Determination of temporary support for squeezing zone underground mine PT. Cibaliung Sumberdaya

ANGGARA, ROCHSYID and Dwinagara, Barlian (2018) Determination of temporary support for squeezing zone underground mine PT. Cibaliung Sumberdaya. IOP Publishing, Yogyakarta. (Unpublished)

[img]
Preview
Text
5. Penilaian_ IOP Conf.Ser.Earth&Environ._Determination of Temporary Suppport.pdf

Download (158kB) | Preview

Abstract

Abstract. Underground Mining activity will always face deformation and instability of the rock mass around the underground openings. A large deformation wes reported to occur on decline tunnel of PT. Cibaliung Sumberdaya (PT. CSD). Prior to this event, the same tunnel, which the tunnel wall had been refurbished into the proposed original shape. This implies that the squeezing zone had developed around the tunnel and the same support system couldn ’t resist the increasing load. Therefore, an analysis of squeezing zone around the excavation should be carried out. Conducted analysis started by the modelling the excavation should be carried out. Conducted analysis started by the modelling the excavation the tunnel to get causing the cross cut failure. Then, back analysis was carried out to estimate the decreasing strength of the rock mass inside the squeezing. After that, squeezing zone can be determine the support systems to prevent the failure of rocks. The strain from back analysis results showing that similarity compared to the monitoring result when the modulus deformation E and the strength parameter mb and s of Hoek Brown Failure criteria of the materials in the squeezing zone is 40% peak strength. Analysis fortemporary support shows that need 250 mm thick shotcrete, 1 mm of spacing rock bolting, and 0.5 spacing reinforcement beam. Although, the floor of tunnel should be given extra consideration because could given high load, so must be installing rock bolt to helping stabilization.

Item Type: Other
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: DR. Ir. MT BARLIAN DWINAGARA
Date Deposited: 09 Feb 2022 09:26
Last Modified: 09 Feb 2022 09:26
URI: http://eprints.upnyk.ac.id/id/eprint/28078

Actions (login required)

View Item View Item