KAJIAN TEKNIS EXCAVATOR BACKHOE CATERPILLAR 385 BK 83 TERHADAP BIAYA PRODUKSI LAPISAN TANAH PENUTUP PADA PENAMBANGAN PIT 3 BARAT BANKO BARAT DI PT. BUKIT ASAM (PERSERO) TBK. TANJUNG ENIM

SAPUTRA, RIYANTO DWI (2016) KAJIAN TEKNIS EXCAVATOR BACKHOE CATERPILLAR 385 BK 83 TERHADAP BIAYA PRODUKSI LAPISAN TANAH PENUTUP PADA PENAMBANGAN PIT 3 BARAT BANKO BARAT DI PT. BUKIT ASAM (PERSERO) TBK. TANJUNG ENIM. Other thesis, UPN "VETERAN" YOGYAKARTA.

[thumbnail of 3 COVER.pdf]
Preview
Text
3 COVER.pdf

Download (212kB) | Preview
[thumbnail of 4 HALAMAN PENGESAHAN.pdf]
Preview
Text
4 HALAMAN PENGESAHAN.pdf

Download (258kB) | Preview
[thumbnail of 2 ABSTRAK.pdf]
Preview
Text
2 ABSTRAK.pdf

Download (69kB) | Preview
[thumbnail of 5 DAFTAR ISI.pdf]
Preview
Text
5 DAFTAR ISI.pdf

Download (265kB) | Preview

Abstract

RINGKASAN
Pit 3 Barat Banko Barat merupakan proyek penambangan batubara milik PT.
Bukit Asam (Persero) Tbk. Tanjung Enim yang dikerjakan oleh kontraktor PT.
Bangun Karya Pratama Lestari (PT.BKPL). Proyek ini berlokasi di desa Lingga,
kecamatan Lawang Kidul, Kabupaten Muara Enim, Provinsi Sumatera Selatan.
Pada Pit 3 Barat Banko Barat selama penambangan bulan November 2015 belum
mampu mencapai target produksi yang direncanakan oleh pihak owner.
Berdasarkan data dilapangan, pencapaian target produksi tanah penutup
adalah sebesar 61,74% dari rencana. Target produksi rencana selama bulan
November 2015 adalah 130.000 bcm tanah penutup dengan total biaya rental alat
excavator backhoe CAT 385 BK 83 sebesar Rp. 600.053.265. Sedangkan realisasi
produksi selama bulan November 2015 adalah 80.271 bcm tanah penutup dengan
total biaya rental alat excavator backhoe CAT 385 BK 83 sebesar Rp.
497.758.470. Biaya produksi tanah penutup dipengaruhi oleh pencapaian
produksi. Biaya produksi tanah penutup rencana adalah Rp. 4.615 /bcm,
sedangkan biaya produksi tanah penutup real adalah Rp. 6.200 /bcm.
Hal ini dikarenakan adanya penurunan efisiensi kerja yang mengakibatkan
penurunan produktivitas peralatan mekanis. Efisiensi kerja dipengaruhi oleh
adanya hambatan-hambatan yang terjadi selama kegiatan penambangan. Upaya
yang dilakukan untuk meningkatkan efisiensi kerja adalah dengan mengurangi
atau meniadakan hambatan-hambatan selama proses kegiatan penambangan.
Setelah dilakukan peningkatan efisiensi kerja maka produktivitas meningkat dan
dapat mencapai target produksi yang direncanakan. Setelah dilakukan perbaikan
maka biaya rental alat menjadi Rp. 611.482.851 dengan biaya produksi tanah
penutup Rp. 5.013 /bcm.

ABSTRACT
Pit Barat 3 Banko Barat is a coal mining project owned by PT. Bukit Asam
(Persero) Tbk. Tanjung Enim carried out by contractors PT. Bangun Karya
Pratama Lestari (PT.BKPL). The project is located in the village of Linga,
Lawang Kidul districts, Muara Enim, South Sumatra Province. In the Pit Barat 3
Banko Barat during mining activity in November 2015 have not been able to
achieve production targets planned by the owner.
Based on field data, the target of the overburden production amounted to
61.74% of the plan. Production target plan of November 2015 was 130.000
bcm overburden and the total heavy equipment rent cost of excavator backhoe
CAT 385 BK 83 is Rp. 600.053.265. Where as the actual production of
November 2015 is 80.271 bcm overburden with the total heavy equipment rent
cost of excavator backhoe CAT 385 BK 83 is Rp. 497.758.470. Overburden
production costs are affected by the achievement of production. Overburden
production costs plan is Rp. 4.615 /bcm, while the real cost of overburden
production is Rp. 6.200 /bcm.
This is happened due to a decrease in work efficiency resulting in decreasing
productivity of heavy equipment. Work efficiency is influenced by the hitch that
occurs during mining operations. In order to improve the working efficiency,
things to do is reducing or eliminating the hitch during the process of mining
operations. After upgrading, the efficiency of the productivity will be increasing
and could reach the production target plan. After repairing, the cost of heavy
equipment rent cost becomes Rp. 611.482.851 with the cost of overburden
production is Rp. 5.045 / bcm.

Item Type: Thesis (Other)
Subjek: T Technology > T Technology (General)
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Basir Umaryadi
Date Deposited: 21 Jun 2016 02:31
Last Modified: 21 Jun 2016 02:31
URI: http://eprints.upnyk.ac.id/id/eprint/4059

Actions (login required)

View Item View Item