KAJIAN TEKNIS SISTEM PENYALIRAN PADA TAMBANG TERBUKA DI PT. JORONG BARUTAMA GRESTON PROVINSI KALIMANTAN SELATAN

PRATIWI, AGRA WIDYA (2014) KAJIAN TEKNIS SISTEM PENYALIRAN PADA TAMBANG TERBUKA DI PT. JORONG BARUTAMA GRESTON PROVINSI KALIMANTAN SELATAN. Other thesis, UPN "Veteran" Yogyakarta.

[thumbnail of RINGKASAN.pdf]
Preview
Text
RINGKASAN.pdf

Download (49kB) | Preview

Abstract

RINGKASAN
PT. Jorong Barutama Greston terletak di Kecamatan Jorong, Kabupaten Tanah
Laut, Provinsi Kalimantan Selatan. Sistem penambangan yang dilakukan
menggunakan sistem tambang terbuka (Surface Mining) dengan metode Open Pit.
Salah satu kegiatan pendukung dari usaha penambangan adalah penyaliran, yang
berfungsi untuk mencegah masuknya air (Mine Drainage System) dan mengeluarkan
air (Mine Dewatering System). Air tambang yang tidak ditanggulangi dengan baik
dapat mengganggu operasi penambangan. Dengan adanya kemajuan tambang maka
sistem penyaliran tambang ikut berubah, misalnya sumuran sementara yang
berpindah-pindah. Oleh karena itu diperlukan kajian terhadap sistem penyaliran
tambang yang ada. Berdasarkan analisis data curah hujan tahun 2004-2013, diperoleh
curah hujan rencana sebesar 140,65 mm/hari, intensitas curah hujan sebesar
48,76 mm/jam dengan periode ulang hujan 2 tahun dan resiko hidrologi sebesar
93,75%. Daerah tangkapan hujan (DTH) pada lokasi penelitian dibagi menjadi
4 DTH, yaitu DTH I 0,23 km
2
, DTH II 0,22 km
2
, DTH III (kolam pengendapan)
0,02 km
2
, dan DTH IV 0,18 km
2
. Debit air pada setiap DTH adalah DTH I
1,71 m
3
/detik, DTH II 1,65 m
3
/detik, DTH III 0,12 m
3
/detik, dan DTH 0,09 m
3
/detik.
Untuk mencegah supaya air tidak masuk ke area penambangan maka dibuat saluran
terbuka di sebelah selatan UW Pit yang mengalir ke rawa-rawa. Dimensi saluran
terbuka, yaitu lebar dasar saluran 0,09 m, lebar permukaan 1,40 m, kedalaman aliran
0,60 m, tinggi jagaan 0,10 m, kedalaman 0,70 m, panjang sisi luar saluran 0,70, dan
debit 0,09 m
3
/detik. Kemudian untuk air yang masuk ke dalam bukaan tambang UW
Pit dialirkan secara alami ke dalam sumuran. Terdapat 4 sumuran, yaitu sumuran A
7.779 m
3
, sumuran B 15.120 m
3
, sumuran C 5.710 m
3
, dan sumuran DE 11.947 m
3
.
Selanjutnya air yang terdapat di sumuran dipompa menggunakan pipa dan pompa
menuju kolam pengendapan. Jumlah pompa yang digunakan ada 3 pompa, yaitu
sumuran A menggunakan pompa Multiflo 180, sumuran B pompa Multiflo 390, dan
sumuran DE Multiflo 180.Kolam pengendapan UW Pit memiliki 3 kompartemen
sedangkan untuk waktu pengerukan lumpur dilakukan setiap 132 hari sekali atau
sekitar 4,5 bulan sekali.

ABSTRACT
PT. Jorong Barutama Greston located in District of Tanah Laut, South
Kalimantan Province. Mining system to exposed coal which implemented is surface
mining system with open pit method. One of the additional activity in mining is
water management which has the function to prevent the water (mine drainage) or
remove the water that already entered pit (mine dewatering). Water that is not well
managed can negatively affect the mining operations. Mine sequence made the
system of water management changed. Because of that, evaluation of water
management system is needed. Based on analysis of rainfall data for the year
2004-2013, the plan obtained by precipitation is 140,65 mm/day, the intensity of
rainfall is 48,76 mm/hr with a 2 year return period rainfall and hydrological risk of
93,75%. Catchment area in research location is divided into 4 catchment areas,
catchment area I 0,23 km
2
, II 0,22 km
2
, III (settling pond) 0,02 km
2
, and
IV 0,18 km
2
. Debit catchment area I 1,71 m
3
/s, I 1,65 m
3
/s, III 0,12 m
3
/s, and DTH
IV 0,09 m
3
/s. To prevent that water does not enter the mining area then made open
channels in the south UW Pit flowing into the marshes. Open channel dimensions,
namely the width of the base line 0,09 m, surface width 1,40 m, depth of flow of
0,60 m, 0,10 m high surveillance, depth of 0,70 m, the length of the outer side
channel 0,70, and discharg 0,09 m
3
/ sec. Then for the water that goes into the mine
openings UW Pit flowed naturally into the sump. There are 4 sump, sump A
7.779 m
3
, sump B 15.120 m
3
, sump C 5.710 m
3
, and sump DE 11.947 m
3
.
Furthermore, the water contained in the sump is pumped through pipes and pumps to
the settling ponds. The number of pumps that are used there are 3 pumps, sump A
with Multiflo pump 180, sump B with Multiflo pump 390, and sump DE with sump
Multiflo 180. Settling pond UW Pit has 3 compartments, while for the time dredging
sludge can be done every 132 days or about 4,5 months.

Item Type: Thesis (Other)
Subjek: T Technology > TN Mining engineering. Metallurgy
Divisions: x. Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Ratna Sufiatin
Date Deposited: 20 May 2016 07:13
Last Modified: 20 May 2016 07:13
URI: http://eprints.upnyk.ac.id/id/eprint/1976

Actions (login required)

View Item View Item