ANALISIS ERGONOMI PENGOPERASIAN ALAT BOR MEKANIS JENIS JACKLEG UNTUK PEMASANGAN GROUND SUPPORT TAMBANG BAWAH TANAH DOZ PT. FREEPORT INDONESIA

BRATA, AULIAWAN TRI (2011) ANALISIS ERGONOMI PENGOPERASIAN ALAT BOR MEKANIS JENIS JACKLEG UNTUK PEMASANGAN GROUND SUPPORT TAMBANG BAWAH TANAH DOZ PT. FREEPORT INDONESIA. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
RINGKASAN PDF.pdf

Download (6kB) | Preview
[img]
Preview
Text
ABSTRACT PDF.pdf

Download (61kB) | Preview

Abstract

Kegiatan kemajuan pembuatan lubang bukaan tambang bawah tanah (development) di lokasi DOZ (Deep Ore Zone) PT. Freeport Indonesia dilakukan dengan cara pemboran dan peledakan. Kegiatan yang dilakukan setelah terbentuknya lubang bukaan tersebut adalah pemasangan penyanggaan lubang bukaan (ground supporting). Jenis penyangga yang pertama kali dipasang pada lubang bukaan baru tersebut adalah rock bolt dan wire mesh. Pemasangan rock bolt dan wire mesh dilakukan dengan menggunakan bor mekanis jackleg, karena lubang bukaan yang baru saja terbentuk ukurannya tidak terlalu besar dan tidak memungkinkan bila dilakukan pengeboran dengan menggunakan jumbo drill. Penggunaan mesin bor mekanis jackleg sangat rentan dengan resiko bahaya ergonomi (ergononomic hazard) karena penggunaan mesin bor jenis ini masih menuntut kekuatan fisik operator dalam pengoperasiannya, sehingga perlu dilakukan analisis ergonomi untuk mengetahui tingkat resiko dari pengoperasian mesin bor tersebut. Metode yang digunakan pada penelitian ini adalah Rapid Entire Body Assessment (REBA) yaitu suatu metode yang dapat menganalisis suatu level resiko ergonomi secara cepat dari postur kerja suatu pekerja, selanjutnya adalah metode Low Back Compressive Force Model yaitu metode yang mampu mengestimasi beban yang diterima tulang punggung pada saat melakukan pekerjaan, metode yang terakhir adalah Utah Shoulder Moment Estimation yaitu metode yang mampu mengestimasi beban yang diterima oleh bahu pada saat melakukan pekerjaan. Berdasarkan Analisis dengan ketiga metode diatas, mayoritas pekerjaan pemasangan rock bolt dan wesh (ground supporting) didapatkan hasil level resiko yang tinggi dan memerlukan tindakan perbaikan untuk menghindari resiko ergonomi. Development in the DOZ Undergroung Mine PT. Freeport Indonesia is do by drilling and blasting. The first activity after the hole (stope) from the result of drilling and blating was made are ground supporting, the kind of the ground support is rock bolt and wire mesh. The proccess of bolting (with rock bolt and wire mesh) using jackleg drill, because the new hole is not too large, and not possible if using jumbo drill. The use of jackleg drill is very close with ergonomic hazard, because this activity still demand the operator’s physic power, because that this activity is necessary to do analysis of ergonomic for the purpose to detect the level of risk from the activity ground supporting use jackleg drill. This research using three methods to analysis the level of risk in ergonomic hazard, the first method is Rapid Entire Body Assessment (REBA) is the method which can analyzing the level of risk in ergonomic hazard on fast way the work posture of the operator. The second method is Low Back Compressive Force Model, is the method which can estimating load which received by low back when the operator do the work. The last method is Utah Shoulder Moment Estimation, is the method which can estimating load which received by shoulder when the operator do the work. Based on analyzing from the theree method, majority the level risk of ground supporting is result high level of ergonomic hazard, becase that the correction act needed to keep clear from the ergonomic hazard.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 23 Jun 2016 01:31
Last Modified: 23 Jun 2016 01:31
URI: http://eprints.upnyk.ac.id/id/eprint/4263

Actions (login required)

View Item View Item