RENCANA TEKNIS PENCEGAHAN AIR ASAM TAMBANG DENGAN METODE ENCAPSULATION PADA PIT 3000 BLOCK 5 SOUTH BLOCK DI PT. TRUBAINDO COAL MINING KABUPATEN KUTAI BARAT KALIMANTAN TIMUR

BAWONO, SAN NIR WESTY POPPY (2014) RENCANA TEKNIS PENCEGAHAN AIR ASAM TAMBANG DENGAN METODE ENCAPSULATION PADA PIT 3000 BLOCK 5 SOUTH BLOCK DI PT. TRUBAINDO COAL MINING KABUPATEN KUTAI BARAT KALIMANTAN TIMUR. Other thesis, UPN "Veteran" Yogyakarta.

[img]
Preview
Text
ABSTRACT.pdf

Download (83kB) | Preview

Abstract

PT. Trubaindo Coal Mining (PT. TCM) merupakan perusahaan yang bergerak dalam bidang pertambangan batubara yang lokasinya secara administratif berlokasi di Kecamatan Melak, Kabupaten Kutai Barat, Provinsi Kalimantan Timur. PT. TCM menggunakan sistem penambangan strip mine yang secara langsung maupun tidak langsung dapat mengubah bentuk bentang alam di sekitar lokasi penambangan. PT. TCM merencanakan melakukan kegiatan penambangan di South Block pada dua Pit, yakni Pit 2600 Block 5 (P2600Bk05) dan Pit 3000 Block 5 (P3000Bk05) dengan memindahkan material tanah penutup (Overburden atau OB) sebanyak 8.064.200 BCM, dan sebanyak 185.300 BCM atau sekitar 2,3% dari total OB yang akan dipindahkan terkategorikan sebagai material Potential Acid Forming (PAF) dan 7.878.900 BCM atau 97,7% merupakan Non Acid Forming (NAF). Air Asam Tambang terbentuk akibat terjadinya proses oksidasi antara mineral sulfide, air, dan udara, sehingga harus dilakukan pencegahan agar tidak terjadi kontak antara ketiga elemen tersebut. Pencegahan yang dapat dilakukan adalah dengan melakukan penanganan terhadap tanah penutup yang berpotensi pembentuk asam. Dalam mencegah terbentuknya Air Asam Tambang, maka timbunan (penempatan) material PAF dan NAF tersebut haruslah direncanakan dan dijadwalkan dengan baik. Desain timbunan terpengaruh oleh beberapa faktor, yaitu : 1. Jumlah dan persentase material batuan penutup yang akan ditimbun. 2. Topografi daerah penimbunan. Lokasi penimbunan yang digunakan adalah inpit dump (material tanah penutup ditimbun kembali ke lokasi pit yang telah selesai digali) yaitu di Ex-Pit 3000 Block 7 dan lokasi outpit dump (material tanah penutup ditimbun di luar pit) yaitu di jalan Hauling. Metode yang digunakan untuk menangani material PAF adalah Metode Kapsulasi PAF yaitu menempatkan material PAF di dalam disposal dan dilapisi oleh material NAF. SOP PT. TCM menentukan bahwa tebal NAF untuk kapsulasi adalah 3 m, namun dalam penelitian ini disimpulkan bahwa sebenarnya material NAF dapat melapisi PAF dengan ketebalan lebih dari 3 m yaitu 5 m, bahkan hingga 10 m karena material NAF yang terdapat pada tanah penutup yang akan dipindahkan oleh PT. TCM mencukupi untuk membentuk lapisan tersebut (Volume NAF 7.878.900 BCM atau 97,7% dari keseluruhan volume tanah penutup). PT. Trubainco Coal Mining (PT. TCM) is a company engaged in coal mining which are located administratively included in the Subdistrict of Melak, West Kutai Regency, East Kalimantan Province. PT. TCM using open pit mining system with strip mine method that directly or indirectly can change the natural landscape surrounding the mining. PT. TCM planned mining operation in South Block on two Pit, on Pit 2600 Block 5 (P2600Bk05) and Pit 3000 Block 5 (P3000Bk05) to move the overburden material (overburden or OB) as much as 8.064.200 BCM, and as much as 185.300 BCM or approximately 2,3% of total OB to be moved is classified as material Potential Acid Forming (PAF) and 7.878.000 BCM or 97,7% are Non Acid Forming (NAF). Acid Mine Drainage is formed due to the oxidation processes include sulfide minerals, water, and air, so it must be done in order to avoid the preventation of contact between these elements. Prevention that can be done is to make the handling of the Potential Acid Forming materials. In preventing the formation of Acid Mine Drainage, the placement of PAF and NAF materials must be planned and scheduled well. Disposal design influenced by several factors, that is : 1. Amount and percentage of overburden material will be disposed. 2. Topography of the disposal area Hoarding location used is inpit dump (overburden material backfilled pit in the location that has been finished pit) that is on Ex-Pit 3000 Block 7 and outpit dump location (overburden material disposed outside the pit) that is on hauling road. The method used to handle PAF materials was encapsulation method by placing the PAF materials and covered by the NAF materials. PT. TCM SOP determines that the thickness of NAF that used to the encapsulation method was 3 m, but in this research it was found that in fact they can capsulating the PAF material with a thickness of more than 3 m, is a minimum thickness of 5 m, even up to 10 m because NAF material contained on overburden is sufficient to form the layer (NAF volume 7.878.900 BCM or 97,7% of the total overburden volume).

Item Type: Thesis (Other)
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Faculty of Engineering, Science and Mathematics > School of Engineering Sciences
Depositing User: Eko Suprapti
Date Deposited: 20 May 2016 06:22
Last Modified: 20 May 2016 06:22
URI: http://eprints.upnyk.ac.id/id/eprint/1940