PT. Jorong Barutama Greston di Kalimantan Selatan ini menggunakan
sistem tambang terbuka (surface mining), di mana akibat dari penambangan tersebut
terbentuk lahan bekas penambangan yang kondisinya sangat berbeda dengan
keadaan sebelumnya, dimana di lahan bekas penambangan tersebut telah terjadi
kerusakan topografi, hilangnya tanah pucuk (top soil), tanah longsor, adanya
genangan air, tanah menjadi gersang dan berbatu, penurunan permukaan air tanah,
serta terbentuknya cekungan-cekungan yang berukuran besar di lahan bekas
penambangan sehingga sukar untuk dimanfaatkan. Dari hasil pengukuran dan
perhitungan di pit UC West tersebut maka dapat Klasifikasikan pada lokasi A=25%
dikategorikan agak curam sedangkan pada lokasi B=16,95% dikategorikan agak
curam dan C=23,75 % dikategorikan agak curam berdasarkan (Tabel3.3 Klasifikasi
Kecuraman Lereng).Kondisi tanah di pit UC West bisa dikatakan sangat buruk
karena sesuai dengan hasil laboratorium PT. Jorong Barutama Greston menunjukkan
parameter unsur-unsur tanah berupa C, N, K, Na, Ca, Mg memiliki harkat yang
relatif rendah dapat dilihat pada (Lampiran G). Hal tersebut terbukti dengan lamanya
pertumbuhan tanaman yang telah ditanam pada lokasi tersebut. Berkurangnya unsurunsur
hara tersebut sebaiknya dilakukan pemupukan atau penaburan Mulsa yaitu
berupa daun-daunan kering dan kulit kayu yang ditumbuk agar tanah menjadi lebih
subur.
Erosi merupakan suatu proses pengelupasan dan pemindahan partikel-partikel
tanah atau batuan akibat energi kinetis (air, salju, angin) (PERMENHUT, 2009).
Untuk memperkirakan besarnya erosi yang diakibatkan oleh air pada suatu daerah
dapat dipergunakan persamaanUSLE (Universal Soil Loss Equation), menurut
Wischmeier dan Smith (1960). Berdasarkan perhitungan tingkat erosi dan
sedimentasi di pit UC West A berjumlah 97,13 ton/ha/tahun, pit UC West B
berjumlah 92,50 ton/ha/tahundan pit UC West C berjumlah142,02 ton/ha/tahun
(Lampiran H), dari hasil tersebut maka diklasifikasikan menurut Departemen
Kehutanan dengan Harkat sedang antara 60-180 ton/ha/tahun. Dari hasil perhitungan
erosi dan sedimentasi yang sudah dilakukan penataan lereng maka nampak jelas
perbandingannya. Hasil perhitungan jumlah erosi dan sedimentasi sesudah penataan
lereng alternatif pertama A 100,81 ton/ha/tahun dan setelah penataan lahan alternatif
kedua menjadi menjadi 75,28 ton/ha/tahun untuk selanjutnya dapat dilihat pada
(Tabel 5.2). Dari tabel tersebut dapat dilihat perbedaan hasil pada alternatif penataan
lahan pertama dan alternatif penataan lahan kedua, untuk itu pemilihan model
alternatif diambil yang mempunyai tingkat erosi dan sedimentasi yang rendah dan
efektif. Untuk A dapat memilih alternatif kedua dengan tingkat erosi dan
sedimentasi sebesar 75,28 ton/ha/tahun . untuk lereng B dapat memilih alternatif
pertama dengan tingkat erosi dan sedimentasi sebesar 94,04 ton/ha/tahun. Dan yang
terakhir untuk lereng C dapat memilih alternatif kedua dengan tingkat erosi dan
sedimentasi sebesar 77,76 ton/ha/tahun. Perhitungan erosi sedimentasi tersebut
dapat dilihat pada (Lampiran I).
PT. Jorong Barutama Greston in South Kalimantan used the open pit (surface
mining) are formed as a result of the mining of mined land that conditions are very
different from the previous situation, where the mined land has been damage to the
topography, the loss of top soil (top soil) , landslides, presence of stagnant water, the
soil becomes barren and rocky, drop in the water table, as well as the formation of
basins that are large in area mined so difficult to be utilized. From the results of
measurements and calculations at the UC West pit, it can be Classify the location of
A = 25% categorized somewhat steep, while the location of B = 16.95% categorized
rather steep and C = 23.75% were categorized based on somewhat steep (Tabel3.3
Classification Slope steepness). Condition the soil in the pit UC West can be said to
be very bad because according to the results of laboratory PT. Jorong Barutama
Greston show parameter earth elements such as C, N, K, Na, Ca, Mg has a relatively
low dignity can be seen in (Appendix G). This is evident by the length of plant
growth have been planted on the site. Reduced nutrient elements should be fertilizing
or mulch sowing in the form of dried leaves and bark are pounded so that the soil
becomes more fertile.
Erosion is a process of exfoliation and removal of soil particles or rock due to
kinetic energy (water, snow, wind) (Minister, 2009). To estimate the amount of
erosion caused by water in an area can be used equation USLE (Universal Soil Loss
Equation), according to Wischmeier and Smith (1960). Based on the calculation of
the level of erosion and sedimentation at the UC West A pit amounted to 97.13 ton /
ha / year, West B UC pit amounted to 92.50 ton / ha / years and pit berjumlah142
UC West C, 02 tons / ha / year (Appendix H) , from these results it is classified
according to the Department of Forestry and Harkat were between 60-180 ton / ha /
year. From the calculation of erosion and sedimentation that has to restructure the
apparent slope comparison. The results of calculation of the amount of erosion and
sedimentation after a first alternative arrangement slopes 100.81 tons / ha / year and
after the second alternative landscaping be 75.28 tons / ha / year to the next can be
seen in (Table 5.2). From the table it can be seen the difference in the results of first
alternative landscaping and second alternative landscaping, to the selection of an
alternative model that has taken the level of erosion and sedimentation are low and
effective. For A second alternative can choose the level of erosion and sedimentation
by 75.28 ton / ha / year. for the slope B can choose the first alternative with erosion
and sedimentation rate of 94.04 tons / ha / year. And the latter to the slope C may
choose an alternative second with erosion and sedimentation rate of 77.76 tons / ha /
year. Calculation of sediment erosion can be seen in (Appendix I).
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 24 May 2016 03:18 |
Last Modified: | 24 May 2016 03:18 |
URI: | http://eprints.upnyk.ac.id/id/eprint/2254 |
Actions (login required)
![]() |
View Item |