RANTEALLO, GABRIEL (2022) RANCANGAN SISTEM PENYALIRAN PADA TAMBANG BIJIH NIKEL DI WOLO, KABUPATEN KOLAKA, PROVINSI SULAWESI TENGGARA. Other thesis, UPN 'Veteran" Yogyakarta.
Text
1 Draft Skripsi Gabriel Ranteallo 112170059.pdf Restricted to Repository staff only Download (9MB) |
|
Text
2 Abstrak.pdf Download (17kB) |
|
Text
4 Lembar Pengesahan.pdf Download (173kB) |
|
Text
5 Daftar Isi.pdf Download (32kB) |
|
Text
6 Daftar Pustaka.pdf Download (158kB) |
|
Text
3 Cover.pdf Download (65kB) |
Abstract
v
RINGKASAN
Penelitian dilaksanakan di Blok Samaendre PT. Ceria Nugraha Indotama yang
terletak di Kecamatan Wolo, Kabupatem Kolaka, Provinsi Sulawesi Tenggara.
Metode penambangan menggunakan sistem tambang terbuka dengan metode open
cast yang memiliki Wilayah Izin Usaha Penambangan (WIUP) seluas 67.85 km2
atau 6.785 Ha. Sumber air tambang berasal dari air hujan yang mengalir ke jalan
tambang serta masuk ke dalam bukaan tambang. Blok Samendre masih melakukan
kegiatan penambangan dan akan membuka pit baru yaitu Pit HPAL, sehingga
dibutuhkan rancangan sistem penyaliran tambang.
Perhitungan curah hujan rencana yang digunakan dalam penelitian ini
menggunakan stokastik atau prediksi dengan metode Thomas-Fiering yang
bilangan acaknya yang telah dimodifikasi oleh Kirby menggunakan transformasi
Wilson-Hilferty selama 10 tahun dimulai dari tahun 2021-2030. Hasil prediksi
menghasilkan curah hujan rencana sebesar 109,61 mm/hari dan waktu konsentrasi
hujan sebesar 2,37 jam, maka nilai intensitas hujan adalah 21,36 mm/jam.
Lokasi penelitian memiliki 6 daerah tangkapan hujan seluas 2,13 km2 yaitu
DTH 1 = 1,20 km2
, DTH 2 = 0,13 km2
, DTH 3 = 0,38 km2
, DTH 4 = 0,05 km2
,
DTH 5 = 0,04 km2
, DTH 6 =0,33 km2 dan total debit air limpasan sebesar 7,83
m3
/detik. Terdapat 7 saluran terbuka yang berada di 2 dalam pit yang akan
mengalirkan air limpasan menuju ke safety pond, 1 saluran terbuka di stockpile
limonite, dan 4 diluar pit. Saluran tersebut akan mengalirkan air limpasan menuju
ke kolam pengendapan.
Untuk mencegah terjadinya luapan air dikolam pengendapan, maka dibuat 2
safety pond yang berfungsi mengendapkan sementara air limpasan dari DTH 2 dan
DTH 3 menuju ke kolam pengendapan. Debit air limpasan yang masuk ke dalam
kolam pengendapan sebesar 7,83 m3
/detik dengan volume tampungan kolam
pengendapan sebesar 67.790,09 m3 dan luas 16.524 m2
. Pengerukan endapan
lumpur safety pond 1 dilakukan selama 37 hari sekali, safety pond 2 dilakukan
selama 41 hari sekali dan kolam pengendapan dilakukan selama 20 hari sekali.
Pengerukan kolam pengendapan menggunkan alat gali long arm excavator Kobelco
Sk 210 Lc.
vi
SUMMARY
The research was conducted in Samaendre Block PT. Ceria Nugraha
Indotama is located in Wolo District, Kolaka Regency, Southeast Sulawesi
Province. The mining method uses an open-pit mining system with the open cast
method which has a Mining Business License Area (WIUP) covering an area of
67.85 km2 or 6.785 Ha. The source of mine water comes from rainwater that flows
into the mine road and enters the mine opening. The Samendre Block is still perform
mining activities and will open a new pit that is HPAL Pit, so a mine drainage
system design is needed.
The calculation of the planned rainfall used in this study uses stochastic or
predictions using the Thomas-Fiering method which random numbers have been
modified by Kirby using the Wilson-Hilferty transformation for 10 years starting
from 2021-2030. The prediction produce a planned rainfall of 109.61 mm/day and
the time of rain concentration of 2,37 hours, then the value of the rainfall intensity
is 21,36 mm/hour.
The research location has 6 catchment areas that covering 2,13 km2
, that is
DTH 1 = 1,20 km2
, DTH 2 = 0,13 km2
, DTH 3 = 0,38 km2
, DTH 4 = 0,05 km2
, DTH
5 = 0,04 km2
, DTH 6 =0,33 km2 and the total runoff is 7,83 m3
/second. There are 7
open channels located in 2 in the pit that will drain runoff water to the safety pond,
1 open channel in the limonite stockpile, and 4 outside the pit. The open channel
will drain the runoff water to the settling pond.
In order to prevent overflow of water in the settling pond, 2 safety ponds were
made which function to temporarily precipitate runoff water from DTH 2 and DTH
3 to the settling pond. The runoff water discharge into the settling pond is 7,83
m3/second with a sedimentation pond storage volume of 67.790,09 m3 and an area
of 16.524 m2
. The dredging sludge of the safety pond 1 is carried out once every 37
days, the safety pond 2 is carried out once every 41 days and the settling pond is
carried out every 20 days. Dredging of the settling pond using a long arm excavator
Kobelco Sk 210 Lc.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | penambangan menggunakan sistem tambang terbuka dengan metode open cast yang memiliki Wilayah Izin Usaha Penambangan (WIUP) seluas 67.85 km2 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Depositing User: | Eko Yuli |
Date Deposited: | 28 Jul 2022 03:54 |
Last Modified: | 28 Jul 2022 03:54 |
URI: | http://eprints.upnyk.ac.id/id/eprint/30476 |
Actions (login required)
View Item |