BARGAWA, Waterman Sulistyana and SUCAHYO, AGUS PANCA ADI and ANDIANI, HESTI FARRA (2019) DESIGN OF COAL MINE DRAINAGE SYSTEM. In: ICST: E3S Web of Conferences 76, 2019, -.
|
Text
2019-coal mine drainage.pdf Download (1MB) | Preview |
Abstract
Research from coal fields show that increased produ ction from coal mines resulted in a wider pit. Changes in the water catchment area resul ted in changes in the calculation of mine water volume. Excessive mine water volume affects mining activities. Large amounts of water in the pit causes disruption in excavation and loading and hau ling activities. Therefore, the design of mine drainage systems is required. The purpose of the st udy is to analyse statistically the parameters of the mine drainage system, and to design the mine dr ainage system; including open drain, sump, and settling pond. The research tools used include the calculation of runoff water discharge that requires statistical analysis for rainfall data processing a nd the determination of catchment area (CA). The open channel dimension and settling pond design is based on the sump volume calculation. The research area has high rainfall classification, sol id percent 2.66 % with settling rate 0.0027 m/s; th e time required for the particle to settle is 30.38 m inutes. The percentage of theoretically suctioned particle is 83 %, and the settling pond maintenance time that has 4 compartments is 15, 16, 19, and 23 days.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Subjects: | Q Science > Q Science (General) T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Dr.Ir.MT WATERMAN BARGAWAN SULISTYANA |
Date Deposited: | 23 May 2019 03:09 |
Last Modified: | 23 May 2019 03:15 |
URI: | http://eprints.upnyk.ac.id/id/eprint/19626 |
Actions (login required)
View Item |