KAJIAN TEKNIS SISTEM PENYALIRAN TAMBANG PADA LOKASI PENAMBANGAN BAUKSIT PT. PUTRA ALAM LESTARI, KENDAWANGAN, KETAPANG KALIMANTAN BARAT

FEBRIANTO, DIAN (2012) KAJIAN TEKNIS SISTEM PENYALIRAN TAMBANG PADA LOKASI PENAMBANGAN BAUKSIT PT. PUTRA ALAM LESTARI, KENDAWANGAN, KETAPANG KALIMANTAN BARAT. Other thesis, UPN ''VETERAN'' YOGYAKARTA.

[img]
Preview
Text
ABSTRACT.pdf

Download (86kB) | Preview

Abstract

Lokasi penambangan bijih bauksit terletak di Desa Kelampai, Kecamatan Kendawangan, Kabupaten Ketapang, Provinsi Kalimantan Barat. Air yang masuk ke tempat kerja berasal dari akumulasi air hujan yang langsung masuk kedalam Pit dan air limpasan (Runoff) yang berasal dari puncak-puncak bukit diluar Pit. Pencegahan yang tidak ada serta penanganan air yang lambat akan menyebabkan genangan air didalam Pit dan sulit untuk dikeringkan. Terdapat 4 Daerah Tangkapan Hujan antara lain: DTH I luasnya 0,24km2, Debit air limpasan 1,7413m3/detik; DTH II luasnya 0,64km2, Debit 3,9085 m3/detik; DTH III luasnya 0,06km2, Debit0,2902 m3/detik sedangkan luas DTH IV adalah 0,09km2, Debit 0,4353 m3/detik. Maka luas DTH seluruhnya adalah 1,47km2. Rancangan dimensi saluran terbuka yang diusulkan sebanyak tiga saluran ,antara lain : Saluran 1 (a) 0,6m, (b) 0,6m, (B) 1,2m, (h) 0,6m, (A) 0,5m2, (S) 0,5%,(m) 600; Saluran 2 (a) 1,2m, (b) 1,2m, (B) 2,5m, (h) 1,2m, (A) 2m2 ; (S) 0,5%, (m) 600; Saluran 3 (a) 1,6m, (b) 1,5m, (B) 3,0m, (h) 1,3m, (A) 3,2m2, (S) 0,5%, (m) 600. Sumuran yang ada dilokasi PT. Putra Alam Lestari adalah merupakan sumuran permanen yang berada pada elevasi terendah dari pit bottom. Diketahui volume sumuran pada saat penelitian 12.192m3 pada elevasi permukaan air 17mdpl. Hasil perhitungan sumuran yang ada pada saat ini dengan debit aktual pompa 576m3/jam telah mampu menampung air limpasan 6300m3/jam yaitu dengan volume 8.017m3. Waktu pemompaan hasil perhitungan menjadi 7 jam perhari. Head total yang dihasilkan pompa MFC 385 yang kapasitas maksimum 800m3/jam dengan debit aktualnya 576m3/jam adalah 8,222m yang terdiri dari : julang statis 7m, kehilangan julang gesek 0,8m, kehilangan julang pada belokan 0,408m, dan julang kecepatan 0,014m. Air hujan yang dialirkan melalui saluran akan langsung dialirkan menuju kolam pengendapan. Sedangkan air hujan yang telah masuk kedalam lokasi penambangan akan dipompa keluar dan kemudian dialirkan melalui saluran menuju ke kolam pengendapan. Pompa yang dibutuhkan adalah sebanyak 1 buah pompa. Dimensi kolam pengendapan panjang 70m, lebar 47m dan kedalaman 4m. Bauxite ore mine located in the village Kelampai, District Kendawangan, Ketapang District, West Kalimantan Province. Water entering the workplace comes from the accumulation of rain water directly into the Pit and water runoff (runoff) from the hilltops outside the Pit. No prevention and treatment of water that slowly will cause standing water in the Pit and difficult to dry. There are 4 Regional Catchment area, among others: the extent of 0,24 km2 DTH I, Debit 1,7413 m3 water runoff; DTH II extent of 0,64 km2, Debit 3,9085 m3; DTH III extent of 0,06 km2, Debit 0,2902 m3 / sec while the vast DTH IV is 0,09 km2, Debit 0,4353 m3. Then the area is 1,47 km2 DTH entirely. The design dimensions of the proposed open channel three chanels are: Chanel 1 (a) 0,6m, (b) 0,6m, (B) 1,2m, (h) 0,6m, (A) 0,5m2, (S) 0,5%,(m) 600; Chanel 2 (a) 1,2m, (b) 1,2m, (B) 2,5m, (h) 1,2m, (A) 2m2 ; (S) 0,5%, (m) 600; Chanel 3 (a) 1,6m, (b) 1,5m, (B) 3,0m, (h) 1,3m, (A) 3,2m2, (S) 0,5%, (m) 600. Sump at the site PT. PUTRA Alam Lestari is a permanent sump are at the lowest elevation of the pit bottom. Given the volume of research 12.192m3 sump at the water surface elevation 17mdpl. The results of the calculations in the existing wells with actual pump discharge 576m3/jam been able to accommodate water runoff is the volume 6300m3/hr 8.017m3. When pumping the calculation to 7 hours per day. The resulting total head the pump MFC 385 with a maximum capacity 800m3/jam 576m3/hr actual discharge is 8,222m consisting of: 7m static looming, looming loss of friction 0,8 m, loss looming on the curves 0,408 m, and 0,014 m high towering. Rain water that flowed through the channel will be directly channeled into settling ponds. While rain water has entered the mine site will be pumped out and then passed through the channel leading to the settling ponds. Required pump is pumping as much as 1 unit. Dimension settling ponds length 70 m, width of 47m and a depth of 4m.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Erny Azyanti
Date Deposited: 16 Aug 2016 03:54
Last Modified: 16 Aug 2016 03:54
URI: http://eprints.upnyk.ac.id/id/eprint/5295

Actions (login required)

View Item View Item