RANCANGAN TEKNIS PENAMBANGAN EMAS PADA PIT CIBITUNG DI PT CIBALIUNG SUMBERDAYA, DESA MANGKUALAM, KEC. CIMANGGU, KAB. PANDEGLANG, PROVINSI BANTEN

DIAN N, RAFLY (2023) RANCANGAN TEKNIS PENAMBANGAN EMAS PADA PIT CIBITUNG DI PT CIBALIUNG SUMBERDAYA, DESA MANGKUALAM, KEC. CIMANGGU, KAB. PANDEGLANG, PROVINSI BANTEN. Other thesis, UPN 'Veteran" Yogyakarta.

[thumbnail of 3. Cover Skripsi.pdf] Text
3. Cover Skripsi.pdf

Download (61kB)
[thumbnail of 6. DAFTAR  PUSTAKA.pdf] Text
6. DAFTAR PUSTAKA.pdf

Download (71kB)
[thumbnail of 1. Skripsi_Rafly Dian N_112160155.pdf] Text
1. Skripsi_Rafly Dian N_112160155.pdf
Restricted to Repository staff only

Download (7MB)
[thumbnail of 2. Ringkasan Abstrak.pdf] Text
2. Ringkasan Abstrak.pdf

Download (75kB)
[thumbnail of 5. DAFTAR ISI.pdf] Text
5. DAFTAR ISI.pdf

Download (12kB)
[thumbnail of 2. Ringkasan Abstrak.pdf] Text
2. Ringkasan Abstrak.pdf

Download (75kB)

Abstract

RINGKASAN
PT. Cibaliung Sumberdaya (PT. CSD) adalah sebuah anak perusahaan dari PT. Antam,
Tbk yang bergerak di bidang pertambangan emas yang berlokasi di Desa Mangkualam,
Kecamatan Cimanggu, Kabupaten Pandeglang, Banten. PT. CSD mempunyai estimasi
cadangan terbukti : 139 KWmt, kadar Au 5,64 g/t dan kadar Ag 55 g/t, dan cadangan terkira :
146 KWmt, kadar Au 2,75 kadar Ag 21 g/t pada area Izin Usaha Pertambangan Operasi
Produksi (IUP – OP) dengan nomor perizinan 82.13/KEP.1351-BPPT/2014 per - tanggal 28
Juli 2015 hingga tanggal 27 Juli 2025. Luas wilayah IUP OP yang dimiliki oleh PT. CSD
adalah 1.340 Ha.
PT. CSD telah melakukan operasi produksi dengan sistem tambang bawah tanah dengan
metode cut and fill yang dimulai pada tahun 2009 dan sudah selesai, namun berdasarkan data
produksi yang ada masih terdapat sisa cadangan bahan galian emas (Au) dan perak (Ag) di
area Blok Cibitung, oleh karena itu dalam rangka pemanfaatan secara optimal cadangan
tertambang perlu dilakukan pengambilan sisa cadangan tersebut, kondisi sisa cadangan
tersebut berada dekat dengan permukaan maka PT. CSD memiliki kesempatan untuk
melakukan pengambilan sisa cadangan, metode penambangan yang dikaji secara teknis dan
ekonomis akan dilakukan dengan menggunakan metode tambang terbuka dengan backfilling
pada akhir penambangan, Penambangan direncanakan dengan 2 shift (12 jam kerja) dalam
satu hari, umur produksi tambang adalah 10 bulan dengan rincian produksi ore 2.920 Ton
(selama enam (6) bulan) dan 15.034,30 Ton (selama empat (4) bulan)
Adapun peralatan tambang terbuka yang diterapkan oleh PT. CSD untuk produksi
emas menggunakan dua tipe alat. Pembagian tipe alat tersebut berdasarkan fungsi yaitu
sebagai peralatan utama (bongkar – muat – angkut) dan peralatan penunjang. Pembongkaran
dilakukan dengan menggunakan bulldozer yang dilengkapi dengan alat garu (ripper).
Penggalian dan pemuatan material dilakukan dengan menggunakan hydraulic excavator. Alat
angkut yang digunakan untuk mengangkut material waste dan ore adalah dump truck. Peralatan
penunjang yang digunakan adalah seperti compactor untuk pembuatan jalan; dozer untuk
perawatan dan penimbunan waste dump area; motor grader dan water truck untuk perawatan
jalan angkut serta fuel truck untuk pengisian bahan bakar.
Disposal area dirancang dengan jenis Terrace Dump Type dan memiliki parameter Angle
of Response 30o
, tinggi jenjang 5 m, dan lebar jenjang 3 m. Disposal dengan rancangan seperti
diatas pada area ini mampu menampung tanah penutup dengan volume total 7.270,64 BCM
atau 11.360,37 LCM. Timbunan dimulai dari elevasi 124 - 129 mdpl.
ABSTRACT
PT. Cibaliung Sumberdaya is a subsidiary of PT. Antam, Tbk which engaged in gold
mining located at Mangkualam Village, Cimanggu District, Pandeglang Regency, Banten. PT.
CSD has proven reserves: 139 KWmt, with Au grade 5.64g/t and Ag grade 55 g/t, and
estimated reserves : 146 KWmt, with Au grade 2.75 and Ag grade 21 g/t in the Production
Operation Mining Business License area (IUP – OP) with license number 82.13/KEP.1351-
BPPT/2014 as of 28 July 2015 to 27 July 2025. The area of IUP OP owned by PT. CSD is
1,340 Ha.
PT. CSD had carried out production operations with an underground mining system
using the cut and fill method which began in 2009 and had been completed, but based on
existing production data, there are still gold (Au) and silver (Ag) ore reserves in the Cibitung
Block area, Therefore, in order to optimize the utilization of mineable reserves it is necessary
to take the remaining reserves, the condition of the remaining reserves is close to the surface.
So PT. CSD has the opportunity to take the remaining reserves, the mining method that studied
technically and economically will use the open pit mining method with backfilling at the end
of mining, Mining is planned with 2 shifts (12 working hours) in a day, the life of mine
production is 10 months with details of ore production of 2,920 tons (for six (6) months) and
15,034.30 tons (for four (4) months)
The open-pit mining equipment that applied by PT. CSD for gold production uses two
types of heavy equipments. The classification of these types of heavy equipments is based on
their function, as the main equipment (Unloading - loading - hauling) and supporting
equipment. Unloading is operated using a bulldozer equipped with a ripper, excavation and
loading of material is carried out using a hydraulic excavator. Hauling equipment that used to
transport waste and ore materials is a dump truck. The supporting equipment used is a
compactor for road construction; dozers for maintenance and stockpiling of waste dump areas;
motor graders and water trucks for haul road maintenance and fuel trucks for refueling.
The disposal area is designed with a Terrace Dump Type and has an angle of response
parameter of 30o
, bench height 5 m, and bench width 3 m. This disposal area is able to
accommodate overburden with a total volume of 7,270.64 BCM or 11,360.37 LCM. The
disposal starts at an elevation of 124 - 129 masl.

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 26 Jan 2023 07:03
Last Modified: 26 Jan 2023 07:03
URI: http://eprints.upnyk.ac.id/id/eprint/32525

Actions (login required)

View Item View Item