PENGENDALIAN PERSEDIAAN PADA KONDISI KETIDAKPASTIAN PERMINTAAN DAN LEAD TIME MENGGUNAKAN METODE SIMULASI MONTE CARLO (Studi Kasus Pada UD. Makmur Jaya , Kebumen – Jawa Tengah )

Tri Prayogo, Anggi (2015) PENGENDALIAN PERSEDIAAN PADA KONDISI KETIDAKPASTIAN PERMINTAAN DAN LEAD TIME MENGGUNAKAN METODE SIMULASI MONTE CARLO (Studi Kasus Pada UD. Makmur Jaya , Kebumen – Jawa Tengah ). Other thesis, UPN ''VETERAN'' YOGYAKARTA.

[img]
Preview
Text
Abstrak.pdf

Download (106kB) | Preview

Abstract

UD. Makmur Jaya merupakan salah satu pelaku industri genteng yang ada di kecamatan Pejagohan kabupaten Kebumen, Jawa tengah. UD Makmur Jaya merupakan industri yang bersifat make to stock dan proses produksi yang dijalankan perusahaan masih sangat tradisional. Produk yang dihasilkan didistribusikan untuk memenuhi kebutuhan pasar Jawa Tengah. Untuk memenuhi kebutuhan persediaan, UD. Makmur Jaya belum menerapkan perencanaan persediaan dengan baik. Perencanaan persediaan hanya di lakukan dengan pememesan bahan baku yang sekali pemesanannya hanya untuk kebutuhan produksi selama satu bulan. Tetapi terkadang jumlah yang direncanakan tidak mencukupi dan kadang kala terjadi penumpukan persediaan. Pengendalian persediaan pada UD. Makmur Jaya ini dilakukan pada kondisi ketidakpastian permintaan dan lead time dengan pendekatan EOQ dan Safety stock disertai dengan simulasi monte carlo untuk menentukan simulasi permintaan dan lead time. Di tambah bantuan VBA pada Microsoft excel untuk menentukan total biaya paling minimum dengan proses simulasi selama 60 bulan periode, dengan mengkombinasikan EOQ dan ROP. Dari hasil perhitungan dan dari hasil simulasi yang dibuat berdasarkan pada data penelitian yang dilaksanakan di UD. Makmur Jaya, dapat disimpulkan dengan menggunakan metode EOQ dan ROP tanpa simulasi maka didapatkan Q* tanpa simulasi sebesar 60615 dan ROP tanpa simulasi sebesar 19087 yang bila dikombinasikan maka, total cost selama periode 60 bulan sebesar Rp 487.150.510,34 dan total cost/tahun sebesar Rp 97.430.102,33. Sedangkan apabila menggunakan EOQ dan ROP yang telah di simulasikan dan dilakukan pengulangan perhitungan dengan bantuan VBA di Microsoft excel didapat Q* sebesar 28615 dan ROP sebesar 16887 dengan total cost sebesar Rp 470.301.166,81 dan total cost / tahun sebesar RP 94.060.233,36. maka hasil perhitungan total cost diketahui, bila UD. Makmur Jaya menggunakan kombinasi EOQ dan ROP berdasarkan hasil simulasi maka dapat meminimalkan biaya sebesar Rp 3.369.868,97. Kata kunci : Persediaan, Ketidakpastian permintaan dan lead time, simulasi monte carlo. UD. Makmur Jaya is one of tile industries in sub-district pejagohan kabupaten kebumen, central java. UD. Makmur Jaya an industry that is both make to stock and the production process which is carried on the company still very traditional. A product produced distributed to meet the needs of the market central java. To meet the needs of the supply, ud.Prosperous jaya has not implemented the planning supplies well. Planning supplies only in pememesan do with the raw material that once pemesanannya only to the needs of production for a month. But sometimes the number of planned are not sufficient and sometimes accumulation occurs supplies. Control supplies at UD. Makmur Jaya was being conducted in the condition of uncertainty demand and lead time with the approach eoq and safety stock accompanied with the simulation monte carlo simulation to determine demand and lead time. In addition to assistance vba in microsoft excel to determine the total cost of the most minimum with the process of the simulation over 60 months a period of , with combined EOQ and ROP. Of the result of reckoning and from the results of a simulation made based on data on its reserach in UD. Makmur Jaya, it can be concluded by using the method EOQ and ROP without a simulation then obtained Q* without a simulation of 60615 and rop without a simulation of 19087 that when combined then , the total cost over a period of 60 months as much as Rp 487.150.510,34 and total cost / years amounting to Rp 97.430.102,33 . While if using and ROP and EOQ that has been in simulasikan and repetition calculation done with the help of vba in microsoft excel obtained Q* of 28615 and ROP of 16887 with a total cost amounting to Rp 470.301.166,81 and total cost / years amounting to Rp 94.060.233,36 . Then the result of reckoning known total cost , if UD. Makmur Jaya uses a combination EOQ and ROP simulation based on the results it can be minimize the cost as much as Rp 3.369.868,97 . ` The keywords: inventories, uncertainty demand and lead times, simulating monte carlo

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Erny Azyanti
Date Deposited: 13 Jul 2016 04:17
Last Modified: 13 Jul 2016 04:17
URI: http://eprints.upnyk.ac.id/id/eprint/4713

Actions (login required)

View Item View Item