RANCANGAN TEKNIS PENAMBANGAN BATUANDESIT DI CV. HANDIKA KARYA KABUPATEN KULON PROGO DIY

TRIYONO, JUNI (2016) RANCANGAN TEKNIS PENAMBANGAN BATUANDESIT DI CV. HANDIKA KARYA KABUPATEN KULON PROGO DIY. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of 1 COVER.pdf]
Preview
Text
1 COVER.pdf

Download (36kB) | Preview
[thumbnail of 2 LEMBAR PENGESAHAN.pdf]
Preview
Text
2 LEMBAR PENGESAHAN.pdf

Download (73kB) | Preview
[thumbnail of 3 DAFTAR ISI.pdf]
Preview
Text
3 DAFTAR ISI.pdf

Download (48kB) | Preview
[thumbnail of 4 ABSTRAK.pdf]
Preview
Text
4 ABSTRAK.pdf

Download (13kB) | Preview

Abstract

RINGKASAN
CV. Handika Karya merupakan salah satu perusahaan yang melakukan
penambangan batuandesit terletak di Desa Hargorejo dan Desa Kalirejo,
Kecamatan Kokap, Kabupaten Kulon Progo, Provinsi Daerah Istimewa
Yogyakarta. CV. Handika Karya mempunyai rencana produksi penambangan
tahun pertama hingga tahun ketujuh sebesar 120.000 bcm atau 330.000 ton per
tahun. Luas IUP Operasi Produksi adalah 63,72 hektar.
Permasalahan pada penelitian ini adalah CV. Handika Karya memerlukan
rancangan penambangan untuk rencana produksi batuandesit. Metode
penyelesaian masalah dilakukan dengan pengolahan data sekunder yaitu
mengolah peta topografi untuk membuat desain penambangan dan menaksir
cadangan batuandesit.
Berdasarkan batas lantai dasar penambangan yang direncanakan dan batas
terluar penambangan, diketahui cadangan sebesar 4.683.875 bcm atau 12.880.656
ton. Geometri lereng penambangan untuk bench high adalah 5 m, bench width 5
m, single slope 90o, dan overall slope 48o. Lebar pada jalan lurus adalah 7 m,
lebar jalan pada tikungan 11 m, nilai radius tikungan jalan minimum 6 m, beda
tinggi kemiringan melintang 0,105 m dari cross slope 30 mm/m, super elevasi
sebesar 0,44 m, dan kemiringan jalan angkut yang digunakan maksimal 10 %.
Hasil yang diperoleh untuk penjadwalan produksi batuandesit pada daerah
penelitian pada 7 tahun pertama sebesar 337.040 ton pada tahun pertama, 337.145
ton pada tahun kedua, 336.970 ton pada tahun ketiga, 337.185 ton pada tahun
keempat, 336.918 ton pada tahun kelima, 337.078 ton pada tahun keenam, dan
336.893 ton pada tahun ketujuh.
Kebutuhan alat mekanis selama kegiatan penambangan tidak mengalami
penambahan unit untuk alat muat, sedangkan untuk alat angkut mengalami
penambahan unit. Hal ini disebabkan karena efektifitas kerja alat berkurang setiap
tahunnya. Alat muat yang digunakan di CV. Handika Karya Excavator CAT 336D
berjumlah 1 unit dan alat angkut DT Mitsubishi Colt diesel hd 125ps berjumlah 27
unit.

ABSTRACT
CV. Handika Karya is one of the mining companies of andesite quarry,
located in the Hargorejo village and Kalirejo village, Kokap, Kulon Progo,
Special Region of Yogyakarta. CV. Handika Karya has a production plan from the
first until the seventh year of andesite 120.000 bcm/year or 330.000 tones/year.
CV. Handika Karya has 63,72 hectares of IUP area.
The identified problem of this research is CV. Handika Karya needs a mine
design for andesite mining production plan. The problem-solving method is done
by processing secondary data which is processing topographic map to build the
mine design and to estimate the andesite reserve.
Based on pit bottom limit plan and ultimate quarry slope, it is found that the
reserve is 4,683,875 bcm or 12,880,656 tons. Mining slope geometry of bench
high is 5 m, bench width is 5 m, single slope is 90o, and overall slope is 48o. The
width of the straight road is 7 m, the width of the curved road is 11 m, the value of
the minimum corner road radius is 6 m, cross slope 30 mm/m, super elevation is
0.44 m of the curved road width and 10% maximum grade of hauling road. The
obtained result of andesite production scheduling in the study area is 337,040 tons
on the first year, 337,145 tons on the second year, 336,970 tons on the third year,
337,185 tons on the fourth year, 336,918 tons on the fifth year, 337,078 tons on
the sixth year, and 336,893 tons on the seventh year.
There is no addition of the unit of the loader in the need of mechanical
equipment for mining activities, whereas the unit of the haulers has increased.
This happened due to the effectiveness of work equipment decreases in every
year. Mine equipment that is used in CV. Handika Karya are Excavator CAT
336D loader for 1 unit and DT Mitsubishi Colt diesel hd 125ps haulers for 27
units.

Item Type: Tugas Akhir (Other)
Subjek: T Technology > T Technology (General)
Divisions: x. Eprints Lama > 4
Depositing User: Basir Umaryadi
Date Deposited: 25 May 2016 04:17
Last Modified: 25 May 2016 04:17
URI: http://eprints.upnyk.ac.id/id/eprint/2421

Actions (login required)

View Item View Item