PADHI, ADITYO NUGROHO (2012) ANALISA KESTABILAN LERENG BLOK KEHAM PT. GUNUNGBAYAN PRATAMA COAL BLOK I KECAMATAN MUARA MUNTAI KABUPATEN KUTAI KARTANEGARA PROPINSI KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
Preview |
Text
RINGKASAN.pdf Download (71kB) | Preview |
Preview |
Text
ABSTRACT.pdf Download (66kB) | Preview |
Abstract
PT. Gunungbayan Pratama Coal (GBPC) Blok I mengoperasikan tambang
batubara yang berlokasi di Kecamatan Muara Muntai, Kabupaten Kutai
Kertanegara, Propinsi Kalimantan Timur. Daerah penambangan PT. GBPC Blok I
mempunyai luas sekitar ± 8.365 Ha. Produksi batubara yang dihasilkan adalah
29.500 ton/bulan. Daerah penambangan Blok Keham belum dilakukan kegiatan
penambangan, tetapi dari peta rancangan design bukaan tambang ditemukan
adanya beberapa lereng keseluruhan dalam kondisi tidak aman, maka perlu
dilakukan analisa dan perancangan terhadap lereng penambangan agar tidak
terjadi longsoran pada lokasi penambangan.
PT. GBPC menerapkan perancangan lereng penambangan dengan
mendasarkan pada material penyusun lereng penambangan. Parameter sifat fisik
dan mekanik didapatkan dengan cara melakukan uji terhadap material yang akan
dianalisis, uji tersebut dilakukan di laboratorium TEKMIRA Bandung.
Kondisi Blok Keham saat ini ada beberapa rancangan bukaan tambang
yang dalam kondisi tidak aman. Hasil uji laboratorium di atas kemudian
ditentukan nilai yang dapat mewakili nilai-nilai tersebut yang kemudian dipakai
sebagai data dalam analisa kestabilan lereng. Nilai sifat fisik dan sifat mekanik
yang dipakai adalah nilai rata-rata dari hasil uji laboratorium. Nilai rata-rata
digunakan karena percontoh batuan yang diuji setiap lubang bor tidak dapat
mewakili kondisi dari karakteristik material yang ada.
Berdasarkan hasil analisa menunjukkan simulasi lereng tunggal untuk
material batu lanau dengan FK 2,76, batu lempung FK 2,72, batu pasir FK 4,29
dan soil FK 1,99. Hasil analisa simulasi lereng tunggal dapat dikatakan dalam
kondisi aman dengan nilai FK ≥ 1,3. Analisa untuk lereng keseluruhan dibuat
beberapa versi menggunakan geometri lereng tunggal yaitu tinggi 10 m dan
kemiringan 70°. Kemudian tinggi lereng keseluruhannya menyesuaikan dengan
lapisan batubara yang akan ditambang (coal seam target). Rekomendasi lereng
keseluruhan untuk setiap sayatan dapat menggunakan rekomendasi lereng
keseluruhan dari setiap lubang bor terdekat dari sayatan tersebut.
PT. Gunungbayan Pratama Coal Block I operates a coal mine located
Muara Muntai, District Kutai Kartanegara East Kalimantan. Mining area of PT.
Gunungbayan Pratama Coal Block I approximately ± 8.365 Ha wide with coal
production is 29.500 tonnes / month. Block Keham mining areas have not been
performed a mining activities, but from the design pit map found that some
overall slope in unsafe conditions, it is necessary to analyze and design the mining
slopes to prevent failure on a mine site.
PT. Gunungbayan Pratama Coal Blok I apply to mining slope design based
on the material compose the slope mining. Physical and mechanical parameters
obtained by the test material to be analyzed, the test was conducted in the
laboratory TEKMIRA Bandung.
Block Keham current conditions there are some designs that mine
openings in unsafe conditions. Laboratory test results on the top and then
determined the value that can represent these values were then used as data in the
analysis of slope stability. The value of the physical and mechanical properties
that is used is the average value of the results of laboratory tests. The average
value is used for sample rocks that tested each drill hole may not represent the
condition of the existing material characteristics.
Based on the simulation analysis showed a single slope with silt stone
material have SF 2,76, claystone have SF 2,72, sandstone have SF 4,29 and soil
have SF 1,99. Single slope analysis of simulation results can be said to be in a safe
condition with FK values ≥ 1.3. Analysis for the overall slope geometry created
several versions using a single slopes are 10 m high and 70 ° tilt. Then the high
slope whole match to be mined coal seams (coal seam target). Recommendations
overall slope for each incision can use on the slopes of the entirety of each drill
hole nearest the incision.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 30 May 2016 08:11 |
Last Modified: | 02 Jun 2016 03:18 |
URI: | http://eprints.upnyk.ac.id/id/eprint/2739 |
Actions (login required)
![]() |
View Item |