EVALUASI KENDALA DAN PEMILIHAN SOLUSI LEDGES BOREHOLE PADA PEMBORAN TRAYEK 12 ¼” SUMUR “AP-01” LAPANGAN “PTQ”

PUTRA, ADHITYA (2023) EVALUASI KENDALA DAN PEMILIHAN SOLUSI LEDGES BOREHOLE PADA PEMBORAN TRAYEK 12 ¼” SUMUR “AP-01” LAPANGAN “PTQ”. Other thesis, UPN "Veteran" Yogyajarta.

[thumbnail of Abstrak.pdf] Text
Abstrak.pdf

Download (337kB)
[thumbnail of Cover.pdf] Text
Cover.pdf

Download (282kB)
[thumbnail of Daftar Rujukan.pdf] Text
Daftar Rujukan.pdf

Download (351kB)
[thumbnail of LEMBAR PENGESAHAN.pdf] Text
LEMBAR PENGESAHAN.pdf

Download (1MB)
[thumbnail of Daftar isi.pdf] Text
Daftar isi.pdf

Download (274kB)
[thumbnail of Skripsi Adhitya Putra_113190166.pdf] Text
Skripsi Adhitya Putra_113190166.pdf
Restricted to Repository staff only

Download (4MB)

Abstract

vi
RINGKASAN
Oleh
Adhitya Putra
NIM: 113190166
(Program Studi Sarjana Teknik Perminyakan)
Sumur AP-01 dan AP-02 mengalami hambatan operasi pemboran pada section 12
borehole geometry yang tidak bagus atau halus karena
terbentuknya ledges pada permukaan dinding lubang bor sehingga dapat
menghambat operasi pemboran seperti kegiatan tripping out rangkaian dan
pemasangan casing. Sehingga, terjadi penambahan biaya yang cukup besar pada
operasi pemboran dari biaya yang telah direncanakan.
Metode penyelesaian yang digunakan pada penelitian ini yaitu dengan melakukan
evaluasi terhadap hasil pemboran melalui pembacaan caliper log serta
memperhitungkan selisih biaya yang dibutuhkan dalam perencanaan dengan
realisasinya. Kemudian dilakukan pemilihan alternatif solusi yang tepat dalam
mengatasi kendala pada pemboran sumur-sumur berikutnya dengan pemilihan
melalui biaya yang dibutuhkan dalam penggunaannya. Dilakukan evaluasi kembali
dari hasil pemboran yang telah menggunakan solusi alternatif yang dipilih untuk
memvalidasikan keberhasilan dari hasil pembacaan caliper log dan biaya pemboran
yang dibutuhkan.
Berdasarkan hasil penelitian yang dilakukan didapatkan penambahan biaya pada
- -
Adapun alternatif solusi yang terpilih untuk digunakan pada kegiatan pemboran
yaitu penggunaan dual cutting eccentric reamer. Selisih biaya dari hasil pemboran
-N1 dan AP-N2 didapatkan sebesar -Rp 1.521.938.756 dan -
Rp1.469.018.250 sehingga dapat dikatakan bahwa terjadi penghematan biaya pada
kedua sumur. Dengan perhitungan selisih biaya yang dibutuhkan pada keempat
sumur dan pembacaan caliper log sumur dapat disimpulkan bahwa pemboran
dengan alternatif solusi berhasil digunakan.
Kata kunci: alternatif solusi, biaya pemboran, evaluasi, ledges
vii
ABSTRACT
By
Adhitya Putra
NIM: 113190166
(Petroleum Engineering Undergraduated Program)
Wells AP-01 and AP-02 encountered drilling operation obstacles in the 12 ¼"
section due to poor or smooth borehole geometry caused by the formation of ledges
on the borehole wall surface, thereby impeding drilling operations such as tripping
out operations and casing installation. Consequently, there was a significant
increase in drilling costs compared to the planned budget.
The method employed in this research involves evaluating drilling outcomes
through caliper log readings and considering the cost differential between the
planned and actual implementation. Subsequently, the appropriate alternative
solutions are chosen to address the obstacles encountered in future well drilling,
with the selection based on the associated costs. A subsequent evaluation is
conducted on the drilling results that have utilized the selected alternative solutions
to validate the success of the caliper log readings and the required drilling costs.
Based on the conducted research, an additional cost of Rp2,563,983,618 and
Rp2,713,817,925 was incurred for wells "AP-01" and "AP-02," respectively. The
selected alternative solution for drilling activities was the use of dual cutting
eccentric reamer. The cost differentials from the drilling results of wells "AP-N1"
and "AP-N2" were -Rp1,521,938,756 and -Rp1,469,018,250, indicating cost
savings for both wells. Considering the calculated cost differences required for all
four wells and the caliper log readings, it can be concluded that drilling with the
alternative solution was successful.
Keywords: alternative solutions, drilling cost, evaluation, ledges

Item Type: Thesis (Other)
Uncontrolled Keywords: alternative solutions, drilling cost, evaluation, ledges
Subjects: T Technology > T Technology (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 27 Jun 2023 01:56
Last Modified: 27 Jun 2023 01:56
URI: http://eprints.upnyk.ac.id/id/eprint/36208

Actions (login required)

View Item View Item