PT. Antam (Persero Tbk), merupakan perusahaan yang sedang melakukan
perencanaan pengembangan penambangan bijih nikel dengan sistem tambang
terbuka di Pulau Pakal Buli Kecamatan Maba Kabupaten Halmahera Timur
Propinsi Maluku Utara. Rancangan lereng yang dibuat pada beberapa lokasi di
Pulau Pakal membutuhkan analisis kestabilan lereng agar dapat memberikan
rekomendasi geoteknik yang bisa menunjang kelancaran kegiatan penambangan
dan mengurangi potensi longsor.
Kajian geoteknik akan dilakukan antara lain pada lereng penambangan,
Lokasi Grizzly, Lokasi Dermaga Curah, Check Dam, Lokasi Taj Mahal, dan
Bendungan A.
Analisis geoteknik dimulai dengan pengambilan sample material tanah dan
batuan di beberapa lokasi, dan dilanjutkan dengan melakukan pengujian
laboratorium terhadap sample tersebut sehingga didapatkan properties material
yang akan digunakan dalam permodelan geoteknik.
Berdasarkan hasil uji laboratorium, kekuatan batuan yang termasuk dalam
material pembentuk lereng di setiap lokasi yang akan dikaji diklasifikasikan
sebagai batuan sangat lemah, sehingga dimungkinkan berpotensi terjadi longsoran
busur. Pemodelan menggunakan metode kesetimbangan batas dengan bantuan
Software Slide 6.0 by Rocsciencedengan pedoman lereng dalam keadaan mantap
untuk lereng tunggal adalah FK ≥1,20 dan untuk lereng keseluruhan FK ≥1,30
(Canmet, 1979).
Rekomendasi untuk geometri lereng tunggal area tambang didapat pada
tinggi 6 m dan sudut tunggal 60⁰; lereng keseluruhan area tambang tinggi 60
meter dan sudut kesuluruhan 30⁰; lereng posisi pondasi grizzly pada tinggi 17,45
meter dan sudut 61⁰; lereng dermaga curah pada tinggi 23 meter dan sudut 17⁰;
lereng tanggul check dam dan Taj Mahal didapat pada nilai safety factor terkecil
adalah 1,82 untuk kondisi jenuh check dam dan 1,33 untuk kondisi setengah jenuh
Taj Mahal. Dalam artian bahwa kondisi Check Damdan Taj Mahal dengan
geometri lereng seperti sekarang dalam kondisi aman. Sedangkan rekomendasi
lereng bendungan A pada tinggi 16 m dan sudut 30
o
. Berdasarkan hasil simulasi
permodelan geoteknik yang telah dilakukan, maka dapat dianalisis beberapa
faktor yang mempengaruhi kemantapan lereng, antara lain yaitu karakteristik
material, geometri lereng, pengaruh air tanah, dan gaya luar.
ABSTRACT
PT. Antam (Persero Tbk.), is a company that is doing the planning
development of nickel ore mining by open pit system in Buli, Pakal Island,
District Maba, East Halmahera of North Maluku. Plan of slope that made at some
location in Pakal Island requires mining slope stability analys is in order to
provide geotechnical recommendations that could support the well operation of
mining and reducing the potential for landslides.
Geotechnical study will be conducted, among others, on the slope mining,
Grizzly Location, Dermaga Curah Location, Check Dam, Location Taj Mahal,
and Bendungan A.
Geotechnical analysis starts with taking samples of soil and rock material
at several locations, and followed by laboratory testing of the samples to obtain
the material properties to be used in geotechnical modeling.
Based on the results of laboratory tests, including rock strength in the
slope forming material in each location that will be studied are classified as very
weak rock, that is potentially possible to made circular failure. Modeling using the
limit equilibrium method with the help of Slide 6.0 Software by Rocscience, with
slopes in the steady state guidelines for single slope is ≥1.20 and ≥1.30 for overall
slopes ( CANMET, 1979).
Recommendations for slope geometry single mining location obtained at
height of 6 m and 60⁰; overall slopes mine area, high 60 m and 30⁰; slope of
Grizzly location on a high 17.45 meters and the angle of 61⁰; Dermaga Curah’s
slope at high 23 m and 17 ⁰; Check Dam and Taj Mahal obtained at the smallest
value of the safety factor is 1.82 for saturated condition Check Dams and 1.33 for
half saturated condition of the Taj Mahal. In the sense that the conditions of
Check Dam and the Taj Mahal with slope geometry as it is now in a safe
condition . Bendungan A while on the slopes at 16 m height and angle of 30
o
.
Based on the simulation results of geotechnical modeling has been done, it can be
analyzed several factors that affect the stability of slopes, among others, material
characteristics, slope geometry, groundwater influence, and external forces.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Ratna Sufiatin |
Date Deposited: | 24 May 2016 08:31 |
Last Modified: | 24 May 2016 08:31 |
URI: | http://eprints.upnyk.ac.id/id/eprint/2327 |
Actions (login required)
![]() |
View Item |