PERENCANAAN PRODUKSI MENGGUNAKAN METODE GOAL PROGRAMMING (Studi Kasus di Bakpia Pathuk 75, Yogyakarta)

ELLIA H. HUTAGAOL, YAN (2015) PERENCANAAN PRODUKSI MENGGUNAKAN METODE GOAL PROGRAMMING (Studi Kasus di Bakpia Pathuk 75, Yogyakarta). Other thesis, UPN ''VETERAN'' YOGYAKARTA.

[thumbnail of ABSTRAK.pdf]
Preview
Text
ABSTRAK.pdf

Download (83kB) | Preview

Abstract

Yogyakarta merupakan salah satu kota di Indonesia yang dijadikan objek
wisata oleh turis mancanegara maupun turis lokal, dan salah satu kuliner wisata
khas Yogyakarta adalah Bakpia. Bakpia Pathuk 75 adalah produsen bakpia
pertama di Indonesia yang sudah sangat berkembang dan mampu bertahan
ditengah persaingan yang ketat. Pihak manajemen tentunya ingin mendapatkan
pendapatan yang besar dengan berusaha memproduksi bakpia sebanyak mungkin
untuk memenuhi seluruh permintaan yang ada. Memaksimalkan output produksi
ini diikuti dengan ekspektasi dari pihak Bakpia Pathuk 75 untuk meminimalkan
biaya produksi yang dikeluarkan dan tentunya dengan mempertimbangkan
kapasitas mesin yang tersedia. Hal ini membuat keuntungan yang didapatkan
perusahaan akan lebih tinggi.
Perencanaan produksi dengan tujuan dari pihak manajemen yang
kontradiktif ini dapat dikaji dengan menggunakan metode Goal Programming.
Goal Programming adalah salah satu metode dalam pengambilan keputusan
multi kriteria yang dapat memberikan solusi optimal dari permasalahan yang
memiliki banyak tujuan yang kontradiktif satu dengan yang lainnya, memiliki
target untuk setiap tujuannya, serta terdapat penalti yang merupakan hukuman
atas tidak tercapainya tujuan yang kontradiktif tersebut.
Jenis varian rasa dari bakpia yang menjadi objek penelitian adalah
kacang hijau (X1), coklat (X2), keju (X3), kumbu hitam (X4), coklat krispi (X5), dan
keju krispi (X6). Perencanaan produksi dilakukan rata-rata per 5 hari dan per 6
hari untuk bulan April, Mei, dan Juni. Perhitungan dengan menggunakan metode
Goal Programming ini menghasilkan kombinasi produk yang optimal. Kombinasi
produk untuk perencanaan produksi bulan April adalah: X1=13.422 unit,
X2=3.213, X3=2.953, X4=2.487, X5=530, X6=539 dengan total biaya sebesar
Rp.463.530.480. Sementara, perencanaan produksi untuk bulan Mei adalah:
X1=13.822 unit, X2=3.104, X3=2.852, X4=2.400, X5=512, X6=520 dengan total
biaya sebesar Rp.463.502.552. Dan hasil untuk bulan Juni adalah: X1=13.420
unit, X2=3.211, X3=2.956, X4=2.488, X5=530, X6=539 dengan total biaya sebesar
Rp. 463.529.000.
Kata kunci: perencanaan produksi, pengambilan keputusan multi kriteria,
metode goal programming

Yogyakarta is one of the cities in Indonesia which is become a tour object
by local tourists or international tourists, and one of special foods from
Yogyakarta name Bakpia. Bakpia Pathuk 75 is the first bakpia producer in
Indonesia which is widely developed and able to stand in the tight competition.
Absolutely, the management wants to earn a huge profit by trying to produce as
many as they could to fulfill all demands. Maximizing production of output is
followed by another expectation from Bakpia Pathuk 75 to minimize production
cost that they should pay. This thing would increase a profit that the company will
get.
Production planning having contradictory purposes from management
could be analyzed with Goal Programming Method. Goal Programming is one of
multi criteria decision making methods which could give an optimum solution
from the problems having many purposes, having a target for each purpose and
also has a penalty describing a punishment of a failure of achieving a
contradictory company’s purpose.
Variations of bakpia which become research object are kacang hijau (X1),
coklat (X2), keju (X3), kumbu hitam (X4), coklat krispi (X5), dan keju krispi (X6).
Production planning is executed for, the average, per 5 days and per 6 days for
April, May, and June. The calculation by using Goal Programming method results
an optimum combination product. The combination product for April is:
X1=13.422 unit, X2=3.213, X3=2.953, X4=2.487, X5=530, X6=539, with total cost
is Rp.463.530.480. Meanwhile, production planning for Mei is: X1=13.822 unit,
X2=3.104, X3=2.852, X4=2.400, X5=512, X6=520 with total cost is
Rp.463.502.552. And the result for June is: X1=13.420 unit, X2=3.211, X3=2.956,
X4=2.488, X5=530, X6=539 with total cost is Rp. 463.529.000.
Keywords: production planning, multi criteria decision making (MCDM), goal
programming method

Item Type: Thesis (Other)
Subjek: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Erny Azyanti
Date Deposited: 14 Jul 2016 04:07
Last Modified: 14 Jul 2016 04:07
URI: http://eprints.upnyk.ac.id/id/eprint/4745

Actions (login required)

View Item View Item