Raharjo, Muhammad Ihsan (2012) KAJIAN TEKNIS ALAT MUAT DAN ALAT ANGKUT DALAM RANGKA PENGUPASAN LAPISAN TANAH PENUTUP DI AREA SWAKELOLA 1( PAKET 08-103 )TAMBANG AIR LAYA PT.BUKIT ASAM (Persero) Tbk TANJUNG.ENIM SUMATERA SELATAN. Other thesis, UPN "Veteran" Yogyakarta.
|
Text
Cover.pdf Download (7kB) | Preview |
Abstract
PT. Bukit Asam (Persero), Tbk merupakan salah satu Badan Usaha Milik Negara (BUMN) yang bergerak di bidang pertambangan batubara. Salah satu unit penambangan yaitu Unit Pertambangan Tanjung Enim (UPTE) yang berlokasi di Tanjung Enim, Sumatera Selatan. Dalam kegiatan penambangan selain melibatkan pihak ketiga, PT. Bukit Asam menerapkan penambangan secara Swakelola pada area penambangan yang dikelola langsung oleh PTBA namun alat yang digunakan masih menyewa dari pihak ketiga diantaranya CV. Musirawas, PT. Bangun karya lestari (BKPL). Salah satu kegiatan utama yang dilakukan dalam kegiatan penambangan ini khususnya Swakelola 1 adalah pengupasan lapisan tanah penutup (OB), penggalian batubara dan pengangkutan. Tujuan dilakukan ini untuk loading point ke wester dump dengan sasaran produksi tahun 2011 pada pengupasan lapisan tanah penutup adalah sebesar 2.100.000 BCM dengan rata-rata perbulan yang harus dibongkar sebesar 175.000 BCM/bulan Kegiatan pengupasan lapisan tanah penutup diarea Swakelola 1 dengan menggunakan alat bongkar menggunakan Bulldozer D8R 3 unit, Bulldozer D65P 1 unit, alat muat menggunakan Backhoe PC400 sebanyak 2 unit,Backhoe PC 300 sebanyak 2 unit, alat angkut menggunaka Nissan CWB 45A sebanyak 26 unit Dump Truck Berdasarkan pengamatan dilapangan permasalahan yang terjadi saat ini adalah jumlah unit alat angkut yang bekerja di lapangan hanya 18 unit yang artinya tidak sesuai dengan kontrak yang tersedia dikarenakan kurangnya operator pada alat angkut yang ada sehingga mengganggu realisasi target produksi yang direncanakan pada tahun 2011 sebesar 2.100.000 BCM atau rata-rata perbulan sebesar 175.000 BCM Upaya yang dilakukan untuk mencapai target produksi yang diinginkan adalah dengan meningkatkan jumlah unit alat angkut yang bekerja dari 18 unit menjadi 20 unit sehingga bisa mencapai target produksi yang direncanakan hingga akhir tahun 2011 sebesar 2.100.000 BCM atau rata-rata perbulan sebesar 175.000 BCM PT. Bukit Asam (Persero), Tbk is one of the State-Owned Enterprises, which is engaged in coal mining. One of the mining unit Tanjung Enim Mining Unit (UPTE) located in Tanjung Enim, South Sumatra. In addition to mining activities involving third parties, PT. Bukit Asam implement self-managed mining in mining areas directly managed by PTBA but still a tool used by third parties such as rental CV. Musirawas, PT. Build sustainable works (BKPL). One of the main activities carried out in this particular self-managed mining operations 1 is stripping overburden (OB), coal excavation and hauling. The purpose is for the loading point to the wester dump with production targeted in 2011 in stripping overburden amounts to 2.100.000 million BCM with a monthly average of 175.000 BCM should be dismantled / month Overburden stripping activity self-management in area 1 using the loading tool uses 3 units D8R Bulldozer, Bulldozer D65P 1 unit load devices using 2 units PC400 Backhoe, Backhoe PC 300 2 units make use of Nissan CWB conveyance by 26 units 45A Dump Truck Based on field observations of the current problems is the number of transportation units operating in the field only 18 units which is not in accordance with the contract due to a lack of available operators in the conveyance that is so disturbing realization of the planned production targets in 2011 amounted to 2.100.000 million BCM or a monthly average of 175,000 BCM Efforts are made to achieve the desired production target is to increase the number of transportation units that work from 18 units to 20 units so as to achieve the planned production target by the end of 2011 amounted to 2.100.000 million BCM or a monthly average of 175,000 BCM
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 02 Jun 2016 06:16 |
Last Modified: | 02 Jun 2016 06:16 |
URI: | http://eprints.upnyk.ac.id/id/eprint/2888 |
Actions (login required)
View Item |