RANCANGAN TEKNIS SISTEM PENYALIRAN TAMBANG PADA KUARI ANDESIT DI PT. NUSA PATRIA, DESA DADIREJO, KECAMATAN BAGELEN, KABUPATEN PURWOREJO, PROVINSI JAWA TENGAH

MULYADI, DODI (2022) RANCANGAN TEKNIS SISTEM PENYALIRAN TAMBANG PADA KUARI ANDESIT DI PT. NUSA PATRIA, DESA DADIREJO, KECAMATAN BAGELEN, KABUPATEN PURWOREJO, PROVINSI JAWA TENGAH. Other thesis, UPN 'Veteran" Yogyakarta.

[thumbnail of Daftar Pustaka.pdf]
Preview
Text
Daftar Pustaka.pdf

Download (126kB) | Preview
[thumbnail of Halaman Judul atau Cover.pdf]
Preview
Text
Halaman Judul atau Cover.pdf

Download (217kB) | Preview
[thumbnail of Lembar Pengesahan.pdf]
Preview
Text
Lembar Pengesahan.pdf

Download (125kB) | Preview
[thumbnail of Skripsi_Dodi Mulyadi_112170023.pdf] Text
Skripsi_Dodi Mulyadi_112170023.pdf
Restricted to Repository staff only

Download (14MB)
[thumbnail of Abstrak.pdf]
Preview
Text
Abstrak.pdf

Download (14kB) | Preview
[thumbnail of Daftar Isi.pdf]
Preview
Text
Daftar Isi.pdf

Download (139kB) | Preview

Abstract

ABSTRAK
PT. Nusa Patria merupakan perusahaan yang bergerak di bidang
pertambangan batu andesit dan terletak di Desa Dadirejo, Kecamatan Bagelen,
Kabupaten Purworejo, Provinsi Jawa Tengah. Sistem penambangan yang
diterapkan adalah sistem tambang terbuka dengan metode Quarry Side Hill.
Kemajuan tambang yang berjalan setiap tahun akan merubah kondisi topografi
daerah penelitian. PT. Nusa Patria saat ini belum berjalannya proses operasi
produksi diperlukan dan belum adanya rancangan sistem penyaliran tambang
maka diperlukan adanya rancangan sistem penyaliran tambang yang memadai
agar tidak mengganggu aktivitas penambangan. Berdasarkan analisis data curah
hujan tahun 2011-2020 diperoleh curah hujan rencana sebesar 97 mm/hari dengan
intensitas curah hujan sebesar 23,71 mm/jam.
Saluran terbuka yang dibuat bertujuan untuk mengalirkan air hujan dan air
limpasan ke luar dari area penambangan menuju sungai. Bentuk saluran terbuka
berbentuk trapesium. Rancangan saluran terbuka pada bukaan tambang memiliki
dimensi lebar atas permukaan basah (B) = 1,10 m, lebar atas saluran terbuka (L) =
1,21 m, lebar dasar saluran (b) = 0,55 m, kedalaman saluran (h) = 0,58 m dan
panjang dinding saluran (a) = 0,66 m. Rancangan saluran terbuka di luar bukaan
tambang memiliki dimensi lebar atas permukaan basah (B) = 0,54 m, lebar atas
saluran terbuka (L) = 0,60 m, lebar dasar saluran (b) = 0,27 m, kedalaman saluran
(h) = 0,29 m dan panjang dinding saluran (a) = 0,33 m. Rancangan saluran
terbuka pada area timbunan dan menuju kolam pengendapan memiliki dimensi
lebar atas permukaan basah (B) = 1,33 m, lebar atas saluran terbuka (L) = 1,47 m,
lebar dasar saluran (b) = 0,67 m, kedalaman saluran (h) = 0,70 m dan panjang
dinding saluran (a) = 0,80 m. Sedangkan gorong-gorong dibuat dengan diameter
0,45 m sebagai tempat mengalirkan air dibawah permukaan tanah yang melewati
jalan tambang.
Kolam pengendapan dibuat berbentuk empat persegi panjang yang
berfungsi sebagai tempat penampungan air tambang dan mengendapkan padatan
sebelum dibuang ke sungai. Rancangan kolam pengendapan dibuat dengan dua
kompartemen, panjang total kolam = 12 m dan lebar kolam = 8 m yang
menampung volume total sebesar 214,50 m3
. Waktu pengerukan kolam
pengendapan dilakukan setiap 12 bulan atau satu tahun.
Kata kunci: Rancangan Sistem Penyaliran, Saluran Terbuka, Gorong-gorong,
Kolam Pengendapan.
ABSTRACT
PT Nusa Patria is a company engaged in Andesite stone mining located in
Dadirejo Village, Bagelen District, Purworejo Regency, Central Java Province.
The mining system applied is an open-pit mining system using the Quarry Side
Hill method. Mining progress that runs every year will change the topography of
the research area. PT Nusa Patria is currently not running the required
production operation process of a mine drainage system design is necessary to
have a suitable mine drainage system design but interfere with mining activities.
Based on the analysis of rainfall data in 2011-2020, the planned rainfall is 97
mm/day with a rainfall intensity of 23.71 mm/hour.
The aim to made an open channel is to drain rainwater and runoff water
from the mining area to the river. The Open channel shape is trapezoidal. The
design of the open-channel at the mine opening has the dimensions of the top
width of the wet surface (B) = 1.10 m, the upper width of the open-channel (L) =
1.21 m, the width of the channel bottom (b) = 0.55 m, the channel depth (h) =
0.58 m and the length of the channel wall (a) = 0.66 m. The design of the open
channel outside the mine opening has the dimensions of the top width of the wet
surface (B) = 0.54 m, the upper width of the open-channel (L) = 0.60 m, the width
of the channel bottom (b) = 0.27 m, the channel depth (h) = 0.29 m and the length
of the channel wall (a) = 0.33 m. The design of the open channel in the
embankment area and leading to the settling pond has the dimensions of the top
width of the wet surface (B) = 1.33 m, the upper width of the open channel (L) =
1.47 m, the channel width of the bottom (b) = 0.67 m, channel depth (h) = 0.70 m
and channel wall length (a) = 0.80 m. Culvert makes with a diameter of 0.45 m
and place to drain water below the ground surface that passes through the mine
road.
Shapes of settling pond are rectangular functions as a reservoir for mine
water and settle of solids before being discharged into the river. The settling pond
design with two compartments, the total length of the pond = 12 m and the width
of the pond = 8 m which accommodates a total volume of 214.50 m3. The time of
dredging the settling pond do every 12 months or one year.
Keyword: Mine Drainage System Design, Open Channel, Culvert, Settling Pond.

Item Type: Thesis (Other)
Uncontrolled Keywords: Rancangan Sistem Penyaliran, Saluran Terbuka, Gorong-gorong, Kolam Pengendapan.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 18 Mar 2022 03:45
Last Modified: 22 Jun 2022 08:46
URI: http://eprints.upnyk.ac.id/id/eprint/29077

Actions (login required)

View Item View Item