Kristanto, Dedy and Rukmana, Dadang and Amperianto, Agus and Paradhita, Windyanesha (2022) Evaluation and Reactivation Strategy of Shut-In Wells Due to High Water Cut to Improve Oil Production in Bayu Field: Case Study of Bayu-N3 Well. International Journal of Oil, Gas and Coal Engineering, 10 (1). p. 31. ISSN 2376-7669
Text
6- IJOGCE January 2022_Paper_OGCE 10.11648.j.ogce.20221001.13_Kristanto, D. et.al.pdf Download (5MB) |
Abstract
Bayu-N3 was being shut-in (S/I) due to excessive water production (high water cut well) as the main cause of the
high daily production decline of the well. Therefore, an integrated analysis was conducted to identify the source of excessive
water production and handle the problem. The reactivation strategy of Bayu-N3 was well planned to solve and optimize the oil
production of the well. Based on integrated analysis of Chan’s diagnostic plot and cement evaluation log (CBL-VDL-USIT) data,
the source of excessive water production at Bayu-N3 is water channeling, caused by the free pipe condition as the result of poor
cement bonding between the casing and the formation. To handle the water channeling problem, remedial cementing was
conducted to repair the cement bonding quality. Based on the C/O log evaluation at Bayu-N3 as the reactivation well candidate,
there are six potential oil zones to be produced. The reactivation strategy was executed by perforating at interval 6544-6564
ft-MD and resulting 1602 BOPD with 0% of water cut. The economic analysis of the reactivation shows that Bayu-N3 well gives
5153 MUSD of NPV and 538% of IRR with one month and 29 days of POT. It is shows that the reactivation strategy of Bayu-N3
is technically and economically able to improve the oil production and gives good positive economic indicators. Furthermore, the
successful of reactivation strategy in Bayu-N3 well could be used as reference to be implemented for other candidate wells in
Bayu Field.
Keywords: High Water Cut, Shut-in Well, Reactivation, Potential Oil Zone
3
, Windyanesha Paradhita
1
Item Type: | Article |
---|---|
Uncontrolled Keywords: | High Water Cut, Shut-in Well, Reactivation, Potential Oil Zone |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Depositing User: | Dr.Ir, MT Dedy Kristanto |
Date Deposited: | 31 Mar 2023 14:14 |
Last Modified: | 31 Mar 2023 14:14 |
URI: | http://eprints.upnyk.ac.id/id/eprint/33099 |
Actions (login required)
View Item |