KAJIAN TEKNIS GEOMETRI PELEDAKAN BATUBARA DALAM UPAYA MEMENUHI SASARAN PRODUKSI DI TAMBANG AIR LAYA PT. BUKIT ASAM (PERSERO)Tbk TANJUNG ENIM SUMATERA SELATAN

RATIANTO, HARRY (2012) KAJIAN TEKNIS GEOMETRI PELEDAKAN BATUBARA DALAM UPAYA MEMENUHI SASARAN PRODUKSI DI TAMBANG AIR LAYA PT. BUKIT ASAM (PERSERO)Tbk TANJUNG ENIM SUMATERA SELATAN. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
ABSTRACT.pdf

Download (81kB) | Preview

Abstract

Kegiatan penambangan batubara PT. Bukit Asam (Persero)Tbk di lokasi Tambang Air Laya(TAL) menggunakan sistem continous mining (penambangan menerus) dengan alat tambang utamanya Bucket Wheel Excavator (BWE). Pembongkaran batubara dilakukan dengan pengeboran dan peledakan. Sasaran produksi BWE di lokasi TAL adalah 119.405 ton pada bulan Juli atau 5.427,50 ton/hari, akan tetapi pada kenyataannya hanya dapat memenuhi produksi sebesar 105.742 ton atau 4.806,45 ton/hari, sehingga sasaran produksi belum tercapai. Produksi BWE bergantung dari jumlah volume yang terbongkar oleh kegiatan peledakan. Jumlah sasaran produksi BWE yang belum tercapai dikarenakan produksi peledakan yang kurang serta persentase bongkah berukuran ≥ 80 cm yang dihasilkan masih diatas 10 % sehingga kinerja BWE terganggu, maka perlu dilakukan evaluasi terhadap kegiatan pengeboran dan peledakan. Geometri peledakan saat ini adalah burden 4 m, spasi 8 m, stemming 3 m, kedalaman lubang ledak 5 m, kolom isian 2 m, tinggi jenjang 6 m, jumlah lubang ledak rata – rata yang dihasilkan adalah 21 lubang serta powder factor yang didapat adalah 0,14 kg/m3. Persentase bongkah yang berukuran ≥ 80 cm yang dihasilkan dari geometri saat ini adalah 13,25 % (riil) dan 13,9 % (metode Kuznetsov). Berdasarkan hasil kajian menggunakan rumusan R.L. Ash didapatkan nilai geometri yang sama pada burden dan spasi kecuali pada stemming menjadi 2,8 m dan kolom isian menjadi 2,2 m serta jumlah lubang ledak minimal yang harus dibuat untuk memenuhi sasaran produksi sebanyak 27 lubang. Penggunaan geometri usulan tersebut, diperoleh nilai powder factor adalah 0,15 kg/m3, dan produksi yang dihasilkan adalah 5.616 ton/hari sehingga sasaran produksi yang diinginkan dapat tercapai. Fragmentasi bongkah batuan yang berukuran ≥ 80 cm yang dihasilkan dari powder factor tersebut adalah 9,20 %(metode Kuznetsov), dengan demikian sesuai yang diharapkan jumlah bongkah < 10 %. Coal mining activities of PT. Bukit Asam (Persero)Tbk at the location of Tambang Air Laya (TAL) using continuous mining system with its main mining equipment Bucket Wheel Excavators (BWE). Unloading of coal is done by drilling and blasting. BWE production targets in the TAL site is 119.405 tonnes in July or 5.427,50 tons / day, but in fact only able to meet a production of 105.742 tons, 4.806,45 tons / day, so that production targets were not reached. BWE production depends on the amount of volume uncovered by blasting activities. BWE production target amount has not been achieved due to the detonation of less production and the percentage of boulder size ≥ 80 cm is produced is still above 10% which can BWE performance is compromised, it is necessary to evaluate the drilling and blasting activities. Geometry blasting now is burden 4 m, 8 m spacing, stemming 3 m, hole depth 5 m, charge length 2 m, high levels of 6 m, average number of holes explode is 21 holes and the powder factor obtained is 0,14 kg/m3. Percentage of boulder size ≥ 80 cm resulting from the current geometry is 13,25% (real) and 13,9% (Kuznetsov method). Based on the results of studies using the formula R.L. Ash obtained the same geometry on the burden and spacing except at stemming to 2,8 m and charge length 2,2 m and a minimum number of holes that must be made to meet the production target of 27 holes. Using geometry of the proposal, obtained by the powder factor is 0,15 kg/m3, and the resulting production is 5.616 tons / day so that the desired production target can be achieved. Fragmentation-sized of rock ≥ 80 cm resulting from the powder factor is 9,20% (Kuznetsov method), thus according to the expected number of boulder < 10%.

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 02 Jun 2016 04:02
Last Modified: 02 Jun 2016 04:02
URI: http://eprints.upnyk.ac.id/id/eprint/2863

Actions (login required)

View Item View Item