RCP GAS FIELD DEVELOPMENT PLAN TO FULLFILL GAS SALES AGREEMENT PLAN

Herianto, Herianto and Kristanto, Dedi and Rahmawan, Dhimas A. (2022) RCP GAS FIELD DEVELOPMENT PLAN TO FULLFILL GAS SALES AGREEMENT PLAN. Journal Techno, 8 (1). pp. 83-96. ISSN 2461-1484

[thumbnail of 6- Journal Techno Vol. 8, No. 1, May 2022_Herianto, et.al.pdf] Text
6- Journal Techno Vol. 8, No. 1, May 2022_Herianto, et.al.pdf

Download (2MB)

Abstract

The RCP field is an exploration field which is currently in the early development stage.
From the drilling of exploration wells, a gas reservoir has been found in the Basal Sand
formation. The Basal Sand Formation itself is a fairly deep formation and includes a
large reservoirhigh pressure high temperature(HPHT). This RCP field hasInitial Gas
Inplace IGIP) of 1202 Bcf. Currently there is a demand for gas supply of 50 MMSCFD
for 10 years, so it is necessary to evaluate as a supporter of the Gas Sale and Purchase
Agreement (PJBG). This research is expected to find out that the RCP field is able to
fulfill the PJBG according to the plan.
The development of the RCP Gas Field starts from the IGIP calculation, then
calculations are carried outrecovery factorto getestimate ultimate recovery(EUR),
which will then be corrected for reserves of impurities. The next stage is the field
development scheme. For field development during the PJBG contract period, it is
planned to use 3 development wells with optimization of the production rate using
chokes. Gross rate field of 67 MMSCFD (22.3 MMSCFD per well) to getgas salesof 50
MMSCFD. After planning the development of the field, the next step is to calculate the
economy. The economic calculation is calculated using the PSC scheme based on Fiscal
Termapplicable in the RCP field.
The results of the analysis of the development scheme show that the RCP field is able
to produce according to the PJBG plan with gas sales daily amount of 50 MMSCFD for
10 years. Economic calculations show positive results so that it is concluded that the
RCP Field has economic value and is feasible to be developed. From the economic
calculation, we get NPV@10 % = 96.2 MM US$; IRR = 27.1%; POTS = 2.5 years.
Keywords: gas field development, Gas Sale and Purchase Agreement, Fiscal Term,
economic analysis

Item Type: Article
Uncontrolled Keywords: gas field development, Gas Sale and Purchase Agreement, Fiscal Term, economic analysis
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Dr.Ir, MT Dedy Kristanto
Date Deposited: 31 Mar 2023 14:03
Last Modified: 31 Mar 2023 14:03
URI: http://eprints.upnyk.ac.id/id/eprint/33133

Actions (login required)

View Item View Item