PERHITUNGAN CADANGAN MINYAK BUMI PADA PROSPEK SUMUR “X”, FORMASI BEKASAP, CEKUNGAN SUMATERA TENGAH BERDASARKAN DATA SEISMIK DENGAN MENGGUNAKAN METODE VOLUMETRIK

Amin, Al (2016) PERHITUNGAN CADANGAN MINYAK BUMI PADA PROSPEK SUMUR “X”, FORMASI BEKASAP, CEKUNGAN SUMATERA TENGAH BERDASARKAN DATA SEISMIK DENGAN MENGGUNAKAN METODE VOLUMETRIK. Other thesis, UPN "VETERAN" YOGYAKARTA.

[img]
Preview
Text
ABSTRAK.pdf

Download (24kB) | Preview

Abstract

Telah dilakukan penelitian yang bertujuan untuk mengetahui kualitas dan karakteristik reservoir berdasarkan analisa log di lapangan Prospek Sumur ”X”. menggunakan peta bawah permukaan dan menghitung besarnya cadangan hidrokarbon dengan metode volumetrik. Pada Lapangan Sumur “X” termasuk kedalam kategori perangkap struktur. Lapangan Sumur “X” dapat dibagi menjadi 2 bagian antiklin (Block A and Block B) dimana masing masing blok secara umum relative terpisah dengan batas OWC (Oil Water Contact) yang berbeda. Metodologi penelitian ini adalah menentukan litologi dari data log yang digunakan sebagai dasar korelasi antar Sumur dan menghitung nilai saturasi air serta porositas dengan persamaan Archie. Kemudian nilai tersebut digunakan untuk menghitung volume reservoar dengan metode volumetrik, sedangkan potensi cadangan hidrokarbon dihitung menggunakan persamaan IOIP ( Initial Oil In Place) . Dari analisa data dan pembahasan diinterpretasikan bahwa Lapisan Bekasap merupakan lapisan produksi yang menghasilkan minyak dari reservoar batupasir di Formasi Bekasap. Karakterisasi reservoar telah dilakukan dengan data Sumur dan seismik, reservoar tersebut umumnya mempunyai nilai porositas 20% dan saturasi air 40%. Hasil perhitungan cadangan dengan metode perhitungan volumetrik dari reservoar tersebut sebesar 477,528,315 STB ( Stock Tank Barrels). Kata kunci : Perangkap struktur ,Volume Bulk, IOIP ABSTRACT A study that aims to determine the quality and characteristics of the reservoir based on log analysis in the field prospect wells "X". using subsurface maps and calculate the amount of hydrocarbon reserves by volumetric methods. In the Field wells "X" belongs to the category of the trap structure. Field wells "X" can be divided into 2 parts anticline (Block A and Block B), where each block is generally relatively separately with different boundary OWC (Oil Water Contact). The methodology of this study is to determine the lithologic log of the data used as the basis for calculating the correlation between wells and water saturation and porosity values with Archie equation. Then the value is used to calculate the volume of reservoir volumetric method, while potential hydrocarbon reserves calculated using equation IOIP (( Initial Oil In Place). From the data analysis and discussion Bekasap interpreted that layer is a layer of oil production resulting in Formation sandstone reservoir Bekasap. Reservoir characterization has been done with well data and seismic, reservoir generally have porosity values of 20% and a water saturation of 40%. The results of calculation of reserves by volumetric calculation method of reservoir amounted to 477,528,315 STB (Stock Tank Barrels). Keywords: Traps structure, bulk volume, IOIP

Item Type: Thesis (Other)
Subjects: T Technology > TD Environmental technology. Sanitary engineering
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Sarimin Sarimin
Date Deposited: 26 May 2016 02:04
Last Modified: 26 May 2016 02:04
URI: http://eprints.upnyk.ac.id/id/eprint/2479

Actions (login required)

View Item View Item