ANUGRAH, ANDI NOVITA MAMA (2023) STUDI KOMPARASI 3 STAGE & 5 STAGE PADA PLUG & ABANDONMENT METODE BALANCE PLUG CEMENTING SUMUR “NOV-01” LAPANGAN “VITA. Other thesis, UPN "Veteran" Yogyajarta.
Text
Abstract_113190007_Andi Novita Mama Anugrah.pdf Download (60kB) |
|
Text
Cover_113190007_Andi Novita Mama Anugrah.pdf Download (92kB) |
|
Text
Daftar Isi_113190007_Andi Novita Mama Anugrah.pdf Download (117kB) |
|
Text
Daftar Pustaka_113190007_Andi Novita Mama Anugrah.pdf Download (135kB) |
|
Text
Lembar Pengesahan_113190007_Andi Novita Mama Anugrah.pdf Download (165kB) |
|
Text
Ringkasan_113190007_Andi Novita Mama Anugrah.pdf Download (157kB) |
|
Text
Skripsi Full Text_113190007_Andi Novita Mama Anugrah.pdf Restricted to Repository staff only Download (3MB) |
Abstract
vii
ABSTRACT
COMPARATIVE STUDI OF 3 STAGE & 5 STAGE IN PLUG &
ABANDONMENT BALANCED PLUG CEMENTING METHOD
WELL “NOV-01” FIELD “VITA”
By
Andi Novita Mama Anugrah
NIM: 113190007
(Petroleum Engineering Undergraduated Program)
NOV-01 well is a directional drilled well with a final depth of 5300 ftMD/ 4848
ftTVD. At the NOV-01 well, there was a problem with fish starting with a stuck pipe
problem which caused several BHA sequences to be left in the well. Fishing job has
been done, but to no avail. In addition, there is a land issue where to continue well
operations requires a land lease of ± 1 billion/month. After an economic evaluation
was carried out, the condition of the well which had a fairly high risk and used
leased land, made the marginal economic side of the NOV-01 well uneconomical
and it was decided to carry out P&A.
The methodology used in this research is qualitative and quantitative. In planning
plug & abandonment activities on the NOV-01 well, it is carried out by making a
work program plan such as determining the intervals for the depth of the well to be
plugged, the volume of cement slurry, the volume of additives, and the method used,
namely the rig method. The planning for plug & permanent abandonment is based
on the existing standards and regulations in Indonesia, namely SNI 13-6910-2002
and NORSOK D-010.
Based on the results of a comparative study by comparing P&A calculations and
planning, 279 sacks of cement were required for the 3 stages and 450 sacks for the
5th stage with a density of 15.8 ppg. The cement additives used were defoamer
(CAF-070), friction reducer cement (CDP-040), fluid loss control liquid (CFL-
010), bonding agent (CBA-030), and gelling agent. Completion fluids used as a
whole are NaCl, soda ash, and barite. Implementation of P&A on the NOV-01 well
uses a rig with a power rating capacity of 450 HP. For 3 stages it takes 9 days of
operation and 5 stages for 11 days of operation. The total estimated cost
comparison for P&A of the NOV-01 well is IDR 6,128,964,890.31 for 3 stages and
IDR 8,587,947,718.62 for 5 stages. In the NOV-01 well, the recommended P&A is
5 stages by considering the safety aspects of the well when abandoned.
Keywords: fish , plug & abandonment, rig method, work program
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | fish , plug & abandonment, rig method, work program |
Subjects: | T Technology > T Technology (General) |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Yuli |
Date Deposited: | 17 May 2023 06:10 |
Last Modified: | 17 May 2023 07:09 |
URI: | http://eprints.upnyk.ac.id/id/eprint/35404 |
Actions (login required)
View Item |