NOVIAN, GANANG AKHMAD (2014) KAJIAN TEKNIS PRODUKSI BULLDOZER CATERPILLAR D9R UNTUK MENDUKUNG KEGIATAN PENAMBANGAN DI PT. CIPTA KRIDATAMA KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.
Preview |
Text
RINGKASAN.pdf Download (45kB) | Preview |
Abstract
RINGKASAN
PT. Cipta Kridatama (PT. CK) merupakan salah satu anak perusahaan dari
Tiara Marga Trakindo Utama Group yang bergerak dibidang pertambangan. PT.
CK berdiri pada tahun 1997 dan memiliki beberapa site yang tersebar di Pulau
Sumatera dan Kalimantan. Dalam penelitian ini PT. CK bertindak sebagai
kontraktor dari PT. Mahakam Sumber Jaya (PT.MSJ) yang menangani pengupasan
lapisan tanah penutup.
Lokasi Penambangan terletak di Provinsi Kalimantan Timur, tepatnya di Desa
Makarti, Kecamatan Marang Kayu, Kabupaten Kutai Kartanegara. Sistem
penambangan yang digunakan oleh PT. CK adalah sistem tambang terbuka (surface
mining). Kegiatan pengupasan lapisan tanah penutup di PT. CK dilakukan dengan
cara mekanis yaitu kombinasi kerja antara alat muat dan alat angkut. Selain
penggunaan alat mekanis utama (alat muat dan alat angkut), keberadaan peralatan
mekanis pendukung (unit support) juga diperlukan. Alat mekanis pendukung
merupakan salah satu sarana untuk menunjang pekerjaan alat mekanis utama.
PT. CK menggunakan bulldozer pada kegiatan pembuatan jalan dan
penimbunan. Berdasarkan kenyataan di lapangan masih sering terjadi banyak
masalah yang dilakukan oleh bulldozer yang berada pada lokasi penimbunan
sehingga produksi yang dilakukan belum optimal. Target produksi untuk
pengupasan lapisan penutup rata-rata adalah 1.916.529 BCM/bulan, sedangkan dari
data perusahaan didapatkan produksi aktualnya sebesar 1.675.970 BCM/bulan.
Oleh karena itu produksi bulldozer perlu dioptimalkan supaya dapat memenuhi
target produksi yang ditetapkan oleh perusahaan.
Kajian tentang faktor penghambat produksi yang menyebabkan target
produksi tidak tercapai harus dilakukan, terdapat lima faktor penghambat produksi
yaitu faktor manusia, mesin, material, metode, dan lingkungan. Setelah dilakukan
perbaikan faktor penghambat produksi maka waktu kerja efektif akan meningkat
yang semula 442 menit/shift menjadi 547 menit/shift, peningkatan waktu kerja
efektif juga berpengaruh terhadap efisiensi kerja, efisiensi kerja meningkat yang
semula 69% menjadi 80%. Setelah terjadi peningkatan efisiensi kerja maka
produksi bulldozer meningkat menjadi 1.972.080 BCM/bulan, sehingga mampu
untuk memenuhi target produksi.
ABSTRACT
Cipta Kridatama Mining Ltd. is one of mining group company of Tiara Marga
Trakindo Utama that develops in mining sector. Cipta Kridatama Mining Ltd. was
established in 1997 and has some spreaded site on the island of sumatra and
kalimantan. In this research Cipta Kridatama Mining Ltd. as a contractor of
Mahakam Sumber Jaya Mining Ltd who operates stripping of the overburden.
Mining site located in the village Makarti of east kalimantan province , the
sub-district of Marangkayu, the district of Kutai Kartanegara. Mining system used
by Cipta Kridatama Mining Ltd. is surface mining method. The activities of
stripping overburden in Cipta Kridatama Mining Ltd. carry on by a mechanical
method which is a combination of loader and hauler. The production of loader and
hauler is closely related to the activity of unit support.
Cipta Kridatama Mining Ltd uses bulldozer in the developing of the road and
stockpiling. Based on the actual activities of Bulldozer, there are still a lot of
problems that are made by the bulldozer on the disposal area, so the production
target is not reached. The average production target for overburden is 1.916.529
BCM per month, while the actual data production is 1.675.970 BCM per month, so
the Bulldozer need to be optimized to reach the production target.
The study about a constrain factors to production that causing the production
target is not reached are needed, from the study of constrain factors, there are five
constrain factors to the production such as human factor, a machine factor, material
factor, method factor, and the environment factor. After optimalizing the constrain
factors of production, so effective working time will increased which was 442
minutes per shift to 547 minutes per shift and also increase effective working time.
The increasing of effective working time can affect the working efficiency, the
efficiency of work which was 69 percent increased to 80 percent. After the
increasing of work efficiency, bulldozer production increased to 1.972.080 BCM
per month, so the production target can be reached.
Item Type: | Thesis (Other) |
---|---|
Subjek: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Ratna Sufiatin |
Date Deposited: | 20 May 2016 07:19 |
Last Modified: | 20 May 2016 07:19 |
URI: | http://eprints.upnyk.ac.id/id/eprint/1983 |