PENINGKATAN PRODUKTIVITAS ALAT BOR PADA KUARI BATUGAMPING DI PT. INDOCEMENT TUNGGAL PRAKARSA Tbk PALIMANAN CIREBON JAWA BARAT

ANWAR, FARID SUBAKTI (2013) PENINGKATAN PRODUKTIVITAS ALAT BOR PADA KUARI BATUGAMPING DI PT. INDOCEMENT TUNGGAL PRAKARSA Tbk PALIMANAN CIREBON JAWA BARAT. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of ABSTRACT - FARID SUBAKTI ANWAR - 112060068.pdf]
Preview
Text
ABSTRACT - FARID SUBAKTI ANWAR - 112060068.pdf

Download (15kB) | Preview
[thumbnail of Rangkuman Penegasan Regsosek 2022.pdf] Text
Rangkuman Penegasan Regsosek 2022.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

Limestone mining by PT. Indocement Tunggal Prakarsa Tbk Palimanan
Cirebon West Java located in Palimanan Barat Village, District Gempol, Cirebon,
West Java Province. Mining activities that have been done include: clearing,
overburden stripping, dismantling, loading and transporting. Limestone unloading
process using drilling and blasting method.
One factors that affect maximum operation of blasting, among others is
depending on drilling activity. In the reality drilling machines production in PT.
ITP Tbk Palimanan Cirebon still does not meet expectations, it can be seen from
the real drilling production of drilling machines used in mining limestone
quarrying PT. ITP Tbk palimanan Cirebon before repairing. Drilling production
amounted to 2,057,323.09 tons / year. Drilling production is smaller than
limestone production target for clinker that equal to 3,366,469 tons / year.
Therefore, there should be increasing the productivity of drilling machines
to achieve production targets. Factors affecting the drilling process and affect the
production rate of drilling are drilling rate, drilling time efficiency, effective
working time, operator skills and distance carrier spacing and burden.
Increasing the effective working time in an attempt to increase production by
drilling are lowering barriers that still can be avoided. Imcreasing spacing and
burden distance needs to be done for the goal of equal volume produced. It can be
larger, so the drilling production increased and production targets achieved.
There are the result of increasing drilling production:
1. Increasing effective working time, which reduces the time constraints that
can be avoided, then the resulting production is 3,045,389.137 tons / year.
2. Increasing effective working time and increasing spacing and burden
distance, then the result production is 4,138,770.02 tons / year. Meet
production targets.
Keywords: Productivity, Drilling, Basting

Item Type: Thesis (Other)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Yuli
Date Deposited: 24 May 2016 07:22
Last Modified: 20 Oct 2022 08:15
URI: http://eprints.upnyk.ac.id/id/eprint/2308