Kajian Teknis Metode Double Decking pada Kedalaman Lubang Bor 8 m untuk Mengurangi Isian Bahan Peledak per Delay Peledakan dengan Batasan PPV 3 mm/s di Tambang Batubara PT Kaltim Prima Coal

Dwinagara, Barlian and Titisariwati, Indun and AWALIA RAHMA, ZUKHRUFA (2019) Kajian Teknis Metode Double Decking pada Kedalaman Lubang Bor 8 m untuk Mengurangi Isian Bahan Peledak per Delay Peledakan dengan Batasan PPV 3 mm/s di Tambang Batubara PT Kaltim Prima Coal. Teknik Pertambangan UPN Veteran Yogyakarta, Yogyakarta.

[img]
Preview
Text
24. Hsl UjiKajian Teknis Metode Double Decking pada Kedalaman Lubang Bor 8 m.pdf

Download (3MB) | Preview

Abstract

The final target of the blasting plan is to increase the depth of the drill hole which was initially 4 m to 8 m. This is in accordance with the ability of the Liebherr 996 and Hitachi EX3600 diggers located in Pit Pinang South. And PT. Kaltim Prima Coal has a standard for the value of PPV (Peak Particle Velocity) which is 3 mm / s. Based on observations in Pit Pinang South, at a distance of 600 m and 700 m from the ground vibration observation point the depth of the drill hole is 4 m deep with 48 kg explosive filling to produce the desired fragmentation and produce PPV values below 3 mm / s. After analyzing the scaled distance formula the results obtained are for a distance of 600 maximum contents of explosives is 84 kg and for a distance of 700 m the maximum content of explosives is 115 kg. So with the double decking method, the drill hole depth can be increased to 8 m and reducing explosive fill per delay or explosive filling will be the same as the 4 m drill hole depth. Because the double decking method divides 8 m into 4 m bottom and top each has a detonator. So that the PPV value produced is below 3 mm / s. After the recommendation was obtained, an experiment was carried out at a distance of 600 m and 700 m using the double decking method at the depth of the drill hole 8 m and the results of all experiments produced PPV below 3 mm / s.

Item Type: Other
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: DR. Ir. MT BARLIAN DWINAGARA
Date Deposited: 11 Mar 2022 08:40
Last Modified: 11 Mar 2022 08:40
URI: http://eprints.upnyk.ac.id/id/eprint/28423