Tri Prayogo, Anggi (2015) PENGENDALIAN PERSEDIAAN PADA KONDISI KETIDAKPASTIAN PERMINTAAN DAN LEAD TIME MENGGUNAKAN METODE SIMULASI MONTE CARLO (Studi Kasus Pada UD. Makmur Jaya , Kebumen – Jawa Tengah ). Other thesis, UPN ''VETERAN'' YOGYAKARTA.
Preview |
Text
Abstrak.pdf Download (106kB) | Preview |
Abstract
UD. Makmur Jaya merupakan salah satu pelaku industri genteng yang ada di
kecamatan Pejagohan kabupaten Kebumen, Jawa tengah. UD Makmur Jaya merupakan
industri yang bersifat make to stock dan proses produksi yang dijalankan perusahaan
masih sangat tradisional. Produk yang dihasilkan didistribusikan untuk memenuhi
kebutuhan pasar Jawa Tengah. Untuk memenuhi kebutuhan persediaan, UD. Makmur Jaya
belum menerapkan perencanaan persediaan dengan baik. Perencanaan persediaan hanya
di lakukan dengan pememesan bahan baku yang sekali pemesanannya hanya untuk
kebutuhan produksi selama satu bulan. Tetapi terkadang jumlah yang direncanakan tidak
mencukupi dan kadang kala terjadi penumpukan persediaan.
Pengendalian persediaan pada UD. Makmur Jaya ini dilakukan pada kondisi
ketidakpastian permintaan dan lead time dengan pendekatan EOQ dan Safety stock
disertai dengan simulasi monte carlo untuk menentukan simulasi permintaan dan lead
time. Di tambah bantuan VBA pada Microsoft excel untuk menentukan total biaya paling
minimum dengan proses simulasi selama 60 bulan periode, dengan mengkombinasikan
EOQ dan ROP.
Dari hasil perhitungan dan dari hasil simulasi yang dibuat berdasarkan pada
data penelitian yang dilaksanakan di UD. Makmur Jaya, dapat disimpulkan dengan
menggunakan metode EOQ dan ROP tanpa simulasi maka didapatkan Q* tanpa simulasi
sebesar 60615 dan ROP tanpa simulasi sebesar 19087 yang bila dikombinasikan maka,
total cost selama periode 60 bulan sebesar Rp 487.150.510,34 dan total cost/tahun sebesar
Rp 97.430.102,33. Sedangkan apabila menggunakan EOQ dan ROP yang telah di
simulasikan dan dilakukan pengulangan perhitungan dengan bantuan VBA di Microsoft
excel didapat Q* sebesar 28615 dan ROP sebesar 16887 dengan total cost sebesar Rp
470.301.166,81 dan total cost / tahun sebesar RP 94.060.233,36. maka hasil perhitungan
total cost diketahui, bila UD. Makmur Jaya menggunakan kombinasi EOQ dan ROP
berdasarkan hasil simulasi maka dapat meminimalkan biaya sebesar Rp 3.369.868,97.
Kata kunci : Persediaan, Ketidakpastian permintaan dan lead time, simulasi monte
carlo.
UD. Makmur Jaya is one of tile industries in sub-district pejagohan kabupaten
kebumen, central java. UD. Makmur Jaya an industry that is both make to stock and the
production process which is carried on the company still very traditional. A product
produced distributed to meet the needs of the market central java. To meet the needs of the
supply, ud.Prosperous jaya has not implemented the planning supplies well. Planning
supplies only in pememesan do with the raw material that once pemesanannya only to the
needs of production for a month. But sometimes the number of planned are not sufficient
and sometimes accumulation occurs supplies.
Control supplies at UD. Makmur Jaya was being conducted in the condition of
uncertainty demand and lead time with the approach eoq and safety stock accompanied
with the simulation monte carlo simulation to determine demand and lead time.
In addition
to assistance vba in microsoft excel to determine the total cost of the most minimum with
the process of the simulation over 60 months a period of , with combined EOQ and ROP.
Of the result of reckoning and from the results of a simulation made based on data
on its reserach in UD. Makmur Jaya, it can be concluded by using the method EOQ and
ROP without a simulation then obtained Q* without a simulation of 60615 and rop without
a simulation of 19087 that when combined then , the total cost over a period of 60 months
as much as Rp 487.150.510,34 and total cost / years amounting to Rp 97.430.102,33 .
While if using and ROP and EOQ that has been in simulasikan and repetition calculation
done with the help of vba in microsoft excel obtained Q* of 28615 and ROP of 16887 with
a total cost amounting to Rp 470.301.166,81 and total cost / years amounting to Rp
94.060.233,36 . Then the result of reckoning known total cost , if UD. Makmur Jaya uses a
combination EOQ and ROP simulation based on the results it can be minimize the cost as
much as Rp 3.369.868,97 . `
The keywords: inventories, uncertainty demand and lead times, simulating monte carlo
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Erny Azyanti |
Date Deposited: | 13 Jul 2016 04:17 |
Last Modified: | 13 Jul 2016 04:17 |
URI: | http://eprints.upnyk.ac.id/id/eprint/4713 |