EVALUASI SUCKER ROD PUMP BERDASARKAN ANALISA SONOLOG DAN DYNAGRAPH PADA SUMUR IBR-01 PT. PERTAMINA EP ASSET 2 LAPANGAN LIMAU

RAHENDRA, IDA BAGUS (2023) EVALUASI SUCKER ROD PUMP BERDASARKAN ANALISA SONOLOG DAN DYNAGRAPH PADA SUMUR IBR-01 PT. PERTAMINA EP ASSET 2 LAPANGAN LIMAU. Masters thesis, UPN "Veteran" Yogyajarta.

[thumbnail of 1. THESIS FULLTEXT_213201016_IDA BAGUS RAHENDRA.pdf] Text
1. THESIS FULLTEXT_213201016_IDA BAGUS RAHENDRA.pdf
Restricted to Repository staff only

Download (2MB)
[thumbnail of 2. COVER_213201016_IDA BAGUS RAHENDRA.pdf] Text
2. COVER_213201016_IDA BAGUS RAHENDRA.pdf

Download (78kB)
[thumbnail of 3. ABSTRAK_213201016_IDA BAGUS RAHENDRA.pdf] Text
3. ABSTRAK_213201016_IDA BAGUS RAHENDRA.pdf

Download (10kB)
[thumbnail of 4. LEMBAR PENGESAHAN_213201016_IDA BAGUS RAHENDRA.pdf] Text
4. LEMBAR PENGESAHAN_213201016_IDA BAGUS RAHENDRA.pdf

Download (254kB)
[thumbnail of 5. DAFTAR ISI_213201016_IDA BAGUS RAHENDRA.pdf] Text
5. DAFTAR ISI_213201016_IDA BAGUS RAHENDRA.pdf

Download (286kB)
[thumbnail of 6. DAFTAR PUSTAKA_213201016_IDA BAGUS RAHENDRA.pdf] Text
6. DAFTAR PUSTAKA_213201016_IDA BAGUS RAHENDRA.pdf

Download (13kB)

Abstract

vii
RINGKASAN
Sumur IBR-01 berproduksi dengan rate 27 BFPD dengan kandungan air 30%
dan laju alir produksi gas sebesar 9mmscfd, dimana hasil dari analisa dynagraph
dapat dianalisa kemungkinan terjadinya kekosongan kolom plunger sehingga laju
produksi tidak maksimal. Efisiensi volumetris pompa yang rendah dapat diketahui
dari dynagraph dan dapat dilakukan analisa dari bentuk kurva yang ditimbulkan.
Untuk melakukan perhitungan sucker rod pump ada beberapa tindakan yang harus
dilakukan yaitu dengan mengumpulkan data sumur, data produksi, data pompa, dan
data sonolog serta dynagraph. Setelah data diketahui maka selanjutnya dilakukan
evaluasi berdasarkan teori Kermit E. Brown dengan menghitung beban-beban yang
diderita polished rod dan menghitung efisiensi pompa baik itu efisiensi volumetris
maupun efisiensi total pompa. Perhitungan optimasi pompa sucker rod dilakukan
untuk mendapatkan laju produksi yang optimum pada masing-masing sumur kajian.
Ada banyak penyebab yang mengakibatkan kekosongan kolom barel yaitu
ketidaksesuaian pump setting depth terhadap dynamic fluid level dan potensi
masuknya gas ke dalam kolom plunger akibat naiknya fraksi ringan pada saat
traveling valve bergerak turun. Dengan cara merubah pump setting depth dan
memasang peralatan tambahn berupa gas anchor dapat membantu mengatasi
masalah tersebut. Evaluasi ini bertujuan untuk mengetahui besarnya efisiensi
volumetris pompa dan kemungkinan peningkatan laju produksi dengan melakukan
perencanaan ulang. Pompa dikatakan normal pada umumnya apabila besar efisiensi
volumetris pompa lebih besar atau sama dengan 70% menurut teori Kermit E.
Brown
Dengan perubahan pump setting depth dan pemasangan gas anchor
didapatkan peningkatan hasil produksi menjadi 117 bfpd dengan efisiensi
volumetris menjadi sebesar 97.5% dengan hasil kurva dynagraph yang cukup baik.
viii
ABSTRACT
The IBR-01 well produces at a rate of 27 BFPD with a water content of 30%
and a gas production flow rate of 9mmscfd, where the results of the dynagraph
analysis can be analyzed for the possibility of a plunger column vacuum so that the
production rate is not optimal. Low volumetric efficiency of the pump can be known
from the dynagraph and can be analyzed from the shape of the curve generated. To
calculate the sucker rod pump, there are several actions that must be done, namely
by collecting well data, production data, pump data, and sonolog data and
dynagraphs. After the data is known, then an evaluation is carried out based on the
theory of Kermit E. Brown by calculating the loads suffered by the polished rod
and calculating the efficiency of the pump, both volumetric efficiency and total
pump efficiency. The optimization calculation of the sucker rod pump is carried out
to obtain the optimum production rate in each study well.
There are many causes that cause barrel column vacuums, namely the
mismatch of pump setting depth to the dynamic fluid level and the potential for gas
entry into the plunger column due to the increase in light fractions when the
traveling valve moves down. By changing the pump depth setting and installing
additional equipment in the form of gas anchors can help overcome the problem.
This evaluation aims to determine the magnitude of pump volumetric efficiency
and the possibility of increasing production rates by replanning. Pumps are said to
be normal in general if the volumetric efficiency of the pump is greater than or equal
to 70% according to the theory of Kermit E. Brown
With changes in pump setting depth and installation of gas anchors, an
increase in production yield was obtained to 117 bfpd with volumetric efficiency to
97.5%.

Item Type: Thesis (Masters)
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 16 Aug 2023 02:15
Last Modified: 16 Aug 2023 02:15
URI: http://eprints.upnyk.ac.id/id/eprint/36901

Actions (login required)

View Item View Item