KAJIAN TEKNIS PRODUKTIVITAS ALAT MUAT UNTUK MEMENUHI TARGET BARGING BATUBARA DI PORT PT. BHUMI RANTAU ENERGI KALIMANTAN SELATAN

THUNDEAN, ROLAND ALIYANDRO (2023) KAJIAN TEKNIS PRODUKTIVITAS ALAT MUAT UNTUK MEMENUHI TARGET BARGING BATUBARA DI PORT PT. BHUMI RANTAU ENERGI KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyajarta.

[thumbnail of Abstrak.pdf] Text
Abstrak.pdf

Download (33kB)
[thumbnail of Cover.pdf] Text
Cover.pdf

Download (125kB)
[thumbnail of Daftar Isi.pdf] Text
Daftar Isi.pdf

Download (101kB)
[thumbnail of Daftar Pustaka.pdf] Text
Daftar Pustaka.pdf

Download (82kB)
[thumbnail of Lembar Pengesahan.pdf] Text
Lembar Pengesahan.pdf

Download (279kB)
[thumbnail of Skripsi Full.pdf] Text
Skripsi Full.pdf
Restricted to Repository staff only

Download (3MB)

Abstract

RINGKASAN
PT. Bhumi Rantau Energi (BRE), memiliki Izin Usaha Pertambangan
Operasi Produksi dan telah melakukan kerjasama dengan beberapa perusahaan
Pertambangan Batubara yang berlokasi di wilayah Kalimantan Selatan. PT. BRE
mengunakan Wheel Loader WA 600 dan juga WA 500 sebagai alat operasi
pemuatan batubara dari stockpile menuju Hopper. Permasalahan yang terjadi
adalah mengenai produktivitas kinerja Wheel Loader, yang menyebabkan target
barging tidak tercapai. Produksi alat berdasarkan Bucket Factor adalah 602.695
ton/bulan, dimana produksi alat dalam kondisi alat pada saat ini belum dapat
memenuhi target barging yaitu 640.000 ton/bulan.
Pola pemuatan feeding waktu edar yang dihaslkan adalah 21,41 detik untuk
Wheel loader WA 600 dan juga 21,07 detik untuk WA 500, dimana jika
menggunakan pola pemuatan load and carry pada Wheel loader WA 600 adalah
27,55 detik dan juga untuk WA 500 adalah 24,85 detik; faktor pengisian bucket
untuk WA 600 memiliki bucket fill factor sebesar 95,93% dan untuk WA 500
memiliki bucket fill factor sebesar 95,89 %; faktor pengembangan 0,7; efisiensi
kerja alat muat sebelum dilakukan peningkatan adalah 60,25% dan setelah
dilakukan peningkatan efisiensi kerja menjadi 64,31%.
Produksi alat muat pada kegiatan Barging memiliki target sebesar
640.000ton/bulan dengan asumsi kehilangan sebesar 0,5 % menjadi
643.200ton/bulan, sedangkan produksi saat ini berdasarkan Bucket Factor adalah
sebesar 602.695 ton/bulan, hasil perhitungan produktivitas alat menjadi
648.637ton/bulan dari sebelumnya 602.692 ton/bulan
SUMMARY
PT. Bhumi Rantau Energi (BRE), has a Production Operation Mining
Business Permit and has collaborated with several coal mining companies located
in the South Kalimantan region. PT. BRE uses the WA 600 Wheel Loader and also
the WA 500 as a means of loading coal from the stockpile to the hopper. The
problem that occurs is regarding the performance productivity of the loading
equipment, which causes the target barging not to be met. Tool production based
on the Bucket Factor is 602,695 tons/month, where production of tools in the
current state of the equipment has not been able to meet the barging target of
640,000 tons/month.
The resulting distribution time feeding loading pattern is 21.41 seconds for
the WA 600 Wheel loader and also 21.07 seconds for the WA 500, where if using
the load and carry loading pattern on the WA 600 Wheel loader it is 27.55 seconds
and also for the WA 500 is 24.85 seconds; the bucket fill factor for the WA 600 has
a bucket fill factor of 95.93% and for the WA 500 it has a bucket fill factor of
95.89%; development factor 0.7; the work efficiency of loading equipment before
the increase was 60.25% and after the increase in work efficiency became 64.31%.
The production of loading equipment in barging activities has a target of
640,000 tons/month assuming a loss of 0.5% to 643,200 tons/month, while the
current production based on the Bucket Factor is 602,695, the calculation results
for equipment productivity are 648,637 tons/month from the previous
602,692tons/month

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 02 Oct 2023 03:16
Last Modified: 02 Oct 2023 03:16
URI: http://eprints.upnyk.ac.id/id/eprint/37768

Actions (login required)

View Item View Item