Kegiatan penambangan batubara PT. Bukit Asam (Persero)Tbk di lokasi
Tambang Air Laya(TAL) menggunakan sistem continous mining (penambangan
menerus) dengan alat tambang utamanya Bucket Wheel Excavator (BWE).
Pembongkaran batubara dilakukan dengan pengeboran dan peledakan.
Sasaran produksi BWE di lokasi TAL adalah 119.405 ton pada bulan Juli
atau 5.427,50 ton/hari, akan tetapi pada kenyataannya hanya dapat memenuhi
produksi sebesar 105.742 ton atau 4.806,45 ton/hari, sehingga sasaran produksi
belum tercapai. Produksi BWE bergantung dari jumlah volume yang terbongkar
oleh kegiatan peledakan. Jumlah sasaran produksi BWE yang belum tercapai
dikarenakan produksi peledakan yang kurang serta persentase bongkah berukuran
≥ 80 cm yang dihasilkan masih diatas 10 % sehingga kinerja BWE terganggu,
maka perlu dilakukan evaluasi terhadap kegiatan pengeboran dan peledakan.
Geometri peledakan saat ini adalah burden 4 m, spasi 8 m, stemming 3 m,
kedalaman lubang ledak 5 m, kolom isian 2 m, tinggi jenjang 6 m, jumlah lubang
ledak rata – rata yang dihasilkan adalah 21 lubang serta powder factor yang
didapat adalah 0,14 kg/m3. Persentase bongkah yang berukuran ≥ 80 cm yang
dihasilkan dari geometri saat ini adalah 13,25 % (riil) dan 13,9 % (metode
Kuznetsov).
Berdasarkan hasil kajian menggunakan rumusan R.L. Ash didapatkan nilai
geometri yang sama pada burden dan spasi kecuali pada stemming menjadi 2,8 m
dan kolom isian menjadi 2,2 m serta jumlah lubang ledak minimal yang harus
dibuat untuk memenuhi sasaran produksi sebanyak 27 lubang. Penggunaan
geometri usulan tersebut, diperoleh nilai powder factor adalah 0,15 kg/m3, dan
produksi yang dihasilkan adalah 5.616 ton/hari sehingga sasaran produksi yang
diinginkan dapat tercapai. Fragmentasi bongkah batuan yang berukuran ≥ 80 cm
yang dihasilkan dari powder factor tersebut adalah 9,20 %(metode Kuznetsov),
dengan demikian sesuai yang diharapkan jumlah bongkah < 10 %.
Coal mining activities of PT. Bukit Asam (Persero)Tbk at the location of
Tambang Air Laya (TAL) using continuous mining system with its main mining
equipment Bucket Wheel Excavators (BWE). Unloading of coal is done by
drilling and blasting.
BWE production targets in the TAL site is 119.405 tonnes in July or
5.427,50 tons / day, but in fact only able to meet a production of 105.742 tons,
4.806,45 tons / day, so that production targets were not reached. BWE production
depends on the amount of volume uncovered by blasting activities. BWE
production target amount has not been achieved due to the detonation of less
production and the percentage of boulder size ≥ 80 cm is produced is still above
10% which can BWE performance is compromised, it is necessary to evaluate the
drilling and blasting activities.
Geometry blasting now is burden 4 m, 8 m spacing, stemming 3 m, hole
depth 5 m, charge length 2 m, high levels of 6 m, average number of holes
explode is 21 holes and the powder factor obtained is 0,14 kg/m3. Percentage of
boulder size ≥ 80 cm resulting from the current geometry is 13,25% (real) and
13,9% (Kuznetsov method).
Based on the results of studies using the formula R.L. Ash obtained the
same geometry on the burden and spacing except at stemming to 2,8 m and charge
length 2,2 m and a minimum number of holes that must be made to meet the
production target of 27 holes. Using geometry of the proposal, obtained by the
powder factor is 0,15 kg/m3, and the resulting production is 5.616 tons / day so
that the desired production target can be achieved. Fragmentation-sized of rock ≥
80 cm resulting from the powder factor is 9,20% (Kuznetsov method), thus
according to the expected number of boulder < 10%.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 02 Jun 2016 04:02 |
Last Modified: | 02 Jun 2016 04:02 |
URI: | http://eprints.upnyk.ac.id/id/eprint/2863 |
Actions (login required)
![]() |
View Item |