PERAMALAN PRODUKSI DAN ESTIMASI CADANGAN DENGAN METODE DECLINE CURVE ANALYSIS PADA SUMUR GLO-02 & GLO-04 LAPANGAN “GLO”

SANJAYA, LEONARDUS GLODION KEVIN (2024) PERAMALAN PRODUKSI DAN ESTIMASI CADANGAN DENGAN METODE DECLINE CURVE ANALYSIS PADA SUMUR GLO-02 & GLO-04 LAPANGAN “GLO”. Other thesis, UPN Veteran Yogyakarta.

[thumbnail of 6. Skripsi Full Text_113170121_Leonardus Glodion Kevin Sanjaya.pdf] Text
6. Skripsi Full Text_113170121_Leonardus Glodion Kevin Sanjaya.pdf
Restricted to Repository staff only

Download (2MB)
[thumbnail of 1. Cover_113170121_Leonardus Glodion Kevin Sanjaya.pdf] Text
1. Cover_113170121_Leonardus Glodion Kevin Sanjaya.pdf

Download (131kB)
[thumbnail of 3. Abstrak_113170121_Leonardus Glodion Kevin Sanjaya.pdf] Text
3. Abstrak_113170121_Leonardus Glodion Kevin Sanjaya.pdf

Download (107kB)
[thumbnail of 2. Halaman Pengesahan_113170121_Leonardus Glodion Kevin Sanjaya.pdf] Text
2. Halaman Pengesahan_113170121_Leonardus Glodion Kevin Sanjaya.pdf

Download (181kB)
[thumbnail of 4. Daftar Isi_113170121_Leonardus Glodion Kevin Sanjaya.pdf] Text
4. Daftar Isi_113170121_Leonardus Glodion Kevin Sanjaya.pdf

Download (184kB)
[thumbnail of 5. Daftar Pustaka_113170121_Leonardus Glodion Kevin Sanjaya.pdf] Text
5. Daftar Pustaka_113170121_Leonardus Glodion Kevin Sanjaya.pdf

Download (107kB)

Abstract

Well in Oil & Gas field need to estimated the reserve and how long the well can be
produced. This is to ensure the economical of the well and how to develop the well.
Decline curve Analysis (DCA) one of many methods to determine hydrocarbon
reserves by utilize the principle of extrapolation or continuing linear trend on the
graph containing plot of rate vs time. This method is applied on “GLO” Field to
determine its reserves and the time of the well still could be economically produced.
By first identify the suitable type of DCA on “GLO” Field.
Type of DCA is identified by trial error and X2 chisquare test. Start from filtering
the well parameters data such as the open reservoir zone to ensure all the processed
data already met the requirement of Decline Curve Analysis. Example: count of
active well should be constant for DCA per field/ per reservoir/ per block. Then
determine the decline period. DCA is carried out on historical production that has
a relatively constant trend and does not have any changing completion. After that
forcasting the oil rate on each b value (decline constanta) which is exemolified and
compare it to actual oil rate (chisquare). Decline constanta with the lowest
cumulative chisquare ti the selected type of DCA which representive actual data
the most. To calculate the reserves, projection of the trend line untuk the rate
economic limit. In this case is 15 STB/D atau 450 STB/M.
From forcasting production and reserve estimation with DCA from well of GLO�02 & GLO-04 “GLO” Field resulting type of DCA representing the most actual
production data is exponential with decline rate (D) 0.018 per month or 21.6% per
year for GLO-02 and decline rate (D) 0.019 per month or 22.8% per year for GLO�04 with estimated reserve 80.36 MSTB oil for GLO-02 and 46.69 MSTB oil for
GLO-04 that could be produced until 1-Aug-2030 or 6 years 7 months later for
GLO-02 and 1-Mar-2027 or 4 years 9 months later for GLO-04 in the same
condition (no changes).
Keyword: decline curve analysis, reserve, economic limit

Item Type: Thesis (Other)
Uncontrolled Keywords: decline curve analysis, reserve, economic limit
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: A.Md.SI Indah Lestari Wulan Aji
Date Deposited: 31 Jul 2024 07:01
Last Modified: 31 Jul 2024 07:01
URI: http://eprints.upnyk.ac.id/id/eprint/40538

Actions (login required)

View Item View Item