LANTANG, HARRY KURNIAWAN (2013) RANCANGAN TEKNIS PENAMBANGAN BATUBARA DI PIT JUMBO PT GUNUNGBAYAN PRATAMACOAL BLOK II KABUPATEN KUTAI BARAT KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
|
Text
RINGKASAN.pdf Download (88kB) | Preview |
|
|
Text
ABSTRACT.pdf Download (152kB) | Preview |
Abstract
PT. Gunungbayan Pratamacoal (PT. GBPC) Blok II merupakan salah satu perusahaan swasta nasional yang bergerak dibidang pertambangan batubara yang terletak di Desa Muara Tae, Kecamatan Jempang, Kabupaten Kutai Barat, Propinsi Kalimantan Timur sebagai pemegang PKP2B (KW. 05PB0157) generasi ke II seluas 15.690 Ha. Dalam melakukan aktifitas penambangan, PT. Gunungbayan Pratamacoal menggunakan sistem tambang terbuka. Penelitian ini dilakukan karena terjadi perubahan pada overall striping ratio yang semula 23 : 1 menjadi 18 : 1 sehingga PT. GBPC membutuhkan rancangan teknis penambangan dengan nilai maksimal overall stripping ratio sebesar 18 : 1. Kegiatan penambangan dilakukan di Pit Jumbo pada seam 7, seam 8, dan seam 9 yang merupakan Pit Pengembangan (Extention Pit) dengan jumlah lapisan tanah penutup 61.239.924 BCM dan cadangan batubara mencapai 3.811.021 Ton akan dilakukan dengan jangka waktu 21 bulan yaitu bulan Juni 2013 sampai dengan Februari 2015. Hasil yang diperoleh untuk penjadwalan produksi batubara pada daerah penelitian yang dilakukan selama 7 triwulan yakni: a. Triwulan ke-1, pengupasan overburden sebesar 10.838.301,90 BCM dan batubara yang dapat digali sebesar 561.066,21 Ton dengan stripping ratio 19,3 : 1. b. Triwulan ke-2, pengupasan overburden sebesar 11.027.412,02 BCM dan batubara yang dapat digali sebesar 571.065,25 Ton dengan stripping ratio 19,3 : 1. c. Triwulan ke-3, pengupasan overburden sebesar 10.279.761,08 BCM dan batubara yang dapat digali sebesar 531.533,81 Ton dengan stripping ratio 19,3 : 1. d. Triwulan ke-4, pengupasan overburden sebesar 10.807.132,87 BCM dan batubara yang dapat digali sebesar 559.418,17 Ton dengan stripping ratio 19,3 : 1. e. Triwulan ke-5, pengupasan overburden sebesar 8.723.794,17 BCM dan batubara yang dapat digali sebesar 560.830,26 Ton dengan stripping ratio 15,5 : 1. f. Triwulan ke-6, pengupasan overburden sebesar 7.248.521,61 BCM dan batubara yang dapat digali sebesar 576.838,73 Ton dengan stripping ratio 12,6 : 1. g. Triwulan ke-7, pengupasan overburden sebesar 2.315.000,35 BCM dan batubara yang dapat digali sebesar 450.268,57 Ton dengan stripping ratio 5,1:1. PT. Gunungbayan Pratamacoal (PT. GBPC) Blok II is a private company which is engaged of coal mining located at Muara Tae, Jempang District, West Kutai, East Kalimantan as the holder second generation PKP2B (KW. 05PB0157) covering area of 15.690 Ha. In conduct mining activities, PT. Gunungbayan Pratamacoal using surface mining system. This research was conducted because there was a change in the overall stripping ratio of the original 23: 1 to 18: 1 so that PT. GBPC requires mining engineering designs with overall stripping ratio of 18: 1. Mining activities carried out in Pit Jumbo for seam 7, seam 8, and seam 9, which it’s extension pit with the amount of overburden 61.239.924 BCM and 3.811.021 Tons of coal reserves will be conducted for period of 21 months that is June 2013 to February 2015. The results obtained for scheduling the production of coal in the area of research for 7 quarter : a. 1st quarter, overburden stripping of 10.838.301,90 BCM and coal production amounted to 561.066,21 Tons with stripping ratio of 19,3: 1. b. 2nd quarter, overburden stripping of 11.027.412,02 BCM and coal production amounted to 571.065,25 Tons with stripping ratio of 19,3: 1. c. 3rd quarter, overburden stripping of 10.279.761,08 BCM and coal production amounted to 531.533,81 Tons with stripping ratio of 19,3: 1. d. 4th quarter, overburden stripping of 10.807.132,87 BCM and coal production amounted to 559.418,17 Tons with stripping ratio of 19,3: 1. e. 5th quarter, overburden stripping of 8.723.794,17 BCM and coal production amounted to 560.830,26 Tons with stripping ratio of 15,5: 1. f. 6th quarter, overburden stripping of 7.248.521,61 BCM and coal production amounted to 576.838,73 Tons with stripping ratio of 12,6: 1. g. 7th quarter, overburden stripping of 2.315.000,35 BCM and coal production amounted to 450.268,57 Tons with stripping ratio of 5,1: 1.
Item Type: | Thesis (Other) |
---|---|
Subjects: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Eko Suprapti |
Date Deposited: | 23 May 2016 03:51 |
Last Modified: | 23 May 2016 03:51 |
URI: | http://eprints.upnyk.ac.id/id/eprint/2075 |
Actions (login required)
View Item |