EVALUASI PERENCANAAN DIMENSI TANGGUL PENGARAH ALIRAN MATERIAL LUMPUR HASIL PENAMBANGAN BIJIH NIKEL DI PT. GANE PERMAI SENTOSA KECAMATAN OBI, KABUPATEN HALAMAHERA SELATAN PROVINSI MALUKU UTARA

Lestari, Lilis (2016) EVALUASI PERENCANAAN DIMENSI TANGGUL PENGARAH ALIRAN MATERIAL LUMPUR HASIL PENAMBANGAN BIJIH NIKEL DI PT. GANE PERMAI SENTOSA KECAMATAN OBI, KABUPATEN HALAMAHERA SELATAN PROVINSI MALUKU UTARA. Other thesis, UPN "VETERAN" YOGYAKARTA.

[thumbnail of Intisari 26.pdf]
Preview
Text
Intisari 26.pdf

Download (48kB) | Preview

Abstract

Intisari
Kegiatan penambangan PT. Gane Permai Sentosa di Desa Kawasi Pulau Obi
mengakibatkan dampak bagi area penambangan dan sungai seperti : terjadinya perubahan
topografi, terjadinya erosi, serta adanya material lumpur yang mengalir bersama air limpasan.
Penelitian ini bertujuan untuk membuat dimensi tanggul yang sesuai dengan debit air limpasan
agar lumpur yang terkandung di dalam air limpasan tersebut tidak mencemari sungai.
Pencemaran tersebut tidak hanya mencemari sungai tetapi juga dapat membahayakan biota-biota
perairan serta mengakibatkan adanya pendangkalan sungai.
Metode yang dilakukan adalah metode survei, pengolahan data dan analisis data.
Pengolahan data dan analisis data dilakukan setelah semua data diperoleh, langkah ini dilakukan
untuk mengetahui dimensi tanggul yang akan dibuat dan menentukan perencanaan pembangunan
tanggul.
Dari hasil penelitian dapat disimpulkan bahwa dengan debit 4,35 m3/detik maka dapat
diketahui tinggi perencanaan tanggul adalah 3,73 m. Pengelolaan material lumpur dengan cara
dikeruk setelah hujan lalu dimasukkan ke dalam kantong lumpur lalu digunakan kembali untuk
reklamasi.
Kata kunci : Dimensi Tanggul, Material Lumpur, Air Limpasan, Erosi

Abstrac
Mining activity PT. Gane Permai Sentosa in Kawasi village Obi island can result impact
for mining territory and river, like : change happen of topography, erosion happen, and mud
material are flow whit runoff water. This research head for make the dike dimension in agree
with the rate runoff water order mud be contained in the runoff water do not contaminet the river.
That contamination do not only contaminet the river but can also dangerous for aquatic biota and
result in river superficialty.
Which method do is survey method, data processing and data analysis. Data processing
and data analysis do after all data obtainable, this step do for to find out to make dike dimension
and determining planning dikes.
From the research it can be concluded that the discharge 4.35 m3/s then can to find out
high dike planning is 3,73 m. Management of mud material with dredging manner after rain then
enter into mud bag and then be reused for reclamation.
Keywords : Dike Dimension, Mud Material, Runoff Water, Erosion

Item Type: Thesis (Other)
Subjek: T Technology > TD Environmental technology. Sanitary engineering
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Basir Umaryadi
Date Deposited: 25 May 2016 03:22
Last Modified: 25 May 2016 03:22
URI: http://eprints.upnyk.ac.id/id/eprint/2408

Actions (login required)

View Item View Item