RANCANGAN SISTEM PENYALIRAN TAMBANG PADA PIT TUTUPAN PT. PAMAPERSADA NUSANTARA KABUPATEN TABALONG PROVINSI KALIMANTAN SELATAN

NURYADI, RAHMAT (2016) RANCANGAN SISTEM PENYALIRAN TAMBANG PADA PIT TUTUPAN PT. PAMAPERSADA NUSANTARA KABUPATEN TABALONG PROVINSI KALIMANTAN SELATAN. Other thesis, UPN "VETERAN" YOGYAKARTA.

[img]
Preview
Text
2. ABSTRACT.pdf

Download (8kB) | Preview
[img]
Preview
Text
1. COVER OK.pdf

Download (1MB) | Preview
[img]
Preview
Text
LEMBARPENGESAHAN.pdf

Download (871kB) | Preview

Abstract

Pit Tutupan is a coal mining project owned by PT. Adrao Indonesia as the holder of Perjanjian Karya Pengusahaan Pertambangan Batubara (PKP2B) which is located in the district of Tanjung, South Kalimantan Province. PT. Pamapersada is a trustworthy contractor to undertake mining activities in the pit Tutupan by using open-pit mining system. In open-pit mining system, high rainfall will potentially disrupt mining operations. To overcome these problems, the system required good mine drainage system. The planning of mine drainage system at PT. Pamapersada begins with rainfall analysis, the calculation of the rainfall discharge plan, the design of open channel, sump, and pumping systems. Based on analysis of rainfall data for the year 2001 - 2015, obtained a dail y plan rainfall of 110 mm, 24,06 mm/h rainfall intensity with 3-year return period rainfall and hydrology risk by 86.83%. The location of Catchment area is divided into three catchment, namely DTH I (sump elevation -174) = 4.4 km 2 , DTH II (sump elevation -185) = 6.2 km 2 , and DTH III (sump 0) = 0.85 km 2 . Rain water discharge at DTH I is (sump elevation -174) = 26,48 m 3 / sec, DTH II (sump -185) = 37,32 m 3 / sec, DTH III (sump elevation 0) = 5,11 m 3 / sec. The design of the pit Tutupan open channel is trapezoidal with the dimensions varies by segments. The dimensions are the bottom width between 0.40 to 2 meters, the top width between 0.80 to 4.30 meters, and the depth between 0.40 to 2 meters. Requirement number of primary pump are 5 units with each pump has 600 m 3 /h water discharge at sump elevation -174, 7 units pumps at sump -185 with water discharge of each pump are 880 m3 / h, and 10 units pumps at sump West elevation 0 with water discharge of each pump are 600 m3 / sec. The sump requirement volume is 412.890 m3 at sump -174 wells, 749.909 m3 at sump elevation -185, and 630.794 m3 at sump West elevation 0. Pumps used in the design are MULTIFLO MFVC Type-420E.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Mrs Sri Lestari
Date Deposited: 21 Jul 2016 04:44
Last Modified: 21 Jul 2016 04:44
URI: http://eprints.upnyk.ac.id/id/eprint/4891

Actions (login required)

View Item View Item