PERANCANGAN TEKNIS PENAMBANGAN BATUBARA PT. BORNEO BRIKOKS INDUSTRI, KECAMATAN TELUK BAYUR, KABUPATEN BERAU, PROVINSI KALIMANTAN TIMUR

ABEL, HORI (2011) PERANCANGAN TEKNIS PENAMBANGAN BATUBARA PT. BORNEO BRIKOKS INDUSTRI, KECAMATAN TELUK BAYUR, KABUPATEN BERAU, PROVINSI KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of 02.Ringkasan.pdf]
Preview
Text
02.Ringkasan.pdf

Download (93kB) | Preview
[thumbnail of 02. Abstract.pdf]
Preview
Text
02. Abstract.pdf

Download (73kB) | Preview

Abstract

RINGKASAN
Konsesi PT. Borneo Brikoks Industri memiliki luas sebesar 80ha.
Berdasarkan hasil survei lapangan dan kegiatan pemboran eksplorasi dijumpai
sebanyak 6 seam (lapisan) batubara di blok A, B, C, D, E, dan F dengan ketebalan
antara 0,5-4m. Arah umum penyebaran batubara (strike) berkisar N190oE, dan
sudut penunjaman (dip) berkisar 62º. Berdasarkan penaksiran cadangan yang
dilakukan pada semua blok diperoleh total cadangan sebesar 945.726ton. Batas SR
(stripping ratio) penambangan 14:1.
Permasalahan pada penelitian ini ialah PT. Borneo Brikoks Industri perlu
melakukan perancangan teknis penambangan batubara yang aman dan ekonomis
sehingga target produksi bisa tercapai. Metode penyelesaian masalah dilakukan
dengan pengolahan data sekunder yang meliputi data eksplorasi dan pemboran,
sehingga menghasilkan permodelan geologi, penaksiran cadangan, perancangan
pit penambangan, dan penjadwalan produksi batubara.
Hasil yang diperoleh untuk penjadwalan produksi batubara pada daerah
telitian, yang dilakukan selama 5 tahun yakni:
a. Rancangan pada tahun pertama produksi batubara adalah sebesar 225.719
ton, dengan pengupasan overburden sebesar 3.176.279 bcm, SR 14:1.
b. Rancangan pada tahun kedua produksi batubara adalah sebesar 225.719
ton, dengan pengupasan overburden sebesar 3.176.279 bcm, SR 14:1.
c. Rancangan pada tahun ketiga produksi batubara adalah sebesar 225.719
ton, dengan pengupasan overburden sebesar 3.176.279 bcm, SR 14:1.
d. Rancangan pada tahun keempat produksi batubara adalah sebesar
225.719 ton, dengan pengupasan overburden sebesar 3.176.279 bcm, SR
14:1.
e. Rancangan pada tahun kelima atau akhir penambangan hanya sampai
bulan kedua dan berdasarkan kajian teknis maupun ekonomis dari pihak
perusahaan mengajukan untuk diambil batubara dengan produksi sebesar
42.850 ton, dan pengupasan overburden sebesar 1.556.800,44 bcm, SR
36:1.
Jumlah total produksi selama lima tahun adalah 945.726 ton, dengan nilai
stripping ratio (SR) seluruh penambangan adalah 14:1. Penimbunan overburden
dilakukan secara outside dump serta pada tahun kedua sampai kelima dilakukan
backfilling di sebelah timur pit penambangan.

ABSTRACT
Concession of PT. Borneo Brikoks Industri has an area of 80 ha. Based on
the result of field surveys and exploration drilling activities as much as 6 seam
coal is found in block A, B, C, D, E, and F with a thickness between 0,5 - 4 m.
The general direction of the spread of coal strike N1900E, and the angle of
subduction dip 620. Based on reserve assessments conducted on all block obtained
a total reserve of 945.726 ton. Mine stripping ratio limit 14:1.
Problems in this study is PT.Borneo Brikoks Industri needs to do the
technical design of coal mining, which is safe and economical so that production
targets can be achieved. Methods of problem solving done by the secondary data
processing which includes data exploration and drilling, resulting in geological
modeling, calculation of reserves, design pit mining, and coal production
scheduling.
The results obtained for coal in the area of production scheduling, conducted
over 5 years namely :
a. The design in the first year of coal production amounted to 225.719
tons, with overburden stripping of 3.176.279 bcm, SR 14:1.
b. The design in the second year of coal production amounted to
225.719 tons, with overburden stripping of 3.176.279 bcm, SR 14:1.
c. The design in the third year of coal production amounted to 225.719
tons, with overburden stripping of 3.176.279 bcm, SR 14:1.
d. The design in the fourth year of coal production amounted to
225.719 tons, with overburden stripping of 3.176.279 bcm, SR 14:1.
e. The design in the fifth year or the end of mining only until the
second month and based on technical and economic assessment of
the company proposed to take coal with production of 42.850 tons,
and stripping overburden of 1.556.800, 44 bcm, with SR 36:1.
Total production for five years was 945.726 tons, with value of all mining
stripping ratio is 14:1. Stockpiling overburden dump is done outside as well as in
the second to fifth be backfilling the east pit mining.

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 16 Aug 2016 03:38
Last Modified: 16 Aug 2016 03:38
URI: http://eprints.upnyk.ac.id/id/eprint/5291

Actions (login required)

View Item View Item