PENANGANAN MASALAH KEPASIRAN PADA SUMUR “MR-14” LAPANGAN “RUS”

ALWIES, MUHAMMAD RUSLI (2024) PENANGANAN MASALAH KEPASIRAN PADA SUMUR “MR-14” LAPANGAN “RUS”. Other thesis, UPN Veteran Yogyajarta.

[thumbnail of ABSTRACT.pdf] Text
ABSTRACT.pdf

Download (40kB)
[thumbnail of COVER.pdf] Text
COVER.pdf

Download (80kB)
[thumbnail of DAFTAR ISI.pdf] Text
DAFTAR ISI.pdf

Download (294kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (290kB)
[thumbnail of LEMBAR PENGESAHAN.pdf] Text
LEMBAR PENGESAHAN.pdf

Download (193kB)
[thumbnail of Skripsi full text.pdf] Text
Skripsi full text.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

ABSTRACT
HANDLING OF SAND PROBLEMS IN WELL
“MR-14” FIELD “RUS”
By
Muhammad Rusli Alwies
NIM: 113180030
(Petroleum Engineering Undergraduated Program)
The RUS field is an oil field located in the Jambi sub-basin, part of the South Sumatra basin. One
of the wells in the RUS field is the MR-14 well, which has not yet undergone evaluation. The
effective layer of this well is in the Talang Akar Formation, which consists of sandstone which
tends to easily separate from the formation. This well experienced problems related to sand. This
is proven by the presence of some sand produced on the surface and examination of the sand
parameters shows that the well probably contains sand with an actual flow rate of 45 BFPD.
In this thesis, the author designs a plan for the MR-14 well using gravel to overcome the problem
of sand appearing in the well. When planning the gravel pack method, use the saucier method, then
determine the screen and then determine the production rate before and after installing the gravel
pack. Next, a sand analysis was carried out which included the degree of cementation using the
Archie method, formation strength, formation clay content, and critical flow rate. The gravel pack
was then planned to overcome the sand problem, including determining the size of the gravel and
screen and the impact of the gravel on formation productivity.
Based on the calculation results, the factor for the rock cementation process (m) is 1,75 the
formation clay content (Vclay) is 35,7%, the formation strength is 5,1048 x 1012 psi2, and the actual
well production rate is 45 BFPD which has exceeded the critical flow of sand (Qz) is 36,53 BFPD.
When planning Gravel, the size of gravel that can be used is 16-30 US Mesh or 0,035 in.
Meanwhile, the size of the opening screen that will be used is 0,010 in.
Installing gravel in the MR-14 well will cause a decrease in the production rate to 33 BFPD with
a critical sand flow rate of 36,53 BFPD, so there will be no sand problems and a productivity index
(PI) of 0,1788 Bbl/D/Psi. by using a perforation density of 8 SPF.
Keywords: sand problem, gravelpack, sieve analysis.

Item Type: Thesis (Other)
Uncontrolled Keywords: sand problem, gravelpack, sieve analysis.
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 19 Jan 2024 02:22
Last Modified: 19 Jan 2024 02:22
URI: http://eprints.upnyk.ac.id/id/eprint/38732

Actions (login required)

View Item View Item