PENINGKATAN PRODUKTIVITAS ALAT MUAT DAN ALAT ANGKUT PENAMBANGAN ANDESIT SITE BRAVO 9 PT SUMBER GUNUNG MAJU DESA UKISARI, KEC BOJONEGARA, KAB SERANG, BANTEN

PRABOWO, KRISTANTO ADI (2022) PENINGKATAN PRODUKTIVITAS ALAT MUAT DAN ALAT ANGKUT PENAMBANGAN ANDESIT SITE BRAVO 9 PT SUMBER GUNUNG MAJU DESA UKISARI, KEC BOJONEGARA, KAB SERANG, BANTEN. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of 1. Cover Skripsi.pdf]
Preview
Text
1. Cover Skripsi.pdf

Download (295kB) | Preview
[thumbnail of 3. Daftar isi.pdf]
Preview
Text
3. Daftar isi.pdf

Download (191kB) | Preview
[thumbnail of 4. Abstrak.pdf]
Preview
Text
4. Abstrak.pdf

Download (291kB) | Preview
[thumbnail of 6. Daftar Pustaka.pdf]
Preview
Text
6. Daftar Pustaka.pdf

Download (286kB) | Preview
[thumbnail of 2. Halaman Pengesahan.pdf]
Preview
Text
2. Halaman Pengesahan.pdf

Download (336kB) | Preview
[thumbnail of 5.-Draft-Skripsi-Full.pdf] Text
5.-Draft-Skripsi-Full.pdf
Restricted to Repository staff only

Download (3MB)

Abstract

RINGKASAN
Masalah yang dihadapi oleh PT. Sumber Gunung Maju adalah belum
tercapainya target produksi andesit sebesar 50.000 ton/bulan. Penelitian ini
bertujuan untuk menganalisis faktor yang mempengaruhi produksi dari alat muat
dan alat angkut, melakukan upaya peningkatan produksi andesit dengan
mengoptimalkan waktu kerja efektif alat muat dan alat angkut setelah perbaikan
serta menganalisis pengaruh waktu efektif sebelum dan sesudah perbaikan terhadap
efisiensi kerja.
Metode penelitian yang dilakukan dalam kajian ini yaitu dari studi literatur,
observasi langsung di lapangan untuk melakukan pengambilan data primer dan
sekunder. Data yang diperoleh dilakukan pengolahan dan analisis data.
Faktor – faktor yang mempengaruhi kegiatan produksi andesit ialah metode
pemuatan yang dilakukan yaitu dengan menggunakan top loading dengan cara
pemuatannya single backup yang dinilai lebih cepat dan disamping itu juga karena
keterbatasan alat angkut dan jumlah curah bucket sebanyak 7 kali curah yang
menghasilkan nilai bucket fill factor sebesar 89%.
Produksi penambangan batu andesit pada PT. Sumber Gunung Maju
kemampuan produksi alat muat excavator Kobelco sk 330 sebesar 81.777 ton/bulan
pada front penambangan Batulawang Tengah, kemudian 72.825 ton/bulan front
Batulawang Barat dan produksi alat angkut Hino fm 260 ti dari 44.994 ton/bulan
bulan pada front Penambangan Btulawang Tengah, kemudian 42.056 ton/bulan
pada front Batulawang Barat.
Upaya peningkatan produksi dapat dilakukan dengan meningkatkan efisiensi
kerja, dengan cara meminimalkan waktu hambatan kerja yang dapat ditekan. Dari
hasil perhitungan efisiensi kerja mengalami peningkatan, pada alat muat meningkat
dari 174,5 jam menjadi 187,4 jam dan alat angkut meningkat dari 164,2 jam menjadi
175,2 jam, dengan meningkatnya efisiensi kerja maka kemampuan produksi alat
muat alat muat excavator Kobelco sk 330 dari 81.777 ton/bulan meningkat menjadi
87.722 ton/bulan pada front penambangan Batulawang Tengah, kemudian pada
front Batulawang Barat meningkat dari 72.825 ton/bulan menjadi 78.119 ton/bulan
dan kemampuan produksi alat angkut Hino fm 260 ti dari 44.994 ton/bulan
meningkat menjadi 48.009 ton/bulan pada front Penambangan Btulawang Tengah,
kemudian meningkat dari 42.056 ton/bulan menjadi 44.873 ton/bulan pada front
Batulawang Barat. Dikarenakan produksi alat angkut yang belum mencapai target
produksi maka dilakukan upaya lain berupa peningkatan efisiensi kerja dan
penoptimalan waktu edar sehingga mencapai target produksi yang dinginkan yaitu
sebesar 50.000 ton/bulan.
Kata kunci: andesit, produksi, efisiensiSUMMARY
The problems faced by PT. The source of Gunung Maju is that the andesite
production target of 50,000 tons/month has not been achieved. This study aims to
analyze the factors that affect the production of loading and conveyance equipment,
to make efforts to increase andesite production by optimizing the effective working
time of loading and conveying equipment after repair and to analyze the effect of
effective time before and after repairs on work efficiency.
The research method used in this study is the study of literature, direct
observation in the field to collect primary and secondary data. The data obtained
were processed and analyzed data.
Factors that affect andesite production activities are the loading method
carried out by using top loading by loading a single backup which is considered
faster and besides that, because of the limitations of transportation equipment and
the amount of bulk bucket as much as 7 times the bulk which results in a bucket fill
factor value of 89%.
Andesite mining production at PT. Sumber Gunung Maju, the production
capacity ofloading equipment excavator Kobelco sk 330of 81,777 tons/month on
the front Batulawang Tengah mining, then 72,825 tons/month on the front
Batulawang Barat and the production capability of Hino fm 260 ti transportation
equipment from 44,994 tons/month on the Btulawang Tengah Mining front, then
42,056 tons/month on the Batulawang Barat front.
Efforts to increase production can be done by increasing work efficiency, by
minimizing the time of work barriers that can be suppressed. From the results of
the calculation of work efficiency has increased, at loading equipment increased
from 174.5 hours to 187.4 hours and transportation equipment increased from
164.2 hours to 175.2 hours, with increasing work efficiency the production
capability of loading equipment Kobelco sk 330 excavator loading equipment from
81,777 tons/month increased to 87,722 tons/month on the Batulawang Tengah
mining front, then 72,825 tons/month to 78,119 tons/month on the Batulawang
Barat front and the production capability of Hino fm 260 ti transportation
equipment from 44,994 tons/month month increased to 48,009 tons/month on the
Btulawang Tengah Mining front, then 42,056 tons/month to 44,873 tons/month on
the Batulawang Barat front. Due to the production of transportation equipment
that has not reached the production target, other efforts are made in the form of
increasing work efficiency and optimizing circulation time so that it reaches the
production target of 50,000 tons/month.
Keywords: andesite, production, efficiency

Item Type: Thesis (Other)
Uncontrolled Keywords: andesit, produksi, efisiensi
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 08 Feb 2022 02:36
Last Modified: 21 Nov 2022 02:40
URI: http://eprints.upnyk.ac.id/id/eprint/28270

Actions (login required)

View Item View Item