Hasil Uji Similaritas_Analysis of temporary support effectiveness in very softrock tunneling at Cisumdawu’s Tunnel

EVENY, OFFI NUR and Aryanti, D E and Rusdiana, M and SAPTONO, Singgih (2018) Hasil Uji Similaritas_Analysis of temporary support effectiveness in very softrock tunneling at Cisumdawu’s Tunnel. IOP Conf. Series: Earth and Environmental Science 212.

[thumbnail of Analysis of temporary support effectiveness in very softrock tunneling at Cisumdawu’s Tunnel.pdf]
Preview
Text
Analysis of temporary support effectiveness in very softrock tunneling at Cisumdawu’s Tunnel.pdf

Download (4MB) | Preview

Abstract

Temporary support aims to minimize deformation, it is installed immediately after
excavation, especially in the case of softrock tunnels. In this study, Numerical modeling is used
to analyze the optimization of the support system design, and then compared with the
monitoring results. Based on numerical analysis, it is found that installation of pre-support
before excavation is recommended, it can reduces deformation on the tunnel roof. This is
advantageous, because pre-support decrease installation of other support. The use temporary
support such as shotcrete and steel set, is enough to produce a more stable tunnel condition,
especially for tunnel sections not affected by pre-support such as the tunnel floor.

Item Type: Other
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Nurul Alifah Rahmawati
Date Deposited: 10 Nov 2021 03:57
Last Modified: 10 Nov 2021 04:01
URI: http://eprints.upnyk.ac.id/id/eprint/27007

Actions (login required)

View Item View Item