KAJIAN TEKNIS ALAT PEREMUK UNTUK OPTIMALISASI PRODUKSI PADA UNIT PENGOLAHAN ANDESIT PD ALAM JAYA, KECAMATAN BALEENDAH, KABUPATEN BANDUNG, JAWA BARAT

DEWI, KOMANG AYU RATIH KUMALA (2022) KAJIAN TEKNIS ALAT PEREMUK UNTUK OPTIMALISASI PRODUKSI PADA UNIT PENGOLAHAN ANDESIT PD ALAM JAYA, KECAMATAN BALEENDAH, KABUPATEN BANDUNG, JAWA BARAT. Other thesis, UPN 'Veteran" Yogyakarta.

[thumbnail of DAFTAR BACAAN_KOMANG AYU RATIH K. D._112170079.pdf]
Preview
Text
DAFTAR BACAAN_KOMANG AYU RATIH K. D._112170079.pdf

Download (69kB) | Preview
[thumbnail of DAFTAR ISI_KOMANG AYU RATIH K. D._112170079.pdf]
Preview
Text
DAFTAR ISI_KOMANG AYU RATIH K. D._112170079.pdf

Download (118kB) | Preview
[thumbnail of HALAMAN PENGESAHAN_KOMANG AYU RATIH K. D._112170079.pdf]
Preview
Text
HALAMAN PENGESAHAN_KOMANG AYU RATIH K. D._112170079.pdf

Download (123kB) | Preview
[thumbnail of RINGKASAN_KOMANG AYU RATIH K. D._112170079.pdf]
Preview
Text
RINGKASAN_KOMANG AYU RATIH K. D._112170079.pdf

Download (121kB) | Preview
[thumbnail of DRAFT SKRIPSI_KOMANG AYU RATIH K. D._112170079.pdf] Text
DRAFT SKRIPSI_KOMANG AYU RATIH K. D._112170079.pdf
Restricted to Repository staff only

Download (4MB)
[thumbnail of COVER_KOMANG AYU RATIH K. D._112170079.pdf]
Preview
Text
COVER_KOMANG AYU RATIH K. D._112170079.pdf

Download (113kB) | Preview

Abstract

v
RINGKASAN
PD Alam Jaya merupakan perusahaan nasional yang bergerak di bidang
pertambangan andesit, dengan lokasi penambangan dan peremukan andesit yang
terletak di Kelurahan Andir, Kecamatan Baleendah, Kabupaten Bandung, Jawa
Barat. Penelitian ini bertujuan untuk mengkaji unit peremuk secara teknis untuk
mencari permasalahan pada target produksi, baik dari segi kuantitas maupun
distribusinya serta faktor yang menyebabkan tidak tercapainya target tersebut.
Produksi aktual saat ini adalah sebesar 271,53 ton/hari, dengan target
produksi sebesar 262,5 ton/hari. Terdapat tiga produk yang dihasilkan, yaitu produk
-20+10 mm sebesar 18,51 ton/jam atau 44,52%, produk -10+5 mm sebesar
12,49 ton/jam atau 30,04%, serta produk -5 mm sebesar 10,58 ton/jam atau 25,44%.
Target distribusi produk -20+10 mm adalah sebesar ≥45% atau ≥18,71 ton/jam,
produk -10+5 mm sebesar ≤25% atau ≤10,40 ton/jam, dan produk -5 mm sebesar
≥30% atau ≥12,47 ton/jam. Distribusi setiap ukuran material diketahui dengan
melakukan perhitungan serta analisis data hasil program split desktop 4.0.
Berdasarkan data tersebut, dapat diketahui bahwa target produksi dari segi
kuantitas telah tercapai, sedangkan target distribusi dari ketiga produk belum
tercapai, sehingga diperlukan kajian teknis untuk mencari faktor penyebab serta
perbaikan yang sesuai untuk mengatasi permasalahan tersebut.
Perbaikan dilakukan secara teoritis dengan menggunakan tabel distribusi
produk pada alat peremuk untuk berbagai ukuran closed setting. Perbaikan yang
disarankan yaitu perubahan closed setting pada Jaw Crusher II dari yang semula
55 mm menjadi 45 mm agar produk ukuran -20+10 mm dan -5 mm meningkat, serta
produk ukuran -10+5 mm berkurang.
Setelah dilakukan perbaikan, didapatkan produksi dengan rincian produk
ukuran -20+10 mm sebesar 18,77 ton/jam atau 45,15%, produk ukuran -10+5 mm
sebesar 10,29 ton/jam atau 24,74%, dan produk ukuran -5 mm sebesar
12,52 ton/jam atau 30,11%, dengan demikian ketiga produk telah sesuai dengan
target distribusi yang ditetapkan.
vi
SUMMARY
PD Alam Jaya is a national company engaged in the andesite mining
business, which the mining and crushing process located in Andir Village,
Baleendah District, Bandung Regency, West Java. This study aims to examine the
crusher unit technically to find the problem that occur in production target, whether
it’s the quantity or the distribution, and also the factors that causes the said target
unachieved.
The actual production is 271,53 tons/day, with the target production is
262,5 tons/day. There are three materials produced, which is product -20+10 mm
with 18,51 ton/hour or 44,52%, product -10+5 mm with 12,49 ton/hour or 30,04%,
and product -5 mm with 10,58 ton/hour or 25,44%. The distribution target for each
product is product size -20+10 mm with the production target of ≥45% or
≥18,71 tons/hour, product size -10+5 mm with the production target of ≤25% or
≤10,40 ton/hour, product size -5 mm with the production target of ≥30% or
≥12,47 ton/hour. The distribution from each material size is known by calculating
and analyzing the data achieved from split desktop 4.0 software.
Based on these data, it can be seen that the production target quantity has
been achieved, while the size distribution target has not been achieved, thus
technical study is needed to find the causative factor and the proper improvement
required to solve the problem.
The improvement is done theoretically by using product distribution table
for crusher with various closed setting sizes. The improvement that was made is the
change of Jaw Crusher II closed setting from originally 55 mm to 45 mm so that
the product -20+10 mm and -5 mm increase, and the product -10+5 mm decrease.
After the improvement, the product size distribution target was achieved,
with the details are product size -20+10 mm with 18,77 tons/hour or 45,15%,
product size -10+5 mm is 10,29 tons/hour or 24,74%, and product size -5 mm with
12,52 tons/hour or 30,11%. By this, all of the three products have achieved the
expected distribution target.

Item Type: Thesis (Other)
Uncontrolled Keywords: pertambangan andesit, dengan lokasi penambangan dan peremukan andesit yang terletak di Kelurahan Andir
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 29 Mar 2022 04:42
Last Modified: 16 Sep 2022 06:44
URI: http://eprints.upnyk.ac.id/id/eprint/29267

Actions (login required)

View Item View Item