LISTIANTO, HENDRO (2023) ANALISA WELL INTEGRITY SUMUR GAS HL-03 DAN ALTERNATIF PENGGUNAAN TEKNOLOGI TIEBACK RESIN CEMENT BLEND PADA TRAJECTORY 9 5/8" DENGAN PENGARUH HPHT DAN H2S DI LAPANGAN HARADH SAUDI ARABIA. Masters thesis, UPN "Veteran" Yogyajarta.
Text
1. Cover.pdf Download (201kB) |
|
Text
2. Ringkasan dan abstract.pdf Download (344kB) |
|
Text
4. Daftar Isi-Gambar- Tabel-Lampiran.pdf Download (1MB) |
|
Text
3. Halaman Pengesahan.pdf Download (322kB) |
|
Text
5. Daftar Pustaka.pdf Download (772kB) |
|
Text
6. Pernyataan Keaslian Karya Ilmiah.pdf Download (324kB) |
|
Text
7. Tesis Akhir.pdf Restricted to Repository staff only Download (26MB) |
Abstract
vi
RINGKASAN
Pemboran pada sumur HL-03 pada lapangan Haradh menembus zona yang
memiliki tekanan dan temperatur yang tinggi. Pada sumur sebelumnya terdapat
permasalahan sustain casing pressure pada casing to casing annulus (CCA)
akibat invasi gas yang terjadi melalui annulus yang berasal dari formasi JILH,
berdasarkan analisis well integrity dari CBL-VDL Log. Hal ini membuat well
integrity menjadi buruk pada kolom semen akibat migrasi fluida dari formasi
menuju kolom semen. Untuk itu perlu adanya tindakan agar tidak terjadinya
problem akibat invasi gas pada sumur HL-03 nantinya. Salah satu teknologi yang
dapat digunakan yaitu dengan penerapan tieback resin cement blend yang
dilakukan pada trayek 9 5/8” sumur HL-03 sebagai upaya peningkatan sifat
mekanik semen pada sumur yang mengalami tekanan tinggi sepanjang umur
sumur dan mampu memastikan isolasi zona bermasalah dalam jangka panjang.
Studi ini mengusulkan penggunaan teknologi tieback cementing resin cement
blend sebagai upaya mengisolasi zona bermasalah dengan tahapan metodologi
yaitu menganalisis well integrity sumur eksisting, pemilihan resin cement,
perencanaan slurry dan operasi penyemenan pada sumur HL-03, analisis
keberhasilan hasil uji skala laboratorium penerapan teknologi resin cement blend,
dan analisis keekonomian penerapan teknologi tieback cementing dengan resin
cement blend.
Hasil studi ini menunjukkan bahwa penggunaan resin cement blend mampu secara
efektif mengisolasi zona bermasalah dengan nilai compressive strenght yang lebih
tinggi dibandingkan penyemenan konvensional yaitu mencapai 4000 psi dalam 24
jam dengan nilai compressive strenght minimum 500 psi dapat diperoleh dalam
waktu selama 12 jam. Dalam aspek keekonomian dapat dikatakan lebih ekonomis
dibandingkan menggunakan penyemenan konvensional dimana dimana estimasi
biaya yang diperlukan dalam penerapan teknologi resin cement blend yaitu
sebesar $262.883,36, sedangkan dengan metode konvensional sebesar
$1.046.351,54 meliputi penyemenan primer konvensional dan workover job untuk
perbaikan well integrity dengan interval 10 tahun dalam 20 tahun masa umur
produksi sumur. Sehingga dengan penerapan resin cement blend pada sumur HL-
03 dengan temperature tinggi efektif untuk menjaga well integrity dan ekonomis
dalam aspek keekonomian.
Kata kunci: well integrity, tieback liner cementing, resin cement blend.
vii
ABSTRACT
Drilling of the HL-03 well in the Haradh field penetrated a zone of high pressure
and temperature. In the previous well, there was a problem of sustaining casing
pressure in the casing to casing annulus (CCA) due to gas invasion that occurred
through the annulus originating from the JILH formation, based on well integrity
analysis from the CBL-VDL Log. This causes poor well integrity in the cement
column due to fluid migration from the formation to the cement column. For this
reason, action is needed to avoid problems resulting from gas invasion in the HL-
03 well in the future. One technology that can be used is the application of tieback
resin cement blend which is carried out on the 9 5/8" well HL-03 as an effort to
improve the mechanical properties of cement in wells that experience high
pressure throughout the life of the well and is able to ensure the isolation of
problem zones in the long term. .
This study proposes the use of resin cement blend tieback cementing technology
as an effort to isolate problematic zones with methodological stages, namely
analyzing the well integrity of existing wells, selecting resin cement, planning
slurry and cementing operations on the HL-03 well, analyzing the success of
laboratory scale test results applying resin cement technology. blend, and
economic analysis of applying tieback cementing technology with resin cement
blend.
The results of this study show that the use of resin cement blend is able to
effectively isolate problem zones with a higher compressive strength value
compared to conventional cement, namely reaching 4000 psi in 24 hours with a
minimum compressive strength value of 500 psi that can be obtained within 12
hours. In the economic aspect, it can be said to be more economical than using
conventional cement, where the estimated cost required to apply resin cement
blend technology is $262,883.36, while the conventional method is $1,046,351.54
including conventional primary cementing and workover jobs to improve well
integrity. with 10 year intervals within the 20 year production life of the well. So,
applying resin cement blend to the HL-03 well at high temperatures is effective in
maintaining well integrity and economical in terms of economic aspects.
Keywords: well integrity, tieback liner cementing, resin cement blend.
Item Type: | Thesis (Masters) |
---|---|
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Yuli |
Date Deposited: | 27 Oct 2023 03:15 |
Last Modified: | 27 Oct 2023 03:15 |
URI: | http://eprints.upnyk.ac.id/id/eprint/38075 |
Actions (login required)
View Item |