lokasi penelitian dilaksanakan di Desa Idamanggala, Kecamatan Lokpaikat, Kabupaten Tapin, Provinsi Kalimantan Selatan. Permasalahan yang terjadi dalam Pit Warutte MS 03 PT. Bina Sarana Sukses adalah masih banyak terdapat genangan air pada lantai kerja yang menempati cekungan-cekungan sisa penambangan. Hal ini dikarenakan tidak ada saluran terbuka yang megalirkan air menuju sumuran serta dimensi sumuran yang ada tidak mampu untuk menampung air limpasan sehingga menyebabkan terjadinya genangan dilokasi penambangan pada saat terjadi hujan. Oleh karena itu perlu dilakukannya pengkajian terhadap sistem penyaliran yang ada pada Pit Warutte MS 03. Sumber utama air tambang pada lokasi penambangan adalah air hujan. Setelah dilakukan analisa terhadap data curah hujan tahun 2001-2010 diperoleh curah hujan rencana sebesar 102.9 mm dengan dengan intensitas curah hujan sebesar 35.67 mm/jam pada periode ulang hujan selama 3 tahun. Resiko hidrologi yang terjadi sebesar 86.83%. Hasil pengamatan di lapangan terdapat satu daerah tangkapan hujan seluas 0.13 km2 dengan koefisien limpasan total sebesar 0.7 yang terdiri dari koefisiean topografi (Ct) 0.26, koefisien tanah (Cs) 0.16 dan koefisien vegetasi (Cv) 0.28. Debit air limpasan yang masuk pada lokasi penambangan dialirkan menuju sumuran dengan saluran terbuka yang diletakan di bagian selatan Pit. Rincian dimensi saluran terbuka yang diusulkan adalah: panjang sisi saluran (a) 0.9 m, kedalaman air (h) 0.7 m, lebar dasar saluran (b) 0.8 m, lebar atas saluran (t) 1.7 m, kedalaman saluran (d) 0.8 m, dan tinggi jagaan (f) 0.1 m. Sumuran yang ada di lokasi pertambangan batubara PT. Bina Sarana Sukses berupa cekungan yang terjadi karena sisa pekerjaan tambang pada elevasi terendah dari pit bottom. Diketahui volume sumuran sebelum dilakukan penelitian sebesar 2025 m3 pada elevasi 60 mdpl. Dengan menggunakan debit air yang masuk ke dalam area penambangan maka dapat dicari dimensi dari sumuran, lama pemompaan. Hasil perhitungan didapat dimensi sumuran yaitu dengan panjang 38 m, lebar 31 m dan kedalaman 5 m dengan daya tampung sebesar 5090 m3. Waktu pemompaan hasil perhitungan selama 13 jam perhari. Untuk dimensi kolam pengendapan masih mencukupi untuk menampung air dari sumuran dengan panjang 66 m, lebar 35 meter dan kedalaman 5 meter sebanyak 3 kompartemen. Akan tetapi perlu adanya jadwal dari pengerukan lumpur untuk kolam pengendapan yang dilakukan setiap 42 hari sekali. ABSTRACT PT. Bina Sarana Sukses is a company engaged in the mining industry as mining contractors. Location of research conducted in the Village Idamanggala, District Lokpaikat, Tapin District, Banjarmasin, South Kalimantan. The problems that occur in the Pit Warutte MS 03 PT. Bina Sarana Sukses is still a lot of puddles on the floor there is work that occupies the rest of the mining basins. This is because the loss of open channels on the work floor due to mining activities as well as the dimensions of the existing wells are not able to accommodate water runoff that results in a puddle of mining location in the event of rain. Therefore it is necessary to do an assessment of the existing system drainage on the Pit Warutte MS 03. The main source of mine water at the mine site is rainwater. After an analysis of rainfall data obtained in 2001-2010 rainfall of 102.9 mm with a plan with a rainfall intensity of 35.67 mm/hour on the return period rainfall for 3 years. Hydrological risks that occur at 86.83%. From the observation in the field there is a rain catchment area runoff coefficient 0.13 km2 with a total of 0.7 consisting of topography coefficient(Ct) 0.26, soil coefficient (Cs) 0.16, and the vegetation coefficient (Cv) 0.28. Discharge runoff water entering the mine flowed into the wells with open tubes placed in the south pit. Details of the proposed open channel dimensions are: length of the channel (a) 0.9 m, water depth (h) 0.7 m, width of the channel bottom (b) 0.8 m, width of the channel (t) 1.7 m, channel depth (d) 0.8 m, and high-surveillance (f) 0.1 m. Existing wells in the coal mine PT. Bina Sarana Sukses of the basin that occurs because the rest of mine workings in the lowest elevation of the pit bottom. Known volumes of wells prior to 2025 m3 of research on the water surface elevation 60 masl. By using water discharge into the mining area can be searched then the dimension of the wells, old pumping. From the calculation results obtained from wells which dimensions of length 38 m, width 31 m and a depth of 5 m with a capacity of 5090 m3. When pumping the calculation results for 13 hoursper day. For dimensions of pool precipitation is sufficient to accommodate the water from the wells with a length of 66 m, width of 35 meters and a depth of 5 feet as much as three compartments. However, the need for a schedule of dredging mud deposition carried out to the pool every 42 days.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 16 Aug 2016 04:11 |
Last Modified: | 16 Aug 2016 04:11 |
URI: | http://eprints.upnyk.ac.id/id/eprint/5303 |
Actions (login required)
View Item |